Integrated Inspection Report 05000454/2019002 and 05000455/2019002
ML19210E115
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/26/2019
From: Hironori Peterson
Division Reactor Projects III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019002
Download: ML19210E115 (20)


Text

July 26, 2019

SUBJECT:

BYRON STATIONINTEGRATED INSPECTION REPORT 05000454/2019002 AND 05000455/2019002

Dear Mr. Hanson:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Byron Station. On July 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. M. Kanavos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects

Docket Nos.: 05000454 and 05000455 License Nos.: NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2019002 and 05000455/2019002

Enterprise Identifier: I-2019-002-0066

Licensee:

Exelon Generation Company, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

April 01, 2019 to June 30, 2019

Inspectors:

S. Bell, Health Physicist

D. Betancourt-Roldan, Senior Resident Inspector

M. Holmberg, Senior Reactor Inspector

C. Hunt, Resident Inspector

C. Norton, Senior Resident Inspector

J. Park, Reactor Inspector

C. Thompson, Illinois Energy Management Agency

D. Turpin, NRC Observer

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

Unit 2 began the inspection period at approximately 90 percent and was in coast down for a planned refueling outage. The refueling outage started April 8, 2019, and the unit went critical on April 23, 2019. The unit was returned to full power on April 27, 2019, and remained at or near full power for the majority of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems on June 29, 2019

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding of River Screen House on May 23, 2019

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

  • Low Temperature Overpressure (LTOP) System on April 9, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The Inspectors Evaluated System Configurations During a Complete Walkdown of the Unit 1 Fuel Pool Cooling System on April 18, 2019

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02) (1 Sample)

(1) The Inspectors evaluated fire brigade performance on May 14, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (7 Samples)

The inspectors Evaluated Fire Protection Program Implementation in the following selected areas:

(1) Fire Zone (FZ) 19.3-2, Unit 2 Miscellaneous Area Main Steam & Auxiliary Feedwater Pipe Tunnel, 377 Elevation on April 4, 2019
(2) FZ 16.1-2, Unit 2 Refueling Water Storage Tank Area on April 11, 2019
(3) FZ 5.4-2, Unit 2 Auxiliary Building Division 22, Miscellaneous Electrical Equipment &

Battery Room - 451 Elevation on April 17, 2019

(4) FZ 11.4-0, North Auxiliary Building General Area North 383 Elevation on May 1, 2019
(5) FZ 10.2-2, 2A Diesel Oil Storage Tank on May 21, 2019
(6) FZ 11.1 A-0, Unit 1 Essential Service Water Pump Room - 330-0 Elevation on June 21, 2019
(7) FZ 3.1-1, Unit 1 Auxiliary Building Cable Riser Room - 426 and 414 Elevation on June 25, 2019

71111.07A - Heat Sink Performance

Annual Review (IP Section 02.01) (1 Sample)

(1) The inspectors evaluated readiness and performance of:

Action Request (AR) 04249766; 1SI01SB Heat Exchanger Failed Generic Letter 89-13 Acceptance Criteria on May 17, 2019

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The Inspectors Verified that the Reactor Coolant System Boundary, Reactor Vessel Internals, Steam Generator Tubes, Risk-Significant Piping System Boundaries, and Containment Boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 8, 2019 to April 18, 2019:

03.01.a - Nondestructive Examination and Welding Activities

  • Ultrasonic (UT) Examination of Feedwater System Elbow-to-Pipe Weld 2FW03DA-16/C15
  • UT Examination of Chemical and Volume Control System Pipe-to-Elbow Weld 2CVA1A-6/C08
  • UT Examination of Chemical and Volume Control System Pipe-to-Elbow Weld 2CVA1A-6/C09
  • Containment Liner UT examination at Area D2 - reduced wall thickness at Locations 1 and 3 (2017-UT-076)

03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities

  • Bare metal visual (VE) examination of reactor vessel head nozzles 1, 13, 58 and vent

03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated Licensed Operator Performance in the Control Room during Coast-Down activities on April 4, 2019 and April 7, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated Operator Requalification Training on June 18, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with Equipment and/or Safety Significant Functions:

