ML20058J180

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to PECP-COLR-L1R4, Core Operating Limits Rept for Limerick Generating Station Unit 1 Reload 4,Cycle 5
ML20058J180
Person / Time
Site: Limerick Constellation icon.png
Issue date: 12/02/1993
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058J183 List:
References
NUDOCS 9312130442
Download: ML20058J180 (3)


Text

a , I PHILADELPHIA ELECTRIC COMPANY >

NUCLEAR GROUP HEADQUARTERS i 955-65 CHESTERBROOK BLVD.

WAYNE, PA 19087-5691 (2* " " December 2, 1993 Docket No. 50-352 License No. NPF-39 STATION SUPPORT DEPARTMENT US Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

Limerick Generating Station, Unit 1 ,

Issuance of Revision 2 of the Core Operating Limits Report for Unit 1 Cycle 5, Reload 4 Gentlemen:

Enclosed is a copy of Revision 2 of the Core Operating Limits Report (COLR) for Limerick Generating Station (LGS), Unit 1, Cycle 5, Reload 4, that was issued on November 18, 1993. This revision is being submitted in accordance with LGS, .

Unit 1 Technical Specifications (TS) Section 6.9.1.12. Revision 1 of this COLR  !

was cancelled prior to issuance, and therefore was not implemented. This revision of the COLR is being issued on a page replacement basis, and page change  ;

instructions are included in the enclosure.  !

Revision 2 of the COLR for LGS, Unit 1, Cycle 5, Reload 4 incorporates updated Minimum Critical Power Ratio (MCPR) operating limits based on an analysis f or increased core flow, i.e., from 105% to 110% of rated core flow, and final t feedwater temperature reduction, i.e., from 60 degrees Fahrenheit to 105 degrees Fahrenheit. While only some ef the MCPR operating limits associated with the Recirculation Pump Trip and/or inoperable Turbine Bypass Valves have changed, MCPR operating limits associated with nominal operating conditions are unchanged. ,

If you have any questions, please do not hesitate to contact us. l Very truly yours, ,

.v.

G. A. Hunger,

~ .p.

rector Licensing Section Enclosure  !

g cc: T. T. Martin, Administrator, Region 1, USNRC, w/ enclosure l N. S. Perry .ilSNRC Resident inspector, LGS w/ enclosure l 9312130442 931202 l PDR ADOCK 05000352 1 p PDR ,

. . i bcc: "

D. M. Smith - 52A-7 w enclosure  !

D. R. Helwig - LGS, SMB1-1  !

J. B. Cotton - 53A-1 ,

l R. W. Boyce - LGS,.GML 5-1 -

i H. J. Diamond - 62A-5 ,,

1 R. M. Krich - 62A-1 ,,

I J. L. Kantner - LGS, SMB2-4 - "

J. f. Hufnagel - LGS, SMB3 o PA DER BRP Inspector - LGS, SMB2-4 -

i Commitment Coordinator - 52A-5 -

Correspondence Control Desk - 618-3 w/ enclosure  :

DAC - 618-5 w/ enclosure ,

9 f

i i

t d

r a.

i LIMERICK G,ENERATING STATION  !

l UNIT 1 COLR LlR4 PAGE CHANGE INSTRUCTIONS 4

UNIT 1 OPERATING LICENSE:

Remove Page Insert Page None None  :

UNIT 1 TECHNICAL SPECIFICATIONS:

Remove Page Insert Page None None UNIT 1 CORE OPERATING LIMITS REPORT  ;

Remove Page Insert Page Cover Sheet Cover Sheet Dated May 11, 1992 Dated September 28, 1993 Page 2, Revision 0 Page 2, Revision 2 Page 3, Revision 0 Page 3, Revision 2 Page 4, Revision 0 Page 4, Revision 2 i i

Page 12, Revision 0 Page 12, Revision 2 l Page 13, Revision 0 Page 13, Revision 2 j Page 14, Revision 0 Page 14, Revision 2 2 Page 15, Revision 0 Page 15, Revision 2 i Page 16, Revision 0 Page 16, Revision 2 Page 17, Revision 0 Page 17, Revision 2

)

I l

i l

1 I

9/28/93 amend COL LlR4:548

.. - ___ __