Material Control and Accounting Program Inspection Report 05000454/2019412 and 05000455/2019412
ML20003E324
Person / Time
Site: Byron  
Issue date: 01/03/2020
From: Hironori Peterson
Region 3 Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019412
Download: ML20003E324 (6)


Text

January 3, 2020

SUBJECT:

BYRON STATION - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000454/2019412 AND 05000455/2019412

Dear Mr. Hanson:

On November 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Mr. K. McGuire and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects

Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2019412 and 05000455/2019412

Enterprise Identifier: I-2019-412-0019

Licensee:

Exelon Generation Company, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

November 12, 2019 to November 18, 2019

Inspectors:

C. Hunt, Resident Inspector

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a material control and accounting program inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.11 - Material Control and Accounting (MC&A)

Inspectors evaluated the licensee's material control and accounting program through completion of the following inspection procedure elements:

Material Control and Accounting (MC&A) (15 Samples)

(1) Special Nuclear Material Records (3 Samples)
(2) Material Control and Accounting Programs and Procedures (2 Samples)
(3) Physical Inventory of Special Nuclear Material (8 Samples)
(4) Special Nuclear Material Reports (1 Sample)
(5) Problem Identification and Resolution (1 Sample)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 18, 2019, the inspectors presented the material control and accounting program inspection results to Mr. K. McGuire and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.11

Corrective Action

Documents

AR 02715798

Moveable Incore Detector SNM Segregation

09/14/2016

AR 04267943

Insert ID Did Not Patch Loading Plan

07/30/2019

Miscellaneous

Moveable Incore Detector Drive 1E and 1F Repair

09/26/2018

Thimble Plug 161D Reseating

01/24/2017

Byron Station 2018 Physical Inventory or Special Nuclear

Material (SNM)

07/25/2018

Byron Station 2017Physical Inventory or Special Nuclear

Material (SNM)

07/20/2017

Byron Station 2016 Physical Inventory or Special Nuclear

Material (SNM)

07/28/2016

2017 MID - Irradiated Specimen Movement

04/04/2017

Byron Station 2019 Physical Inventory or Special Nuclear

Material (SNM)

07/25/2019

Procedures

NF-AA-30

Special Nuclear Material Control Process Description

NF-AA-300

Special Nuclear Material Control and Accountability

NF-AA-330

Special Nuclear Material Physical Inventories

NF-AP-309

PWR Special Nuclear Material And Core Component Move

Sheet Development

NF-AP-330-5201

Special Nuclear Material Inventory Requirements For Byron

and Braidwood

OP-AA-390

Spent Fuel Pool Material Control

Self-Assessments AR 04197984

The Special Nuclear Material Control and Accounting Self-

Assessment

08/07/2019