Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990)
ML20064A804
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 09/05/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009280116
Download: ML20064A804 (2)


Text

, t Q ;y9 -

wn Duke P6u'er Company lin B. kur

- PO Bax 33198 . Vice President Charlotte, NC 28242 l Nuclear Production .

(WI)373-4531

- DUKE POWER '

September 5, 1990 U. S. Nuclear Regulatory Commission ATTN- Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2-Docket Nos. 50-413 and 50-414 NRC Inspection Report Nos. 50-413 and-50-414/86-18-01 Revision to Commitment Date Gentlemen:

My March 1.-1989 response to Violation 50-414/86-18-01 concerning failure to-lock valves as specified in applicable operating procedures, stated Catawba was evaluating the use of a more substantial locking device for.these type.

of valves and the final approval process for this modification:vas in-progress. I also stated that based on the expected July, 1989 delivery date-for necessary parts, installation of the locking mechanism on all applicable valves outside Containment would be completed by the end of August, 1989.

.Due'to the inaccessibility of valves in Containment, all locking mechanisms would be installed by the end of the next Unit 2 refueling outage-(approximately August, 1990).

This-modification has been approved, however, the necessary parts will not-be-'on site until October, 1990. Installation of the locking mechanism on

,all valves outside of Containment will be completed by the end of March, 1991.

Due to inaccessibility of valves inside Containment, we will complete all L

corrective actions'and be in full compliance when an outage of adequate l duration allows for implementation. During each shutdown, based on system L load demands, we will install as many devices as time permits. The expected' L date of full compliance will be no later than- the end of the next Unit 2 i . refueling outage'(approximately November, 1991).

'Very truly yours, k&r  %

llal B. Tucker WRC/181/lcs . . . . .

0 ,,, 4 .

9009280116 900905 2 gDR ADOCK O gi3 l ggf -

7 ip

Wg '

q:, .e' g' 1s*,

U; S. Nuclear Regulatory Commission September 5, 1990 Page 2 xc Mr.:S.-D. Eb' noter Regional Administrator U. S. Nuclear Regulatory Commission

-Region-11

101 Marietta St., NW, Suite 2900

n. Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station b \

.