ML20236U856
ML20236U856 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 09/26/1975 |
From: | Jennifer Davis, Dreher F, Thornburg H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | |
References | |
PN-75-098, PN-75-98, NUDOCS 9807310117 | |
Download: ML20236U856 (1) | |
Similar Documents at Indian Point | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997
[Table view]PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR PNO-I-90-094, on 901016,transfer of Fuel Assemblies Stuck in Upper Core Internals.No Apparent Damage to Dropped Fuel Assembly Occurred.Recovery Operations Secured1990-10-17017 October 1990 PNO-I-90-094:on 901016,transfer of Fuel Assemblies Stuck in Upper Core Internals.No Apparent Damage to Dropped Fuel Assembly Occurred.Recovery Operations Secured PNO-I-90-077, on 900906,unplanned Shutdown Greater than 48 H Occurred Due to RCS Packing Leak from Pressurizer Spray Valve.Plant Placed in Hot & Cold Shutdown.Licensee Activities Monitored & State of Ny Informed1990-09-0707 September 1990 PNO-I-90-077:on 900906,unplanned Shutdown Greater than 48 H Occurred Due to RCS Packing Leak from Pressurizer Spray Valve.Plant Placed in Hot & Cold Shutdown.Licensee Activities Monitored & State of Ny Informed PNO-I-90-065, on 900814,licensee Reported That Licensed Reactor Operator Tested Positive for Marijuana as Result of Random Fitness for Duty Test.Operator Unescorted Site Access Suspended for 14 Days1990-08-15015 August 1990 PNO-I-90-065:on 900814,licensee Reported That Licensed Reactor Operator Tested Positive for Marijuana as Result of Random Fitness for Duty Test.Operator Unescorted Site Access Suspended for 14 Days PNO-I-90-063, on 900809,plant Shutdown Due to Potential Loss of Three Emergency Diesel Generators.Caused by Blown Control Power Fuse.Fuse Replaced1990-08-0909 August 1990 PNO-I-90-063:on 900809,plant Shutdown Due to Potential Loss of Three Emergency Diesel Generators.Caused by Blown Control Power Fuse.Fuse Replaced ML20245G2181989-06-21021 June 1989 PNS-I-89-010:on 890621,Dept of Investigation in New York City Received Call Threatening Destruction of Plant & Ref 1977 Incident Where Damage Inflicted on Plant.Bomb Threat Contingency Procedures Implemented & Security Maintained PNO-I-88-065, on 880617,unit Tripped Due to High Water Level in Steam Generator 22.Caused by Contractor Cleaner Inadvertently Activating Boiler Feed Pump.Licensee Elected to Enter Cold Shutdown to Repair Connoseals1988-06-20020 June 1988 PNO-I-88-065:on 880617,unit Tripped Due to High Water Level in Steam Generator 22.Caused by Contractor Cleaner Inadvertently Activating Boiler Feed Pump.Licensee Elected to Enter Cold Shutdown to Repair Connoseals PNO-I-88-003, on 880101,steam Generator (SG) 23 Boiled Dry During Plant Heatup.Cause Not Stated.On 880104,station Mgt Started Evaluating Safety Significance of Event & Best Method to Refill Generator.Sg 23 Refilled on 8801051988-01-0707 January 1988 PNO-I-88-003:on 880101,steam Generator (SG) 23 Boiled Dry During Plant Heatup.Cause Not Stated.On 880104,station Mgt Started Evaluating Safety Significance of Event & Best Method to Refill Generator.Sg 23 Refilled on 880105 PNO-I-87-039, on 870430,licensee Identified Potential Circuit Failure Preventing Automatic Start of Auxiliary Feedwater Pumps by Loss of Main Feedwater or lo-lo Steam Generator Signals.Circuit Modified for Independent Relays1987-05-0101 May 1987 PNO-I-87-039:on 870430,licensee Identified Potential Circuit Failure Preventing Automatic Start of Auxiliary Feedwater Pumps by Loss of Main Feedwater or lo-lo Steam Generator Signals.Circuit Modified for Independent Relays PNO-I-87-025, on 870326,licensee Announced Plans to Shut Down Reactor on 870327 Due to Steadily Increasing Leakage on Reactor Coolant Pump Seal.Caused by Degraded Seal.Shutdown Expected to Last 10 Days1987-03-26026 March 1987 PNO-I-87-025:on 870326,licensee Announced Plans to Shut Down Reactor on 870327 Due to Steadily Increasing Leakage on Reactor Coolant Pump Seal.Caused by Degraded Seal.Shutdown Expected to Last 10 Days ML20207R1791987-03-0606 March 1987 PNS-I-87-003:on 870306,security Officer at Offsite Training Ctr in Toddville,Ny Received Bomb Threat by Telephone.Search of Site Produced Negative Results.Local Law Enforcement Agencies Responded.Security Measures Heightened PNO-I-87-010, on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown1987-02-12012 February 1987 PNO-I-87-010:on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown