ML20055H413

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04
ML20055H413
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 07/16/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055H414 List:
References
NUDOCS 9007260173
Download: ML20055H413 (4)


Text

..$tAhs i <,._

c a '

p' . fi- Le,- .

  • ' PO flat 31198 . g., y,,g,,,

Charlotte, N C NH2 ,

y.p.g, p,,,y.

(7%)3?] 1211 '

k - DUKE POWER '-

.Julyc16, 1990.

Document Control Desk i U.S. Nuclear Regulatory Commission  !

Washington, D.C.'20555 Re: Catawba. Nuclear Station 'l' 9 Docket'Nas. 50-4 D and 50-414 c Emerger,cy Pfan Implementing Procedures

DearSIr:

Please fisd' enclosed for.NRC Staff use and review the following Emergency Pun Implementing Procedures:

~RP/0/A/5000/0i -- Natural Disaster and Earthquake Environmental Monitoring For Emergency Conditions Within HP/0/B/1009/04 -

The Ten Mile-Radius of Catawba Nuclear Station t

H

!=

Due to an' administrative error, this-is being sent late. Hope this l l 'I 0 -does not inconvenience you'.

This revision is being submitted in accordance with 10 CFR' 50.54(q) and'does not decrease the effectiveness of the Emergency  !

Plan Implementing Procedures or the Emergency Plan.

Please delete privacy material in the form of personal l telephone numbers prior to placing in the Public Document Room.

l-  !

By copy of-this. letter, two copies of the above document are j being provided to the NRC, Region 11. >

Very truly yours, A W Hal B. Tucker l 6

HAF/haf  !

Attachment 0F y 72 73 900716 ' a F OK 03000423 , I PDC <

n

1

. l1 3L 7 i p . -

~ '

7 .- -

. y 4 ,

)

CATAWBA NUCLEAR STATION l

IN/0VT OF STATION DOCUME!(T TRANSt!ITTAL .l DATE: MAY-24, 1990- )

CONTROL NO. [h TD: daftY OC '1

/ '

DOCUtd)tT(S): EMERGENCY PLAN IMPLEMENTING PROCEDtlRES - CATAWRA l

1 REMOVE INDEX PAGES 1 & 2 DATED MAY 7. 1990.

. '1 '

IN' SERT INDCX PAGES 1 & 2 DATED MAY 23. 1990.

1 i REMOVE OLD PROCEDURE AND INSERT NEW.

l DATE-APPROVED -l

[

PROCEDURE # RP/0/A/5000/07 5/23/90-HP/,0/8/1009/04 5/10/90

. l In Station - Please sign Distribution Index Log when picking up i this document. .

Out of Station - Please sign and return this transmittel within within thirty (30) working days indicating you have received the j attached to: Catawba Nuclear Station, Master File, Document Control l Out of Station - Inforeation Only Copy. This copy cannot be used l' to perform any work. These revisions cannot be used for developing

, programs or p;ocedures. Revisions will continue to be issued;

! however, do not sign this form and return it.

Received by:

Date:

1'

\

l l

r

- . x -..-_ - ---_ - -. . - _ _. _

7,E ., +

ls  ;( .

.4 ,

.Page-1 of 2' i

DUKE POWER COMPANY.

CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES-INDEX PROCEDURE #- TITLE  ;

RP/0/A/5000/01 Classification of Emergency-(03/06/90)-

RP/0/A/5000/02 Notification of Unusual Event-(11/02/89)

RP/0/A/5000/03 Alert (11/02/69)  :

RP/0/A/5000/04 Site. Area Emergency (11/02/89)

RP/0/A/5000/05 General Emergency (11/02/89)-

RP/0/A/5000/06 Follow-up Notification (09/01/89)

RP/0/A/5000/07 Natural Disaster and Earthquake (05/23/90)'

i

/RP/0/A/5000/08 Release of A Hazardous Substance (03/03/89)  :

l RP/0/A/5000/09 Collision / Explosion-(07/30/87)

-RP/0/A/5000/10' Conducting A Site' Assembly or Evacuation (07/15/88) l RP/0/A/500b/11- Protective Action Reconsnendations-Without The OAC-(10/19/88) m'

'RP/0/B/5000/12 Control of Assessnont and Repair Teams (01/06/88)

RP/0/B/$000/13. NRC Notification Requirements (05/19/89) s >.

[!

RP/0/B/5000/14 Follow-up Notifications From TSC (09/01/89) j HP/0/B/1000/06 Emergency Equipment Functional Check and.

Inventory (04/23/90) l s

HP/0/B/1009/01 Health Physics. Recovery Plan (08/18/87) i HP/0/B/1009/03 Health Physics Response Following a Primary  ;

to Secondary Leak (05/11/89)

HP/0/B/1009/04 Environmental Monitoring for Emergency Conditions Within the Terdtile Radius of Catawba Nuclear

'l Stetion (05/10/90)

HP/0/B/1009/05 Personnel / Vehicle Monitoring for Emergency conditions (01/12/87)

May 23, 1990

L'  %

, LP ,,, , , , ,

+1 , _

1_

Page 2 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION ,

EMERGENCY PLAN IMPLEMENTING PROCEDURES-INDEX 1 PROCEDURE # TITLE

- HP/0/B/1009/06 Alternative Method for Determining Dose Rate Within the Reactor Building (01/12/87)

HP/0/B/1009/07 In-plant Particulate and Iodine Monitoring Under Accident Conditions (04/14/89)

HP/0/B/1009/08 Contamination Control During Transportation of Contaminated Injured Individuals (01/31/90) l HP/0/B/1009/09: . Guidelines for Accident and Emergency Response 1 1m (02/01/90)

HP/0/B/1009/12 Quantifying Gaseous Releases through Steam Relief Valves Under Post-Accident Conditions (02/15/85)

HP/0/B/1009/14 Health Physics Actions Following an Uncontrolled ,

Release of Liquid Radioactive Material (02/04/85)

HP/0/B/1009/16 Distribution of Potassium Iodide Tablet in the Event of a Radiolodine Release (10/19/87)-

HP/0/B/1009/17 Post Accident. Containment Air Sampling. System 1 (08/29/89) 1 HP/0/B/1009/18 Offsite Dose Projections (03/30/90)  ;

HP/0/B/1009/19 Emerg.ncy Radio System operations, Maintenance and Communications (01/31/90)

OP/0/A/6200/21 Operating Procedure for Sampling at the Post Accident Liquid Sample Panel (04/30/90)

CNS Directive 3.7.5 Response to Bomb Threat (04/287) <

CNS Directive 3.8.4 Onsite Emergency Organization (04/23/90)

CNS Directive 2.0.1 News Release / Rumor Control (02/15/88)

CNS Directive 3.0.7 Site Assembly / Evacuation (09/14/89)

May 23, 1990 4

~A