uly 26, 2019

SUBJECT:

BYRON STATIONINTEGRATED INSPECTION REPORT 05000454/2019002 AND 05000455/2019002

Dear Mr. Hanson:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Byron Station. On July 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. M. Kanavos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos.: 05000454 and 05000455 License Nos.: NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2019002 and 05000455/2019002 Enterprise Identifier: I-2019-002-0066 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: April 01, 2019 to June 30, 2019 Inspectors: S. Bell, Health Physicist D. Betancourt-Roldan, Senior Resident Inspector M. Holmberg, Senior Reactor Inspector C. Hunt, Resident Inspector C. Norton, Senior Resident Inspector J. Park, Reactor Inspector C. Thompson, Illinois Energy Management Agency D. Turpin, NRC Observer Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

Unit 2 began the inspection period at approximately 90 percent and was in coast down for a planned refueling outage. The refueling outage started April 8, 2019, and the unit went critical on April 23, 2019. The unit was returned to full power on April 27, 2019, and remained at or near full power for the majority of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection Summer Readiness Sample (IP Section 03.01)

(1) The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems on June 29, 2019

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding of River Screen House on May 23, 2019

71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

  • Low Temperature Overpressure (LTOP) System on April 9, 2019

71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02)

(1) The Inspectors Evaluated System Configurations During a Complete Walkdown of the Unit 1 Fuel Pool Cooling System on April 18, 2019

71111.05A - Fire Protection (Annual) Annual Inspection (IP Section 03.02)

(1) The Inspectors evaluated fire brigade performance on May 14, 2019

71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)

The inspectors Evaluated Fire Protection Program Implementation in the following selected areas:

(1) Fire Zone (FZ) 19.3-2, Unit 2 Miscellaneous Area Main Steam & Auxiliary Feedwater Pipe Tunnel, 377 Elevation on April 4, 2019
(2) FZ 16.1-2, Unit 2 Refueling Water Storage Tank Area on April 11, 2019
(3) FZ 5.4-2, Unit 2 Auxiliary Building Division 22, Miscellaneous Electrical Equipment &

Battery Room - 451 Elevation on April 17, 2019

(4) FZ 11.4-0, North Auxiliary Building General Area North 383 Elevation on May 1, 2019
(5) FZ 10.2-2, 2A Diesel Oil Storage Tank on May 21, 2019
(6) FZ 11.1 A-0, Unit 1 Essential Service Water Pump Room - 330-0 Elevation on June 21, 2019
(7) FZ 3.1-1, Unit 1 Auxiliary Building Cable Riser Room - 426 and 414 Elevation on June 25, 2019

71111.07A - Heat Sink Performance Annual Review (IP Section 02.01)

(1) The inspectors evaluated readiness and performance of:

Action Request (AR) 04249766; 1SI01SB Heat Exchanger Failed Generic Letter 89-13 Acceptance Criteria on May 17, 2019

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The Inspectors Verified that the Reactor Coolant System Boundary, Reactor Vessel Internals, Steam Generator Tubes, Risk-Significant Piping System Boundaries, and Containment Boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 8, 2019 to April 18, 2019:

03.01.a - Nondestructive Examination and Welding Activities

  • Ultrasonic (UT) Examination of Feedwater System Elbow-to-Pipe Weld 2FW03DA-16/C15
  • UT examination of feedwater system pipe-to-elbow weld 2FW03DA-16/C16
  • UT Examination of Feedwater System Pipe-to-Elbow Weld 2FW03DA-16/C22
  • UT Examination of Chemical and Volume Control System Pipe-to-Elbow Weld 2CVA1A-6/C08
  • UT Examination of Chemical and Volume Control System Pipe-to-Elbow Weld 2CVA1A-6/C09
  • Containment Liner UT examination at Area D2 - reduced wall thickness at Locations 1 and 3 (2017-UT-076)
  • Welds 1 and 2 fabricated during installation of valve 2CV8351 per EC 406564 (WO 01952003-01)03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities
  • Bare metal visual (VE) examination of reactor vessel head nozzles 1, 13, 58 and vent 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1) The inspectors observed and evaluated Licensed Operator Performance in the Control Room during Coast-Down activities on April 4, 2019 and April 7, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1) The inspectors observed and evaluated Operator Requalification Training on June 18, 2019