(1) Service Air (SA-1) on April 29, 2019
(2) Direct Current Power Storage and Distribution (DC-02) on June 25, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the risk assessments for the following Planned and Emergent Work activities:

(1) Unit 1 Yellow Risk due to BUS 241 Outage and 2A Essential Service Water (SX) Pump Work on April 14, 2019
(2) Unit 2 Yellow Risk due to 2A SX Pump Work Window on May 1, 2019
(3) Mode Change with Technical Specification Equipment Out-of-Service (2019BY-MODE-025) on May 13, 2019
(4) AR 4246027: 1SX114A Failed to Stroke Within the Administrative Limit on May 28, 2019 (5)1B DG Work Window on June 17, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (6 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) AR 04217533, Calculation Error in DGD09301, 02/05/2019 on April 3, 2019
(2) AR 04235744, 1AF049D Check Valve Leakage Too High on April 9, 2019
(3) AR 04230553, 2SX265A Through Wall Leak on April 11, 2019
(4) AR 04238226, 2MS018D Open Outside of Administrative Limit on April 14, 2019
(5) AR 04239885, 2RH8701A did not Open from Main Control Board on April 14, 2019
(6) AR 04239471, Ultrasonic Testing Readings Below 87.5% on 2AF01AB Inlet/Outlet Piping on April 17, 2019

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post maintenance tests:

(1)2A EDG Monthly Run Following Troubleshooting and Repairs on April 2, 2019 (2)2A SX Pump Run Following Maintenance on April 16, 2019 (3)2CV8100 Valve Stroking Following Controller Switch Replacement on April 16, 2019

(4) Rod Drop Testing on April 23, 2019
(5) Low Power Physics Testing on April 23, 2019
(6) Automatic Voltage Regulator (AVR) Test at Full Turbine Speed Prior to Generator Synchronization on April 24, 2019 (7)1B Auxiliary Feedwater Pump Run Following Work Window on May 21, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Outage B2R21 activities from April 7, 2019 to April 27, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) 2BOSR 6.1.1-10, Primary Containment Type C Local Leakage Rate Test and Inservice Test (IST) of Reactor Building Drains and Vents System on April 11, 2019

Inservice Testing (IP Section 03.01) (2 Samples)

(1)2BOSR 5.5.8.AF.5-1C, IST Requirements for the Motor Driven Auxiliary Feedwater pump 2AF01PA on April 4, 2019 (2)0BOSR 5.5.8.SX.5-2C, IST Requirements For Essential Service Water Makeup Pump 0B on April 25, 2019

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Work Order 4698419, Main Steam Safety Valves Operability Test on April 3, 2019 (2)2BOSR 3.8.11.1, 2A DG Load Sequencing Test on April 17, 2019 (3)1BOSR 8.1.8-1, 1A DG Crosstie to BUS 241 and Crosstie to BUS 141 18-month Surveillance on May 1,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Contamination and Radioactive Material Control (IP Section 02.03) (1 Sample)

(1) The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:
(1) The inspectors evaluated Risk-Significant High Radiation Area and Very High Radiation Area Controls

Instructions to Workers (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated Instructions to Workers Including Radiation Work Permits used to access High Radiation Areas

Radiation work packages

  • Radiation Work Permit (RWP) BY-2-19-00670; 2RC8003C Valve Work; Revision 1
  • RWP BY-2-19-00613; Reactor Head Disassembly/Reassembly; Revision 0

Electronic alarming dosimeter alarms

  • Dose Alarm 09/20/18 1CV8389A Valve Work
  • Dose and Dose Rate Alarms 03/27/19 U2 Containment Entry
  • Dose Rate Alarm 11/8/18 Ladder Inspection

Labeling of containers

  • Fuel Handling Building Storage Containers
  • Sealand Transportation Containers
  • Containment Outage Equipment Storage Containers

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)

(1) The inspectors evaluated Radiation Worker Performance and Radiation Protection Technician Proficiency

