The following pages link to PNO-I-86-060, on 860806,vital Bus Normal Supply Breaker 6A Tripped Due to Indicated Bus Fault.Caused by Emergency Diesel Generator Supply Breaker Shorting Phase to Phase.Bus Repaired:
Displayed 46 items.
- PNO-I-85-043, on 850623,10 Indications of Unacceptable Size of Steam Generator Shell Transition Girth Weld Per ASME Section XI Found Through Ultrasonic Exam.Caused by pre-existing Flaws Present After 1983 Repairs (← links)
- ML20151Y108 (← links)
- ML20151X998 (← links)
- ML20151X653 (← links)
- ML20151X624 (← links)
- PNO-I-88-003, on 880101,steam Generator (SG) 23 Boiled Dry During Plant Heatup.Cause Not Stated.On 880104,station Mgt Started Evaluating Safety Significance of Event & Best Method to Refill Generator.Sg 23 Refilled on 880105 (← links)
- PNO-I-88-065, on 880617,unit Tripped Due to High Water Level in Steam Generator 22.Caused by Contractor Cleaner Inadvertently Activating Boiler Feed Pump.Licensee Elected to Enter Cold Shutdown to Repair Connoseals (← links)
- PNO-I-86-049, on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk (← links)
- ML20197G901 (← links)
- PNO-I-87-025, on 870326,licensee Announced Plans to Shut Down Reactor on 870327 Due to Steadily Increasing Leakage on Reactor Coolant Pump Seal.Caused by Degraded Seal.Shutdown Expected to Last 10 Days (← links)
- ML20205A793 (redirect page) (← links)
- PNO-I-86-060 (redirect page) (← links)
- PNO-I-80-135, on 800924,both Containment Spray Pumps Discovered in pull-to-lock Position After Tagging by Operators Per Containment Entry Procedure.Switches Returned to Automatic Position & Change to Procedure Initiated (← links)
- PNO-I-86-051, on 860718,plant Operator Contaminated While Assisting in Repair of Gasket Leak in Steam Environ.Caused by Removal of Required Wet Gear & Respirator When Operator Passed Out from Heat Prostration.Operator Hospitalized (← links)
- ML20207R179 (← links)
- ML20249B948 (← links)
- ML20249B377 (← links)
- ML20249B330 (← links)
- ML20249B246 (← links)
- ML20249B202 (← links)
- ML20249A911 (← links)
- ML20249A887 (← links)
- ML20248L258 (← links)
- ML20245G218 (← links)
- ML20236V105 (← links)
- ML20236U922 (← links)
- ML20236U856 (← links)
- ML20236U234 (← links)
- ML20236U017 (← links)
- ML20236T992 (← links)
- ML20236T982 (← links)
- ML20236J871 (← links)
- ML20236F799 (← links)
- ML20236F251 (← links)
- ML20236E818 (← links)
- ML20217B194 (← links)
- ML20217B032 (← links)
- ML20216J733 (← links)
- PNO-I-86-084, on 861020,reactor Tripped.Caused by Failure of Safety Injection Logic Relay Which Demands Reactor Trip Upon Safety Injection Actuation.Difficulties Encountered W/Two of Three Auxiliary Feedwater Pumps (← links)
- PNO-II-86-078, on 861021,2 Gallons of Hydrazine Spilled in Turbine Bldg.Caused by Leak in Deionized Water Mixing Valve Overflowing Mix Tank.Spill Cleaned Up (← links)
- PNO-I-87-039, on 870430,licensee Identified Potential Circuit Failure Preventing Automatic Start of Auxiliary Feedwater Pumps by Loss of Main Feedwater or lo-lo Steam Generator Signals.Circuit Modified for Independent Relays (← links)
- PNO-I-86-049A, on 860706,forced Outage Entered When 18-inch Piece of Blade Foil from Low Pressure Turbine 1 Broke Off During Startup.Cause Unidentified.Options to Repair &/Or Replace Available Rotors Being Evaluated (← links)
- PNO-I-87-010, on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown (← links)
- PNO-I-90-077, on 900906,unplanned Shutdown Greater than 48 H Occurred Due to RCS Packing Leak from Pressurizer Spray Valve.Plant Placed in Hot & Cold Shutdown.Licensee Activities Monitored & State of Ny Informed (← links)
- PNO-I-90-065, on 900814,licensee Reported That Licensed Reactor Operator Tested Positive for Marijuana as Result of Random Fitness for Duty Test.Operator Unescorted Site Access Suspended for 14 Days (← links)
- PNO-I-90-063, on 900809,plant Shutdown Due to Potential Loss of Three Emergency Diesel Generators.Caused by Blown Control Power Fuse.Fuse Replaced (← links)