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)

The inspectors evaluated the effectiveness of routine maintenance activities associated with Equipment and/or Safety Significant Functions:

(1) Service Air (SA-1) on April 29, 2019
(2) Direct Current Power Storage and Distribution (DC-02) on June 25, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)

The inspectors evaluated the risk assessments for the following Planned and Emergent Work activities:

(1) Unit 1 Yellow Risk due to BUS 241 Outage and 2A Essential Service Water (SX) Pump Work on April 14, 2019
(2) Unit 2 Yellow Risk due to 2A SX Pump Work Window on May 1, 2019
(3) Mode Change with Technical Specification Equipment Out-of-Service (2019BY-MODE-025) on May 13, 2019
(4) AR 4246027: 1SX114A Failed to Stroke Within the Administrative Limit on May 28, 2019
(5) 1B DG Work Window on June 17, 2019

71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) AR 04217533, Calculation Error in DGD09301, 02/05/2019 on April 3, 2019
(2) AR 04235744, 1AF049D Check Valve Leakage Too High on April 9, 2019
(3) AR 04230553, 2SX265A Through Wall Leak on April 11, 2019
(4) AR 04238226, 2MS018D Open Outside of Administrative Limit on April 14, 2019
(5) AR 04239885, 2RH8701A did not Open from Main Control Board on April 14, 2019
(6) AR 04239471, Ultrasonic Testing Readings Below 87.5% on 2AF01AB Inlet/Outlet Piping on April 17, 2019

71111.19 - Post-Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)

The inspectors evaluated the following post maintenance tests:

(1) 2A EDG Monthly Run Following Troubleshooting and Repairs on April 2, 2019
(2) 2A SX Pump Run Following Maintenance on April 16, 2019
(3) 2CV8100 Valve Stroking Following Controller Switch Replacement on April 16, 2019
(4) Rod Drop Testing on April 23, 2019
(5) Low Power Physics Testing on April 23, 2019
(6) Automatic Voltage Regulator (AVR) Test at Full Turbine Speed Prior to Generator Synchronization on April 24, 2019
(7) 1B Auxiliary Feedwater Pump Run Following Work Window on May 21, 2019

71111.20 - Refueling and Other Outage Activities Refueling/Other Outage Sample (IP Section 03.01)

(1) The inspectors evaluated Outage B2R21 activities from April 7, 2019 to April 27, 2019

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Containment Isolation Valve Testing (IP Section 03.01)

(1) 2BOSR 6.1.1-10, Primary Containment Type C Local Leakage Rate Test and Inservice Test (IST) of Reactor Building Drains and Vents System on April 11, 2019

Inservice Testing (IP Section 03.01) (2 Samples)

(1) 2BOSR 5.5.8.AF.5-1C, IST Requirements for the Motor Driven Auxiliary Feedwater pump 2AF01PA on April 4, 2019
(2) 0BOSR 5.5.8.SX.5-2C, IST Requirements For Essential Service Water Makeup Pump 0B on April 25, 2019

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Work Order 4698419, Main Steam Safety Valves Operability Test on April 3, 2019
(2) 2BOSR 3.8.11.1, 2A DG Load Sequencing Test on April 17, 2019
(3) 1BOSR 8.1.8-1, 1A DG Crosstie to BUS 241 and Crosstie to BUS 141 18-month Surveillance on May 1,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls Contamination and Radioactive Material Control (IP Section 02.03)

(1) The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:
(1) The inspectors evaluated Risk-Significant High Radiation Area and Very High Radiation Area Controls