Radiological Hazard Assessment (IP Section 02.01) (1 Sample)

The inspectors evaluated Radiological Hazards Assessments and Controls. and reviewed the following Radiological Surveys:

  • 2RC8003 Valve Work
  • Unit 2 Containment Reactor Cavity
  • Unit 2 Containment Reactor Head Disassembly

Risk significant radiological work activities

  • Unit 2 Containment Reactor Head Disassembly
  • Unit 2 Containment Reactor Cavity Decontamination
  • U2 426 Inside Reactor Head; 04/11/19 18:20
  • U2 Reactor Cavity Samples; 04/09/19 through 04/11/19

Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) Radiological work package for areas with airborne radioactivity or potential airborne radioactivity:
  • RWP BY-2-19-00623; Reactor Cavity Decontamination; Revision 0
  • RWP BY-2-19-00613; Reactor head Disassembly/Reassembly; Revision

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (April 1, 2018 - March 31, 2019)
(2) Unit 2 (April 1, 2018 - March 31, 2019)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) 10/1/2018 - 3/31/2019

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2019, the inspectors presented the Inservice Inspection to Mr. M. Kanavos, Site Vice President and other members of the licensee staff.
  • On May 10, 2019, the inspectors presented the radiation protection inspection results to Mr. M. Kanavos; Site Vice President, and other members of the licensee staff.
  • On July 11, 2019, the inspectors presented the integrated inspection results to Mr. M. Kanavos, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Miscellaneous

Letter 2019-0056

Certification of 2019 Summer Readiness

06/15/2019

71111.01

Procedures

EN-AA-402-0005

Extreme Heat Implementation

71111.01

Procedures

EN-BY-402-0005

Extreme Weather Heat Implementation Program

71111.01

Procedures

OP-AA-108-107-

1002

Interface Procedure Between COMED/PECO and Exelon

Transmission Ops

71111.04

Drawings

M-37

Diagram of Auxiliary Feedwater

08/06/1998

71111.04

Drawings

M-39, Sheet 1

Diagram of Condensate (make-up and overflow)

05/23/1996

71111.04

Drawings

M-54

Diagram of Service Air

2/19/1998

71111.04

Procedures

2BOL 4.12

LCOAR Low Temperature Overpressure Protection (LTOP)