PNO-II-86-078, on 861021,2 Gallons of Hydrazine Spilled in Turbine Bldg.Caused by Leak in Deionized Water Mixing Valve Overflowing Mix Tank.Spill Cleaned Up1986-10-22022 October 1986 PNO-II-86-078:on 861021,2 Gallons of Hydrazine Spilled in Turbine Bldg.Caused by Leak in Deionized Water Mixing Valve Overflowing Mix Tank.Spill Cleaned Up PNO-I-86-084, on 861020,reactor Tripped.Caused by Failure of Safety Injection Logic Relay Which Demands Reactor Trip Upon Safety Injection Actuation.Difficulties Encountered W/Two of Three Auxiliary Feedwater Pumps1986-10-21021 October 1986 PNO-I-86-084:on 861020,reactor Tripped.Caused by Failure of Safety Injection Logic Relay Which Demands Reactor Trip Upon Safety Injection Actuation.Difficulties Encountered W/Two of Three Auxiliary Feedwater Pumps PNO-I-86-060, on 860806,vital Bus Normal Supply Breaker 6A Tripped Due to Indicated Bus Fault.Caused by Emergency Diesel Generator Supply Breaker Shorting Phase to Phase.Bus Repaired1986-08-0606 August 1986 PNO-I-86-060:on 860806,vital Bus Normal Supply Breaker 6A Tripped Due to Indicated Bus Fault.Caused by Emergency Diesel Generator Supply Breaker Shorting Phase to Phase.Bus Repaired PNO-I-86-049A, on 860706,forced Outage Entered When 18-inch Piece of Blade Foil from Low Pressure Turbine 1 Broke Off During Startup.Cause Unidentified.Options to Repair &/Or Replace Available Rotors Being Evaluated1986-07-23023 July 1986 PNO-I-86-049A:on 860706,forced Outage Entered When 18-inch Piece of Blade Foil from Low Pressure Turbine 1 Broke Off During Startup.Cause Unidentified.Options to Repair &/Or Replace Available Rotors Being Evaluated PNO-I-86-051, on 860718,plant Operator Contaminated While Assisting in Repair of Gasket Leak in Steam Environ.Caused by Removal of Required Wet Gear & Respirator When Operator Passed Out from Heat Prostration.Operator Hospitalized1986-07-18018 July 1986 PNO-I-86-051:on 860718,plant Operator Contaminated While Assisting in Repair of Gasket Leak in Steam Environ.Caused by Removal of Required Wet Gear & Respirator When Operator Passed Out from Heat Prostration.Operator Hospitalized PNO-I-86-049, on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk1986-07-0707 July 1986 PNO-I-86-049:on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%1985-09-27027 September 1985 PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% PNO-I-85-043, on 850623,10 Indications of Unacceptable Size of Steam Generator Shell Transition Girth Weld Per ASME Section XI Found Through Ultrasonic Exam.Caused by pre-existing Flaws Present After 1983 Repairs1985-06-26026 June 1985 PNO-I-85-043:on 850623,10 Indications of Unacceptable Size of Steam Generator Shell Transition Girth Weld Per ASME Section XI Found Through Ultrasonic Exam.Caused by pre-existing Flaws Present After 1983 Repairs ML20197G9011984-06-14014 June 1984 PNS-I-84-011A:on 840613,licensee Provided Update on Status of Investigation Re Falsified Records of Employment Ltrs. Licensee Will Request Unions to Conduct Background Investigations Per ANSI 18.17 PNO-I-80-135, on 800924,both Containment Spray Pumps Discovered in pull-to-lock Position After Tagging by Operators Per Containment Entry Procedure.Switches Returned to Automatic Position & Change to Procedure Initiated1980-09-26026 September 1980 PNO-I-80-135:on 800924,both Containment Spray Pumps Discovered in pull-to-lock Position After Tagging by Operators Per Containment Entry Procedure.Switches Returned to Automatic Position & Change to Procedure Initiated ML20217B0321978-12-0707 December 1978 PNO-78-025:on 781207,licensee Commenced Plant Shutdown to Effect Repairs to One of Four Sgs.Primary to Secondary Sys Leak of 0.10 Gpm Indicated on 781206.No Release of Radioactivity to Environ Occurred ML20216J7331978-11-24024 November 1978 PNO-78-195:on 781124,small Leak Developed in Socket Weld on Drain Line from Seal Injection Headers to Reactor Pump.Leak Did Not Result in Any Radioactivity Release to Environ.State of Ny Informed ML20217B1941978-08-30030 August 1978 PNO-78-157:on 780829,leak Was Detected Upon Completion of Repairs to Manifold in Hydrogen Gas Storage Area & Small Explosion Occurred While Workers Tried to Stop Leak.State of New York & OSHA Informed.Region I Notified on 780830 ML20236E8181978-04-13013 April 1978 PNO-78-081:on 780413,Region I Informed by Licensee That Maint Workers March Film Badge Result Indicated Exposure of 3.11 Rem That Would Give Individual Quarterly Exposure of 4.47 Rem.State of New York Informed ML20248L2581978-03-23023 