Instructions to Workers (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated Instructions to Workers Including Radiation Work Permits used to access High Radiation Areas Radiation work packages
  • Radiation Work Permit (RWP) BY-2-19-00670; 2RC8003C Valve Work; Revision 1
  • RWP BY-2-19-00613; Reactor Head Disassembly/Reassembly; Revision 0 Electronic alarming dosimeter alarms
  • Dose Alarm 09/20/18 1CV8389A Valve Work
  • Dose and Dose Rate Alarms 03/27/19 U2 Containment Entry
  • Dose Rate Alarm 11/8/18 Ladder Inspection Labeling of containers
  • Fuel Handling Building Storage Containers
  • Sealand Transportation Containers
  • Containment Outage Equipment Storage Containers Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)
(1) The inspectors evaluated Radiation Worker Performance and Radiation Protection Technician Proficiency

Radiological Hazard Assessment (IP Section 02.01) (1 Sample)

The inspectors evaluated Radiological Hazards Assessments and Controls. and reviewed the following Radiological Surveys:

  • 2RC8003 Valve Work
  • Unit 2 Containment Reactor Cavity
  • Unit 2 Containment Reactor Head Disassembly Risk significant radiological work activities
  • Unit 2 Containment Reactor Head Disassembly
  • Unit 2 Containment Reactor Cavity Decontamination
  • 2RC8003 Valve Repair Air sample survey records
  • U2 426 Inside Reactor Head; 04/11/19 18:20
  • U2 Reactor Cavity Samples; 04/09/19 through 04/11/19 Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) Radiological work package for areas with airborne radioactivity or potential airborne radioactivity:
  • RWP BY-2-19-00623; Reactor Cavity Decontamination; Revision 0
  • RWP BY-2-19-00613; Reactor head Disassembly/Reassembly; Revision

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) 10/1/2018 - 3/31/2019

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2019, the inspectors presented the Inservice Inspection to Mr. M. Kanavos, Site Vice President and other members of the licensee staff.
  • On May 10, 2019, the inspectors presented the radiation protection inspection results to Mr. M. Kanavos; Site Vice President, and other members of the licensee staff.
  • On July 11, 2019, the inspectors presented the integrated inspection results to Mr. M. Kanavos, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Miscellaneous Letter 2019-0056 Certification of 2019 Summer Readiness 06/15/2019

71111.01 Procedures EN-AA-402-0005 Extreme Heat Implementation 1

71111.01 Procedures EN-BY-402-0005 Extreme Weather Heat Implementation Program 6

71111.01 Procedures OP-AA-108-107- Interface Procedure Between COMED/PECO and Exelon 12

1002 Transmission Ops

71111.04 Drawings M-37 Diagram of Auxiliary Feedwater 08/06/1998

71111.04 Drawings M-39, Sheet 1 Diagram of Condensate (make-up and overflow) 05/23/1996

71111.04 Drawings M-54 Diagram of Service Air 02/19/1998

71111.04 Procedures 2BOL 4.12 LCOAR Low Temperature Overpressure Protection (LTOP) 4

System Tech Spec LCO # 3.4-12

71111.04 Procedures BOP RH-6 Operation of the RH System in Shutdown Cooling 50

71111.04S Drawings M-63 Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1C 01/20/1998

71111.04S Drawings M-63 Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1B 01/20/1998

71111.04S Drawings M-63 Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1A 12/26/1997

71111.05A Miscellaneous Fire Drill Scenario 2B Diesel Generator Room 12/09/2018

19-06

71111.05Q Drawings FP-9 Fire Barrier Location Plan, Elevation 383-0 07/07/2009

71111.05Q Fire Plans Pre-Fire Plan FZ 11.4-0 North, Auxiliary Buidling General Area North 383 3

  1. 132 Elevation

71111.05Q Fire Plans Pre-Fire Plan #14 FZ 3.1-1, Unit 1, Auxiliary Building, Cable Tunnel - 414 2

Elevation

71111.05Q Fire Plans Pre-Fire Plan #15 FZ 3.1-1, Unit 1, Auxiliary Building, Cable Riser Room - 426 2

Elevation

71111.05Q Fire Plans Pre-Fire Plan Fire Zone 18.3-2, Misc. Area 377 Elevation, Unit 2, Main 4

  1. 198 Steam and Auxiliary Feedwater Pipe Tunnel

71111.05Q Fire Plans Pre-Fire Plan #48 Fire Zone 5.4-2, Auxiliary Building 451-0 Elevation Division 2