System Tech Spec LCO # 3.4-12

71111.04

Procedures

BOP RH-6

Operation of the RH System in Shutdown Cooling

71111.04S

Drawings

M-63

Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1C

01/20/1998

71111.04S

Drawings

M-63

Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1B

01/20/1998

71111.04S

Drawings

M-63

Diagram of Fuel Pool Cooling and Clean-Up, Sheet 1A

2/26/1997

71111.05A

Miscellaneous

Fire Drill Scenario

19-06

2B Diesel Generator Room

2/09/2018

71111.05Q Drawings

FP-9

Fire Barrier Location Plan, Elevation 383-0

07/07/2009

71111.05Q Fire Plans

Pre-Fire Plan

  1. 132

FZ 11.4-0 North, Auxiliary Buidling General Area North 383

Elevation

71111.05Q Fire Plans

Pre-Fire Plan #14

FZ 3.1-1, Unit 1, Auxiliary Building, Cable Tunnel - 414

Elevation

71111.05Q Fire Plans

Pre-Fire Plan #15

FZ 3.1-1, Unit 1, Auxiliary Building, Cable Riser Room - 426

Elevation

71111.05Q Fire Plans

Pre-Fire Plan

  1. 198

Fire Zone 18.3-2, Misc. Area 377 Elevation, Unit 2, Main

Steam and Auxiliary Feedwater Pipe Tunnel

71111.05Q Fire Plans

Pre-Fire Plan #48

Fire Zone 5.4-2, Auxiliary Building 451-0 Elevation Division

Miscellaneous Electrical Equipment and Battery Room

71111.05Q Fire Plans

Pre-Fire Plan #96

FZ11.1A-0, Auxiliary Building Unit 1 Essential Service Water

Pump Room - 330-0 Elevation

71111.07A

Corrective Action

Documents

AR 04249766

1SI01SB HX Failed GL 89-13 Acceptance Criteria

05/17/2019

71111.08P

Calculations

BYR98-004

Evaluation of Containment Liner Plate Defects

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Corrective Action

Documents

2704898

2SX035 Leak

08/16/2016

71111.08P

Corrective Action

Documents

04059979

Active Body to Bonnet Leak on 2SI8905D

10/06/2017

71111.08P

Corrective Action

Documents

04062059

B2R20 M4 Moisture Barrier/Liner Plate Exams

10/12/2017

71111.08P

Corrective Action

Documents

04062252

NDE - Linear Indication Observed During Exam

10/12/2017

71111.08P

Corrective Action

Documents

04062274

B2R20 M4 NDE - Linear Indication Observed During Exam

10/12/2017

71111.08P

Corrective Action

Documents

04090712

RCS Leak Rate Action Level 2

01/05/2018

71111.08P

Corrective Action

Documents

04097807

Corrosion on 2A DG Jacket Water Cooler Channel Head

01/27/2018

71111.08P

Corrective Action

Documents

04121830

SX Leak on Jacket Water Cooling During SX Flush

04/01/2018

71111.08P

Corrective Action

Documents

230553

Potential Inactive Leak on 2SX03B Line

03/18/2019

71111.08P

Corrective Action

Documents

237811

Work Performed Wrong WPS

04/09/2019

71111.08P

Corrective Action

Documents

238994

Indications Observed During ISI Exam of 2RC-01-BA/SGN-02

04/12/2019

71111.08P

Corrective Action

Documents

Resulting from

Inspection

239968

NRC Review of Work Order 01952003-01

04/16/2019

71111.08P

Engineering

Changes

EC 621535

B2R20 Engineering Evaluation for Containment Liner Metal

Reduction Exceeding 10% of Nominal Thickness

71111.08P

Miscellaneous

NDIT BYR-99-226; Acceptance Criteria for Containment Liner

Reduced Thickness

10/27/1999

71111.08P

Miscellaneous

WPS 8-8-GT-2

71111.08P

Miscellaneous

PQR AT8.8 A-6

03/16/1987

71111.08P

Miscellaneous

ASME Weld Record - WO 01952003-01-Weld 1

10/10/2017

71111.08P

Miscellaneous

ASME Weld Record - WO 01952003-01-Weld 2

10/10/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Miscellaneous

04059979

Boric Acid Leakage Evaluation, Component 2SI8905D

10/06/2017

71111.08P

Miscellaneous

04186791

Boric Acid Leakage Evaluation, Component 2CS009B

10/25/2018

71111.08P

Miscellaneous

PDQS No. 878

