Constellation June 8, 2023 L TR:

BYRON 2023-0033 FILE:

1D.101 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 1 Facility Operating License No. NPF-37 NRC Docket No. STN50-454 Constellation Energy Generation, LLC (CEG)

Byron Station 4450 N. German Church Road Byron, IL 61010-9794 www.constellationenergy.com

SUBJECT:

Byron Station Unit 1 90-Day lnservice Inspection Report for Interval 4, Period 3, (B1 R25)

The subject 90-Day lnservice Inspection Report for the Byron Station Unit 1, Refueling Outage Twenty-Five (B1 R25) is being submitted pursuant to the requirements of Article IWA-6000, "Records and Reports" of Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 2007 Edition / 2008 Addenda.

This letter provides a copy of Form OAR-1 Owner's Activity Report for inservice inspection activities performed during the previous fuel cycle. This report meets the requirements of the ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission." The report covers the inservice inspections conducted prior to and during the Unit 1 Spring 2023 refueling outage.

If there are any questions regarding this matter, please contact Ms. Zoe Cox, Regulatory Assurance Manager, at (815) 406-2800.

Respectfully, jl-oLJY?-

Harris Welt Site Vice President Byron Generating Station HW/JB/JA/hh Enclosure

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number B1R25 Plant --=B.,__y,.,ro'-'-n'-'G~e,.,n..,_,e=r=at""in_,.,g._S~t,.,,a=ti""on""._4'""'4""5=0..,,N"'"'o=rt,_h,_G=er"'m"'a=n'-C"'"'""hu=r-=c'""h~R=o=a-=d.,,_. =By,.r-=o __ n"-'. l=L~6'""'1.,;0_.1=0 _____________ _

Unit No._~ __ Commercial Service Date __

S=e=p=t=e __ m=b~e.... r-'1-=6,._. --'"1=98=5 _________ _

Refueling Outage No.

B 1 R25 (ifappHcable) current Inspection Interval ______

__,F'--'o""u=rt""'h~ln=s-"'p-=-e=ct=io=n,...l'-'-n=te=rv~al~(~I S=-l~l,c...T""'h~i""'rd~l.... n=s.c.p=ec=t=io=n'-I.... n=te=rv-'-=al~(-=C~o=n=ta=i~nm==e'-'-n"'-t ~'S=I,._) __ _

, 1st, 2nd 3rd 4th other)

Current Inspection Period --------'T'""h"'ir

... d-"'l __

n=sp.._e=c"-'t=io""n""'P"""'e""r=io~d,_(~IS='-I a""n"'"d'-=C=o...

nt=a=in~m--=en~t~l-=S.... ll~------------

(1s1 2nd Jrd)

Edition and Addenda of Section XI applicable to the inspection plans ASME Section XI 2007 Edition through the 2008 Addenda Date and revision of inspection plans BYR-525537-01-RP04. Rev 0. 7/29/2016: BYR-525537-01-RP04. Rev 1. 1/4/2017: BYR-525537-01-RP04. Rev 2. 8/10/2018; ER-BY-330-1001. Rev 0. 10/30/2020 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and evaluation: N-432-1, N-508-4. N-513-3. N-513-4. N-513-5, N-516-4. N-516-5. N-526. N-532-5. N-552-1, N-561-2, N-561-3, N-562-2. N-569-1. N-578-1, N-586-1. N-593-2. N-597-2. N-597-3, N-600. N-613-2. N-629. N-638-7, N-638-10, N-639, N-641, N-643-2 N-648-1. N-648-2. N-651. N-653-1. N-653-2. N-660, N-661-2, N-661-3, N-666-1. N-695-1. N-696-

1. N-705, N-705-1. N-706-1, N-711-1, N-722-1. N-729-6. N-731, N-733, N-735, N-747. N-749. N-751, N-754-1, N-762, N-762-1, N-765, N-766-1. N-766-3, N-768. N-770-5. N-771. N-773. N-775, N-776, N-778. N-786-1. N-786-3, N-789, N-789-2, N-789-3, N-798.

N-800, N-803. N-805. N-809, N-823, N-823-1, N-824. N-825, N-829. N-830, N-831, N-831-1. N-838, N-839. N-843. N-845. N-845-1, N-847, N-848-1, N-851, N-853, N-854. N-858. N-864, N-865. N-867, N-869, N-874, N-877. N-878. N-879. N-880. N-882, N-885, N-889. N-890, N-892 (1fappl1cable including cases modified by Case-N 532 and lalerrev,~ieMl CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASM E Code, Section XI: and ( c) the repair/replacement activities and evaluations supporting the completion of B 1 R25 conform to the requirements of Section XI.

(refuelir,g outage number)

Signed

.Joseph 611chanan 1 ~ ~

Ow,.e,orO~e Tide ISi Program Owner Date _ __..5~{2~4..,.{2~0,.,,23,.._ ___ _

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date __

2~~--~,r'J_if..,..Y_Z_'3 __ _

1

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number SX PUMP 1A SUPPORT, IR#04561294 - 81R25 ISi -

F-A / F1.40 Relevant Condition on 1SX01PA 1SX-01-PA/S Support SUPPORT RIGID SEISMIC IR#04561174 - 81 R25 ISi -

F-A/F1.10 RESTRAINT FOR LINE Relevant Condition Identified on 1 SI05DA-61N, 1 SI0SOA-6/1 SI01019X 1SIO1019X Strut CC HX 0A SUPPORT, IR#04560132-Relevant F-A/ F1.40 Condition - VT-3 Exam of U0 CC 0CC-01-A/S HX Suooort TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number Replace (5) 1 D RCP lower seal housing 1

10 RCP LOWER SEAL bolts due to 3/19/2023 05257311-01 HOUSING BOLTS recordable indications identified durina VT-1 exam Repair SX inlet pipe WELD BETWEEN U-0 0SX02D-30" through-3 CC HX CHANNEL TO wall weld leak to U0 3/31/2023 05346990-01 0SX02D-30" INLET PIPE HX by performing weld 2

ATTACHMENT 1 81R25 CONTAINMENT ISi (IWE/IWL) RESULTS 81R25 CONTAINMENT ISi IWE ACTIVITIES During the B 1 R25 outage, examinations were completed for the Unit 1 containment liner to comply with the requirements of IWE-2400. Examinations were completed and documented under WO#05213387.

As a result, the provisions of 10CFR50.55a(b)(2)(ix)(A) for metal containment examinations has been reviewed for applicability to the B 1 R25 examinations performed, and no conditions were identified in accessible areas that would indicate the presence of or could result in degradation to inaccessible areas.

UNIT 1 CYCLE 25 CONTAINMENT ISi IWL ACTIVITIES During the 25th fuel cycle on Unit 1, the fifth, 5-year IWL examination for Class CC concrete surfaces was completed on the Unit 1 and Unit 2 containments to comply with the requirements of IWL-2400.

For Unit 1, the required examinations were completed and documented under WO#04328907.

As a result, the provisions of 1 0CFR50.55a(b)(2)(viii)(E) for concrete containment examinations has been reviewed for applicability to the Cycle 25 concrete examinations performed, and no conditions were identified in accessible areas that could indicate the presence of or result in degradation to inaccessible areas.

3