Miscellaneous Electrical Equipment and Battery Room

71111.05Q Fire Plans Pre-Fire Plan #96 FZ11.1A-0, Auxiliary Building Unit 1 Essential Service Water 2

Pump Room - 330-0 Elevation

71111.07A Corrective Action AR 04249766 1SI01SB HX Failed GL 89-13 Acceptance Criteria 05/17/2019

Documents

71111.08P Calculations BYR98-004 Evaluation of Containment Liner Plate Defects 0

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.08P Corrective Action 02704898 2SX035 Leak 08/16/2016

Documents

71111.08P Corrective Action 04059979 Active Body to Bonnet Leak on 2SI8905D 10/06/2017

Documents

71111.08P Corrective Action 04062059 B2R20 M4 Moisture Barrier/Liner Plate Exams 10/12/2017

Documents

71111.08P Corrective Action 04062252 NDE - Linear Indication Observed During Exam 10/12/2017

Documents

71111.08P Corrective Action 04062274 B2R20 M4 NDE - Linear Indication Observed During Exam 10/12/2017

Documents

71111.08P Corrective Action 04090712 RCS Leak Rate Action Level 2 01/05/2018

Documents

71111.08P Corrective Action 04097807 Corrosion on 2A DG Jacket Water Cooler Channel Head 01/27/2018

Documents

71111.08P Corrective Action 04121830 SX Leak on Jacket Water Cooling During SX Flush 04/01/2018

Documents

71111.08P Corrective Action 04230553 Potential Inactive Leak on 2SX03B Line 03/18/2019

Documents

71111.08P Corrective Action 04237811 Work Performed Wrong WPS 04/09/2019

Documents

71111.08P Corrective Action 04238994 Indications Observed During ISI Exam of 2RC-01-BA/SGN-02 04/12/2019

Documents

71111.08P Corrective Action 04239968 NRC Review of Work Order 01952003-01 04/16/2019

Documents

Resulting from

Inspection

71111.08P Engineering EC 621535 B2R20 Engineering Evaluation for Containment Liner Metal 0

Changes Reduction Exceeding 10% of Nominal Thickness

71111.08P Miscellaneous NDIT BYR-99-226; Acceptance Criteria for Containment Liner 10/27/1999

Reduced Thickness

71111.08P Miscellaneous WPS 8-8-GT-2 1

71111.08P Miscellaneous PQR AT8.8 A-6 03/16/1987

71111.08P Miscellaneous ASME Weld Record - WO 01952003-01- Weld 1 10/10/2017

71111.08P Miscellaneous ASME Weld Record - WO 01952003-01- Weld 2 10/10/2017

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.08P Miscellaneous 04059979 Boric Acid Leakage Evaluation, Component 2SI8905D 10/06/2017

71111.08P Miscellaneous 04186791 Boric Acid Leakage Evaluation, Component 2CS009B 10/25/2018

71111.08P Miscellaneous PDQS No. 878 Performance Demonstration Qualification Sheet for Procedure 09/21/2017

PDI-UT-1, Rev. G

71111.08P NDE Reports Liquid Penetrant Examination Report 2017-PT-067- Weld 1 10/10/2017

71111.08P NDE Reports Liquid Penetrant Examination Report 2017-141- Weld 2 09/21/2017

71111.08P NDE Reports VT-2 Visual Examination NDE Report, 2CV8350, 2CV8351 10/19/2017

71111.08P NDE Reports UT Thickness Examination Report 2017-UT-076 10/07/2017

71111.08P NDE Reports B2R21-UT-009 UT Examination Report for Component ID 2FW03DA-16/C15 04/13/2019

71111.08P NDE Reports B2R21-UT-013 UT Examination Report for Component 04/13/2019

ID 2FW03DA-16/C22

71111.08P NDE Reports BWR21-MT-001 MT Examination Report for Component 04/15/2019

ID 2RC-01-BA/SGN-02

71111.08P Procedures ER-AA-335-003 Magnetic Particle (MT) Examination 8

71111.08P Procedures ER-AA-335-030 Ultrasonic Examination of Ferritic Piping Welds 5