Performance Demonstration Qualification Sheet for Procedure

PDI-UT-1, Rev. G

09/21/2017

71111.08P

NDE Reports

Liquid Penetrant Examination Report 2017-PT-067-Weld 1

10/10/2017

71111.08P

NDE Reports

Liquid Penetrant Examination Report 2017-141-Weld 2

09/21/2017

71111.08P

NDE Reports

VT-2 Visual Examination NDE Report, 2CV8350, 2CV8351

10/19/2017

71111.08P

NDE Reports

UT Thickness Examination Report 2017-UT-076

10/07/2017

71111.08P

NDE Reports

B2R21-UT-009

UT Examination Report for Component ID 2FW03DA-16/C15

04/13/2019

71111.08P

NDE Reports

B2R21-UT-013

UT Examination Report for Component

ID 2FW03DA-16/C22

04/13/2019

71111.08P

NDE Reports

BWR21-MT-001

MT Examination Report for Component

ID 2RC-01-BA/SGN-02

04/15/2019

71111.08P

Procedures

ER-AA-335-003

Magnetic Particle (MT) Examination

71111.08P

Procedures

ER-AA-335-030

Ultrasonic Examination of Ferritic Piping Welds

71111.08P

Procedures

ER-AP-331

Boric Acid Corrosion Control (BACC) Program

71111.08P

Procedures

ER-AP-331-1002

Boric Acid Corrosion Control Program Identification, Screening

and Evaluation

71111.08P

Procedures

ER-AP-335-001

Bare Metal Visual Examination for Nickel Alloy Materials

71111.08P

Procedures

EXE-PDI-UT-1

Ultrasonic Examination of Ferritic Piping Welds in Accordance

with PDI-UT-1

71111.08P

Procedures

EXE-PDI-UT-2

Ultrasonic Examination of Austenitic Piping Welds in

Accordance with PDI-UT-2

71111.08P

Procedures

PDI-UT-1

Generic Procedure for the Ultrasonic Examination of Ferritic

Pipe Welds

G

71111.08P

Procedures

PDI-UT-2

Generic Procedure for the Ultrasonic Examination of

Austenitic Pipe Welds

H

71111.08P

Work Orders

01915005-02

CM OP3-2FW01AB - Support ECT/100% Hydrolaze for

27B FW HTR

10/13/2017

71111.08P

Work Orders

01946250-01

LR-MM-2DG01KA-X1-MM Support for GL 89-13 Inspection

2/03/2018

71111.08P

Work Orders

04695708-01

MM - Repair Active Body to Bonnet Leak on

2SI8905D - OPCC

10/12/2017

71111.12

Calculations

BY-MRULE-001

Maintenance Rule - Safety Significance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Corrective Action

Documents

AR 04246084

SA-01 Monitoring Goals Exceeded

05/03/2019

71111.12

Miscellaneous

Maintenance Rule System Basis Document for DC System

05/21/2019

71111.12

Miscellaneous

AR 04152515

a(1) Action Plan for DC-02

08/27/18

71111.12

Procedures

ER-AA-310

Implementation of the Maintenance Rule

71111.13

Calculations

BY-MODE-025

TS 3.0.4.b Evaluation - Mode Change with Technical

Specification Equipment Out-of-Service

71111.13

Procedures

OP-AA-108-117

Protected Equipment Program

71111.13

Procedures

OP-BY-117-1000

Byron Protected Equipment Program

71111.15

Calculations

BYR96-126

Diesel Oil Storage Tank (DOST) Level Setpoints

71111.15

Calculations

DGDO9301

Time Dependent Loading and Fuel Consumption for EDGs

Following LOOP/LOCA

71111.15

Calculations

EC 393417

Aux Feed Connections in Main Steam Valve Rooms Unit 1,

FLEX Mod 5

001

71111.15

Calculations

EC 406504

Installation of Vent Valves on Flex Lines 1FX001BC-4 and

1FX001AD-4 at 401 Elevation in MSIV Rooms

71111.15

Calculations

EC 627794

Past Operability Review of Thru-Wall Flax on 2SXL1AA-4

000

71111.15

Calculations

EC 627794

Past Operability Review of Thru-Wall Flaw on 2SXL1AA-4

000

71111.15

Calculations

N002957

Formal Pipe Stress Analysis Essential Service Water System

Piping 2SX85

001A

71111.15

Calculations

N002960

Formal Pipe Stress Analysis Essential Service Water System

Piping 2SX84

000A

71111.15

Corrective Action

Documents

AR 03986832

Does Flex System Affect Our Ability to Mitigate an Accident?

