IR 05000454/2019501
| ML19324C550 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 11/20/2019 |
| From: | Robert Orlikowski Operations Branch III |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2019501 | |
| Download: ML19324C550 (8) | |
Text
November 20, 2019
SUBJECT:
BYRON GENERATING STATION - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2019501 AND 05000455/2019501
Dear Mr. Hanson:
On October 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Generating Station and discussed the results of this inspection with Mr. M. Kanavos, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000454 and 05000455
License Numbers:
Report Numbers:
05000454/2019501 and 05000455/2019501
Enterprise Identifier: I-2019-501-0020
Licensee:
Exelon Generation Company, LLC
Facility:
Byron Generating Station
Location:
Byron, IL
Inspection Dates:
October 28, 2019 to October 31, 2019
Inspectors:
L. Cender, Health Physicist
M. Garza, Emergency Preparedness Inspector
G. Hansen, Sr. Emergency Preparedness Inspector
D. Smith, Senior Emergency Response Coordinator
Approved By:
Robert J. Orlikowski, Chief
Operations Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Byron Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise on October 29, 2019. The exercise scenario simulated an event at the Byron Station that initiated with the declaration and notification of an Alert in response to an explosion affecting the operability of plant safety systems required to establish or maintain safe shutdown. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on September 26,
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification EP01: Drill/Exercise Performance (IP Section 02.12)
(1)07/01/2018 - 06/30/2019
EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)
- (1) 07/01/2018 - 06/30/2019
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
- (1) 07/01/2018 - 06/30/2019
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 31, 2019, the inspectors presented the emergency preparedness biennial exercise inspection results to Mr. M. Kanavos, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Two-Year List of Drill and Exercise Condition Reports
10/2017 -
10/2019
Byron TSC/OSC Focused Area Drill Missed DEP Opportunity 01/31/2018
Byron TSC/OSC Focused Area Drills Results
2/21/2018
Byron 2018 SIM/TSC/OSC Drill Series - Improvement Areas
04/30/2018
EP DEP Data Counted on Non-Designated LORT Scenario
06/04/2018
2018 Byron EP Off-Year Exercise - Exercise Management
and Control
06/06/2018
2018 Byron EP Off-Year Exercise - Fleet Assessment
Observations
06/06/2018
Byron 2018 EP OSC-TSC Drill - Improvement Areas
09/21/2018
Byron EP Drill Series - CR-SIM Performance
04/18/2019
Byron EP Drill Series - TSC Performance
04/18/2019
Byron EP Drill Series - OSC Performance
04/18/2019
Byron EP Drill Series - Scenario Management
04/18/2019
Byron 2019 EP Exercise - Scenario Control Issues
06/17/2019
Byron Station Focused Area EP Drill 07/17/19 Lessons
Learned
08/08/2019
Byron 2019 EP Pre-Exercise Results
09/25/2019
Miscellaneous
Two Years of Drill and Exercise Evaluation Results
10/2017 -
10/2019
PowerPoint Presentation; Byron Biennial Exercise - Exercise
Evaluation Results
10/29/2019
Byron 2017 NRC Graded Exercise Evaluation Report
07/26/2017
Byron 2019 Emergency Preparedness Biennial Exercise
Scenario
08/28/2019
Procedures
Exelon Nuclear Standardized Radiological Emergency Plan
Revision 30
Exelon Nuclear Radiological Emergency Plan Annex for
Byron Station
Revision 35
Addendum 3
Exelon Nuclear Emergency Action Levels for Byron Station
Revision 2
Dose Assessment
Revision 12
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Core Damage Assessment
Revision 8
Emergency Classification and Protective Action
Recommendations
Revision 22
TSC Activation and Operation
Revision 12
OSC Activation and Operation
Revision 13
EOF Activation and Operation
Revision 14
JIC Activation and Operation
Revision 14
Personnel Protective Actions
Revision 13
EP-AA-113-F-07
Midwest Emergency Director - Site Assembly, Accountability
and Evacuation
Revision G
Notifications
Revision 15
Midwest Region Off Site Notifications
Revision 18
Corrective Action
Documents
Resulting from
Inspection
Byron 2019 Pre-Exercise - NRC Observations
09/27/2019
Miscellaneous
Byron Station 2019 Emergency Preparedness Biennial
Exercise Scenario
08/28/2019
71151
Miscellaneous
NRC PI Data Sheets; NRC Indicator Alert Notification System
(ANS) Reliability
07/01/2018 -
06/30/2019
NRC PI Data Sheets; Emergency Response Organization
(ERO) Readiness
07/01/2018 -
06/30/2019
NRC PI Data Sheets; NRC Indicator Drill and Exercise
Performance (DEP)
07/01/2018 -
06/30/2019
NEI 99 02
Regulatory Assessment Performance Indicator Guideline
Revision 7