71111.08P Procedures ER-AP-331 Boric Acid Corrosion Control (BACC) Program 10

71111.08P Procedures ER-AP-331-1002 Boric Acid Corrosion Control Program Identification, Screening 11

and Evaluation

71111.08P Procedures ER-AP-335-001 Bare Metal Visual Examination for Nickel Alloy Materials 6

71111.08P Procedures EXE-PDI-UT-1 Ultrasonic Examination of Ferritic Piping Welds in Accordance 8

with PDI-UT-1

71111.08P Procedures EXE-PDI-UT-2 Ultrasonic Examination of Austenitic Piping Welds in 8

Accordance with PDI-UT-2

71111.08P Procedures PDI-UT-1 Generic Procedure for the Ultrasonic Examination of Ferritic G

Pipe Welds

71111.08P Procedures PDI-UT-2 Generic Procedure for the Ultrasonic Examination of H

Austenitic Pipe Welds

71111.08P Work Orders 01915005-02 CM OP3-2FW01AB - Support ECT/100% Hydrolaze for 10/13/2017

27B FW HTR

71111.08P Work Orders 01946250-01 LR-MM-2DG01KA-X1-MM Support for GL 89-13 Inspection 02/03/2018

71111.08P Work Orders 04695708-01 MM - Repair Active Body to Bonnet Leak on 10/12/2017

2SI8905D - OPCC

71111.12 Calculations BY-MRULE-001 Maintenance Rule - Safety Significance 3

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.12 Corrective Action AR 04246084 SA-01 Monitoring Goals Exceeded 05/03/2019

Documents

71111.12 Miscellaneous Maintenance Rule System Basis Document for DC System 05/21/2019

71111.12 Miscellaneous AR 04152515 a(1) Action Plan for DC-02 08/27/18

71111.12 Procedures ER-AA-310 Implementation of the Maintenance Rule 11

71111.13 Calculations BY-MODE-025 TS 3.0.4.b Evaluation - Mode Change with Technical 3

Specification Equipment Out-of-Service

71111.13 Procedures OP-AA-108-117 Protected Equipment Program 5

71111.13 Procedures OP-BY-117-1000 Byron Protected Equipment Program 11

71111.15 Calculations BYR96-126 Diesel Oil Storage Tank (DOST) Level Setpoints 8

71111.15 Calculations DGDO9301 Time Dependent Loading and Fuel Consumption for EDGs 7

Following LOOP/LOCA

71111.15 Calculations EC 393417 Aux Feed Connections in Main Steam Valve Rooms Unit 1, 001

FLEX Mod 5

71111.15 Calculations EC 406504 Installation of Vent Valves on Flex Lines 1FX001BC-4 and 0

1FX001AD-4 at 401 Elevation in MSIV Rooms

71111.15 Calculations EC 627794 Past Operability Review of Thru-Wall Flax on 2SXL1AA-4 000

71111.15 Calculations EC 627794 Past Operability Review of Thru-Wall Flaw on 2SXL1AA-4 000

71111.15 Calculations N002957 Formal Pipe Stress Analysis Essential Service Water System 001A

Piping 2SX85

71111.15 Calculations N002960 Formal Pipe Stress Analysis Essential Service Water System 000A

Piping 2SX84

71111.15 Corrective Action AR 03986832 Does Flex System Affect Our Ability to Mitigate an Accident? 03/19/2017

Documents

71111.15 Corrective Action AR 04217533 Calculation Error in DGDO9301 02/05/2019

Documents

71111.15 Corrective Action AR 04228881 1MS018D (SG PORV) TACH Loss Light Not Lit 03/13/2019

Documents

71111.15 Corrective Action AR 04230533 CC-AA-309-1001 Design Analysis Cover Sheet 9

Documents

71111.15 Corrective Action AR 04236827 1D MS PORV Did Not Reposition During Troubleshooting 04/05/2019

Documents

71111.15 Corrective Action AR 04238226 2MS018D Open STT Outside of Admin Limit 04/10/2019

Documents

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.15 Corrective Action AR 04239471 UT Readings Below 87.5% Tmin On 2AF01AB Inlet/Outlet 04/14/2019