03/19/2017

71111.15

Corrective Action

Documents

AR 04217533

Calculation Error in DGDO9301

2/05/2019

71111.15

Corrective Action

Documents

AR 04228881

1MS018D (SG PORV) TACH Loss Light Not Lit

03/13/2019

71111.15

Corrective Action

Documents

AR 04230533

CC-AA-309-1001 Design Analysis Cover Sheet

71111.15

Corrective Action

Documents

AR 04236827

1D MS PORV Did Not Reposition During Troubleshooting

04/05/2019

71111.15

Corrective Action

Documents

AR 04238226

2MS018D Open STT Outside of Admin Limit

04/10/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Corrective Action

Documents

AR 04239471

UT Readings Below 87.5% Tmin On 2AF01AB Inlet/Outlet

Piping

04/14/2019

71111.15

Corrective Action

Documents

AR 04239885

2RH8701A did not Initially Open from MCB C/S

04/16/2019

71111.15

Corrective Action

Documents

AR 04246920

EOC for Unplanned 1st BOL Entry on 2MS018D

05/07/2019

71111.15

Corrective Action

Documents

AR04235744

1AF049D Check Valve Leakage Too High

04/02/2019

71111.15

Drawings

M-132

Diagram of Auxiliary Feedwater Flex

03/27/2014

71111.15

Drawings

M-37

Diagram of Auxiliary Feedwater

08/06/1998

71111.15

Procedures

1BOSR FX-S1

Unit 1 Auxiliary Feedwater Flex Connection Low Point Drain

Semiannual Inspection

71111.15

Procedures

1ST-BYR-BDOC-

V-02

Byron - Inservice Testing Bases Document

09/09/2016

71111.15

Work Orders

WO 04899280

Potential Inactive Leak on 2SX03B Line

03/19/2019

71111.15

Work Orders

WO 04899280-01

Potential Inactive Leak on 2SX03B Line

03/19/2019

71111.19

Corrective Action

Documents

AR 04228530

2A DG Tripped During the Cooldown Cycle

03/11/2019

71111.19

Corrective Action

Documents

AR 04231438

Unexpected Alarm

03/21/2019

71111.19

Corrective Action

Documents

AR 04238276

2CV8100 Did not Stroke Open Following Restoration

04/10/2019

71111.19

Drawings

6E-2-4030 CV12

Reactor Coolant Pump Seal Water Return Isolation Valves

2CV8100 and 2CV8112

G

71111.19

Procedures

1BOSR 7.5.4-2

Diesel Driven Auxiliary Feedwater Pump Monthly Surveillance

71111.19

Procedures

2BOSR 8.1.2-1

2A Diesel Generator Operability Surveillance

71111.19

Procedures

SPP 18-001

Modification Testing, Commissioning and Power Ascension

Procedure for ABB Unitrol 6000 Automatic Voltage Regulator

(AVR) Replacement

71111.19

Work Orders

04910438-01

Indicating Lights in Need of Repair

04/15/2019

71111.19

Work Orders

04915356-01

(NEIL) - 1B AF Pump Surv

05/21/2019

71111.19

Work Orders

WO 1963090

Verify 2A SX Pump Not Rotating Backwards

04/15/2019

71111.19

Work Orders

WO 1963090-11

2A SX Pump Discharge Check Valve

04/15/2019

71111.19

Work Orders

WO 4714181-01

OPS Auto Rod Drop Time 2BOSR 1.4.3-1A

04/22/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Work Orders

WO 4885552

Comprehensive IST test for Essential Service Water

04/02/2019

71111.20

Corrective Action

Documents

AR 04238313

2RH618 Did Not Pass Full Flow

04/10/2019

71111.20

Corrective Action

Documents

AR 04238618

Battery 211 Charger Failure Alarm

04/11/2018

71111.20

Corrective Action

Documents

AR 04239170

2RY083A Not Isolating

04/13/2019

71111.20

Corrective Action

Documents

AR 04239292

2CV8389B Will Not Close

04/13/2019

71111.20

Corrective Action

Documents

AR 04242250

U2 SU FW Pump High Bearing Temperature

04/22/2019

71111.20

Corrective Action

Documents

AR 04243213

2BOA SEC-7 Entered for Elevated AF Piping

04/25/2019

71111.20

Miscellaneous

Unit 2 Containment Closeout Plan

01/30/2019

71111.20

