Bv Annual Assessment Meeting Summary and Attendance List 2018
ML18099A081
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 04/06/2018
From: Matt Young
NRC Region 1
To:
Young M
Shared Package
ML18046A504 List:
References
Download: ML18099A081 (4)


Text

{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 6, 2018 MN-18-001 MEETING

SUMMARY

LICENSEE: First Energy Nuclear Operating Company (FENOC) FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

ANNUAL ASSESSMENT MEETING

SUMMARY

On March 27, 2018 from 4:30 p.m. to 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2017. A notice of the open house was issued on March 9, 2018, and was posted on the NRCs external (public) Website. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML18067A113. ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html. The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2017, as documented in our Annual Assessment Letter dated February 28, 2018 (ADAMS Accession No. ML18047A001). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html.

2 Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations. ____/RA/_______________ Matthew R. Young, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

Attendance List ADAMS Accession No. ML18099A081

3

SUBJECT:

SUMMARY

OF PUBLIC MEETING BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATED APRIL 6, 2018 Distribution: (via e-mail) DLew, RA (R1oramail.Resource) DCollins, DRA DPelton, DRP MGray, DRP JYerokun, DRS MRYoung, DRP SShaffer, DRP ZHollcraft, DRP BLin, DRP ADiaz, AA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME: G:\DRP\BRANCH6\Communications\PUBLIC MEETINGS\Annual Assessment Meetings\2018\Beaver Valley\BV Annual Assessment Meeting Summary 2018.docx ADAMS PKG No. ML18046A504 Accession No. ML18099A801 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CES MYoung/MY DATE 04/03/18 04/06/18 OFFICIAL RECORD COPY

!JLfilt 11.

Beaver Valley Nuclear Power Station '--- Protecting People and the Environment 2018 Open House ATTENDANCE LIST Name Organization L - y-ry vJ F -, lee r rt BRf Jev1n1 -h r Vovv1C-\ hv-St En t 0Y Co rv1 VY'\ 1..u11 *cittJ 'u 11__!5

                                                   ......_J Cc.                                  Fe
                            'i
      \  - I ,'V\                   //J rl ()./')                     Co *-1111,,...,, "1 .'Ct.;i,*f.*& ,,, S
                          -- k  - c}                           r,__         n ,.-    '
      *- I 1 m
                                                                     \) \-!'
                                                                               \ *- "---'

51-e<Je S-.,,he,i L u Bv( c),./fe01