Documents Piping

71111.15 Corrective Action AR 04239885 2RH8701A did not Initially Open from MCB C/S 04/16/2019

Documents

71111.15 Corrective Action AR 04246920 EOC for Unplanned 1st BOL Entry on 2MS018D 05/07/2019

Documents

71111.15 Corrective Action AR04235744 1AF049D Check Valve Leakage Too High 04/02/2019

Documents

71111.15 Drawings M-132 Diagram of Auxiliary Feedwater Flex 03/27/2014

71111.15 Drawings M-37 Diagram of Auxiliary Feedwater 08/06/1998

71111.15 Procedures 1BOSR FX-S1 Unit 1 Auxiliary Feedwater Flex Connection Low Point Drain 2

Semiannual Inspection

71111.15 Procedures 1ST-BYR-BDOC- Byron - Inservice Testing Bases Document 09/09/2016

V-02

71111.15 Work Orders WO 04899280 Potential Inactive Leak on 2SX03B Line 03/19/2019

71111.15 Work Orders WO 04899280-01 Potential Inactive Leak on 2SX03B Line 03/19/2019

71111.19 Corrective Action AR 04228530 2A DG Tripped During the Cooldown Cycle 03/11/2019

Documents

71111.19 Corrective Action AR 04231438 Unexpected Alarm 03/21/2019

Documents

71111.19 Corrective Action AR 04238276 2CV8100 Did not Stroke Open Following Restoration 04/10/2019

Documents

71111.19 Drawings 6E-2-4030 CV12 Reactor Coolant Pump Seal Water Return Isolation Valves G

2CV8100 and 2CV8112

71111.19 Procedures 1BOSR 7.5.4-2 Diesel Driven Auxiliary Feedwater Pump Monthly Surveillance 25

71111.19 Procedures 2BOSR 8.1.2-1 2A Diesel Generator Operability Surveillance 37

71111.19 Procedures SPP 18-001 Modification Testing, Commissioning and Power Ascension 0

Procedure for ABB Unitrol 6000 Automatic Voltage Regulator

(AVR) Replacement

71111.19 Work Orders 04910438-01 Indicating Lights in Need of Repair 04/15/2019

71111.19 Work Orders 04915356-01 (NEIL) - 1B AF Pump Surv 05/21/2019

71111.19 Work Orders WO 1963090 Verify 2A SX Pump Not Rotating Backwards 04/15/2019

71111.19 Work Orders WO 1963090-11 2A SX Pump Discharge Check Valve 04/15/2019

71111.19 Work Orders WO 4714181-01 OPS Auto Rod Drop Time 2BOSR 1.4.3-1A 04/22/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.19 Work Orders WO 4885552 Comprehensive IST test for Essential Service Water 04/02/2019