Miscellaneous

B2R21 Critical Path and Major Milestones

04/15/2019

71111.20

Miscellaneous

B2R21 Shutdown Safety Process Overview

03/19/2019

71111.20

Miscellaneous

Byron Unit 2 Cycle 22 Core Reload and Operation

71111.20

Miscellaneous

BY2C21-B2R21-

0.0

Ramp Offline to B2R21

71111.20

Miscellaneous

BY2C21-MSSV-

0.0

BY2C21 EOL MSSV and AF Flow Testing

71111.20

Miscellaneous

BY2C21-TH-11.0

Generic Thumbrules and Coastdown Operations

71111.20

Procedures

2BGP 100-1

Plant Heat-Up

71111.20

Procedures

2BGP 100-2

Plant Start-Up

71111.20

Procedures

2BGP 100-2A1

Reactor Start-Up

71111.20

Procedures

ER-AA-600-1043

Shutdown Risk Mangement

71111.20

Procedures

MA-AA-716-008-

1008

Reactor Services Refuel Floor FME Plan

71111.22

Procedures

0BOSR

5.5.8.SX.5-2C

Comprehensive Inservice Testing (IST) Requirements For

Essential Service Water Makeup Pump 0B

71111.22

Procedures

1BOSR 8.1.8-1

DG 1A Crosstie to Bus 241 SAT 242-1 and Crosstie to BUS

141 18-Month Surveillance

71111.22

Procedures

2BOSR

5.5.8.AF.5-1c

Comprehensive Inservice Testing (IST) Requirements for the

Motor Driven Auxiliary Feedwater Pump 2AF01PA

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Procedures

2BOSR 6.1.1-10

Primary Containment Type C Local Leakage Rate Test and

IST Tests of Reactor Building Drains and Vents System

71111.22

Work Orders

WO 4698419

SEB Perform BOPGRP Outage Surveillance TREVI-Test

04/03/2019

71111.22

Work Orders

WO 4698793

OPS 2BOSR 8.1.11-1, 2A Diesel Generator Sequencer Test

04/16/2019

71124.01

Corrective Action

Documents

AR 04237665

Level 2 PCE from U-2 Reactor Cavity Work

04/09/19

71124.01

Corrective Action

Documents

AR 04237954

Trend Identified with Discrete Radioactive Particles

04/09/19

71124.01

Miscellaneous

Semi Annual Radioactive Source Inventory and Leak Test

2/03/18

71124.01

Miscellaneous

AR 04175336

Electronic Dosimeter Dose Alarm

09/20/18

71124.01

Miscellaneous

AR 04193067

Electronic Dosimeter Dose Rate Alarm

11/08/18

71124.01

Miscellaneous

AR 04233626

Electronic Dosimeter Dose and Dose Rate Alarms

03/27/19

71124.01

Miscellaneous

NPF-37

National Source Tracking System Annual Reconciliation

01/10/19

71124.01

Procedures

NISP-RP-005

Access Controls for High Radiation Areas

71124.01

Procedures

NISP-RP-007

Control of Radioactive Material

71124.01

Radiation

Surveys

2019-041172

Radiation Survey Reactor Head

04/11/19

71124.01

Radiation

Surveys

2019-041244

2RC8003 Valve

04/12/19

71124.01

Radiation Work

Permits (RWPs)

BY-2-19-00613

Reactor Head Disassembly and Reassembly

71124.01

Radiation Work

Permits (RWPs)

BY-2-19-00670

2RC8003C Valve Work

71124.01

Radiation Work

Permits (RWPs)

BY-2-19-00670

CRDM Inspection

71151

Miscellaneous

NRC Occupational Exposure Control Effectiveness Data

Packages

10/1/2018 -

3/31/2019

71152

Corrective Action

Documents

AR 04162710

SX Piping Leaks and Trend IR

08/08/2018

71152

Corrective Action

Documents

AR 04225196

Chemistry Response to MIC in Stagnant Portions of SX Piping

03/01/2019

71152

Corrective Action

Documents

AR 04233520

Vendor Observation on MSSV MSA at Vendor Facility

03/27/2019

71152

Corrective Action

AR 04236032

U2 Natural Draft Cooling Tower Damage Assessment

04/03/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152

Corrective Action

Documents

AR 04239203

2RY8010A PSV Failed as Found Lift Test

04/13/2019

71152

Corrective Action

Documents

AR 04254305

4.0 Critique of Transformer Fire 6/2/19

06/04/2019