71111.20 Corrective Action AR 04238313 2RH618 Did Not Pass Full Flow 04/10/2019

Documents

71111.20 Corrective Action AR 04238618 Battery 211 Charger Failure Alarm 04/11/2018

Documents

71111.20 Corrective Action AR 04239170 2RY083A Not Isolating 04/13/2019

Documents

71111.20 Corrective Action AR 04239292 2CV8389B Will Not Close 04/13/2019

Documents

71111.20 Corrective Action AR 04242250 U2 SU FW Pump High Bearing Temperature 04/22/2019

Documents

71111.20 Corrective Action AR 04243213 2BOA SEC-7 Entered for Elevated AF Piping 04/25/2019

Documents

71111.20 Miscellaneous Unit 2 Containment Closeout Plan 01/30/2019

71111.20 Miscellaneous B2R21 Critical Path and Major Milestones 04/15/2019

71111.20 Miscellaneous B2R21 Shutdown Safety Process Overview 03/19/2019

71111.20 Miscellaneous Byron Unit 2 Cycle 22 Core Reload and Operation 22

71111.20 Miscellaneous BY2C21-B2R21- Ramp Offline to B2R21 0

0.0

71111.20 Miscellaneous BY2C21-MSSV- BY2C21 EOL MSSV and AF Flow Testing 0

0.0

71111.20 Miscellaneous BY2C21-TH-11.0 Generic Thumbrules and Coastdown Operations 0

71111.20 Procedures 2BGP 100-1 Plant Heat-Up 62

71111.20 Procedures 2BGP 100-2 Plant Start-Up 50

71111.20 Procedures 2BGP 100-2A1 Reactor Start-Up 34

71111.20 Procedures ER-AA-600-1043 Shutdown Risk Mangement 6

71111.20 Procedures MA-AA-716-008- Reactor Services Refuel Floor FME Plan 15

1008

71111.22 Procedures 0BOSR Comprehensive Inservice Testing (IST) Requirements For 14

5.5.8.SX.5-2C Essential Service Water Makeup Pump 0B

71111.22 Procedures 1BOSR 8.1.8-1 DG 1A Crosstie to Bus 241 SAT 242-1 and Crosstie to BUS 16

141 18-Month Surveillance

71111.22 Procedures 2BOSR Comprehensive Inservice Testing (IST) Requirements for the 9

5.5.8.AF.5-1c Motor Driven Auxiliary Feedwater Pump 2AF01PA

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.22 Procedures 2BOSR 6.1.1-10 Primary Containment Type C Local Leakage Rate Test and 12

IST Tests of Reactor Building Drains and Vents System

71111.22 Work Orders WO 4698419 SEB Perform BOPGRP Outage Surveillance TREVI-Test 04/03/2019

71111.22 Work Orders WO 4698793 OPS 2BOSR 8.1.11-1, 2A Diesel Generator Sequencer Test 04/16/2019

71124.01 Corrective Action AR 04237665 Level 2 PCE from U-2 Reactor Cavity Work 04/09/19

Documents

71124.01 Corrective Action AR 04237954 Trend Identified with Discrete Radioactive Particles 04/09/19

Documents

71124.01 Miscellaneous Semi Annual Radioactive Source Inventory and Leak Test 12/03/18

71124.01 Miscellaneous AR 04175336 Electronic Dosimeter Dose Alarm 09/20/18

71124.01 Miscellaneous AR 04193067 Electronic Dosimeter Dose Rate Alarm 11/08/18

71124.01 Miscellaneous AR 04233626 Electronic Dosimeter Dose and Dose Rate Alarms 03/27/19

71124.01 Miscellaneous NPF-37 National Source Tracking System Annual Reconciliation 01/10/19

71124.01 Procedures NISP-RP-005 Access Controls for High Radiation Areas 1

71124.01 Procedures NISP-RP-007 Control of Radioactive Material 1

71124.01 Radiation 2019-041172 Radiation Survey Reactor Head 04/11/19

Surveys

71124.01 Radiation 2019-041244 2RC8003 Valve 04/12/19

Surveys

71124.01 Radiation Work BY-2-19-00613 Reactor Head Disassembly and Reassembly 0

Permits (RWPs)

71124.01 Radiation Work BY-2-19-00670 2RC8003C Valve Work 1

Permits (RWPs)

71124.01 Radiation Work BY-2-19-00670 CRDM Inspection 0

Permits (RWPs)

71151 Miscellaneous NRC Occupational Exposure Control Effectiveness Data 10/1/2018 -

Packages 3/31/2019

71152 Corrective Action AR 04162710 SX Piping Leaks and Trend IR 08/08/2018

Documents

71152 Corrective Action AR 04225196 Chemistry Response to MIC in Stagnant Portions of SX Piping 03/01/2019

Documents

71152 Corrective Action AR 04233520 Vendor Observation on MSSV MSA at Vendor Facility 03/27/2019

Documents

71152 Corrective Action AR 04236032 U2 Natural Draft Cooling Tower Damage Assessment 04/03/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

71152 Corrective Action AR 04239203 2RY8010A PSV Failed as Found Lift Test 04/13/2019

Documents

71152 Corrective Action AR 04254305 4.0 Critique of Transformer Fire 6/2/19 06/04/2019

Documents

18