March 1978 PNO-78-060:on 780321,three Offsite Licensee Maint Workers Were Reassigned to Plant to Work in Radiation Areas.Refusal of Assignment Resulted in Discharge for One Worker.Worker Was Interviewed by Radio & Television on 780321 ML20249A8871977-11-22022 November 1977 PNS-77-047:on 771122,Westchester Business Ofc of Consolidated Edison Co,New York Received Telephone Call Re Bomb Threat from an Unidentified Male.Emergency Procedures in Effect.State of Ny Informed ML20249A9111977-08-0404 August 1977 PNS-77-030:on 770803,call Was Received Stating That Two Facilities Would Be Bombed.Bomb Threat Procedures Were Implemented.Site Was Searched & Threat Was Declared Over. Licensee Maintained Alert Status Through 770804 ML20151Y1081977-07-15015 July 1977 PNO-77-126B:on 770714,electrical Output Added to Distribution Sys at Indian Point Unit 3.Reactor Power Level Increased Throughout Night as Customers Incrementally Added to Sys.Nrc Inspector Witnessing Operation Repts ML20151X9981977-07-14014 July 1977 PNO-77-126A:Inspectors on Site Determined That IPS Unit 3 Safety Sys Functioned Properly Following Reactor Trip & During Nearly 6 Hour Loss of Offsite Power.Licensee Held Press Conference on 770714.Reactor to Be Brought Critical ML20151X6241977-07-14014 July 1977 PNO-77-126:on 770713,unit 3 Reactor Tripped from 91% Power Due to Lightning Strike & Resulting Fire at Buchanan,Ny Substation Located 1/2 Mile from Indian Point Site. Caused by Power Blackout ML20151X6531977-07-0505 July 1977 PNO-77-120:on 770702,unit Shutdown Due to RCP Seal Failure. Approx 40,000 Gallons of RCS Water Was Leaked Over Period of 8 H Into Containment Via Failed Seal While Unit Being Placed in Cold Shutdown Condition ML20236J8711976-09-27027 September 1976 PNS-76-055:on 760925,an Automobile Was Driven Through Double,Closed,Locked & Manned Main Vehicle Gate at Owner Controlled Perimeter,Resulting in Damage to Both Gates. Plant Guards Apprehended Driver ML20249B9481976-09-22022 September 1976 PNO-76-162:while Shutdown for Scheduled Maint Outage,Minor Leak Was Observed in Vicinity of factory-made Weld on Outlet Nozzle of Boron Injection Tank.Insp & Radiographs Confirmed That Weld Joining Pipe safe-end to Tank Was Defective ML20249B3301976-04-30030 April 1976 PNO-76-081:while Reactor Shutdown,Between Five & Ten Gallons of Nonradioactive Borated Water Inadvertently Sprayed Inside Containment.Caused by Operator Error Due to Improper Valve Lineup ML20249B3771976-04-0707 April 1976 PNO-76-066:on 760406,initial Criticality Achieved.Region I Inspectors at Site Reported That Actual Boron Concentration Was in Close Agreement W/Predicted Values.State of New York Informed & Press Release Planned by Licensee ML20249B2021976-03-17017 March 1976 PNO-79-043:on 760317,nonisolable Leak in RCS Was Identified During Post Core Load Hot Functional Testing.Rcs Being Cooled Down to Make Repairs.Cause of Leak Has Not Yet Been Determined ML20236F7991976-03-0101 March 1976 PNS-76-005A:on 760229, Citizens for Protection of Environ Held Planned Demonstration at Entrance to Licensee Facility. Counter Demonstration by United Utility Workers of America, Local 3 Also Held at Same Time.No Physical Clash Occurred ML20236F2511976-02-24024 February 1976 PNS-76-005:on 760224,licensee Advised That Citizens for Protection of Environ Petitioned Buchanan,New York Police Dept for Permit to Demonstrate at Entrance to Facility on 760229.Permit Granted ML20249B2461976-01-23023 January 1976 PNO-76-012:on 760121 & 22,fish Mortality on Intake Screens of CWS Was 12,799 & 18,233 Respectively.One of Five Operating Circulating Water Pumps Was Shutdown to Reduce Mortality.State of Ny Informed ML20236U9221975-11-0505 November 1975 PN-75-118:on 751101-03,fish Mortality on Intake Screens of Circulating Water Sys Exceeded Environ TS Action Level of 5000 Per Day on Three Consecutive Days.Two Circulating Water Pumps Were Shutdown on 751103 & One Was Shut Down on 751104 ML20236V1051975-10-20020 October 1975 PN-75-110:on 751016,unplanned Shutdown Instituted,Due to Electrical Fault in Main Generator.Short Found in C Phase, Apparently Caused by Metal Cylinder Found Lodged in Windings.Duration of Shutdown Not Yet Established ML20236U8561975-09-26026 September 1975 PN-75-098:on 750926,guard Received Call from Onsite Extension That Bomb Was in Plant.Bomb Threat Procedures Were Instituted.No Bomb Found ML20236T9821975-06-25025 June 1975 PN-75-041:for Several Weeks,Westinghouse Has Been Repairing Cladding Cracks in Sgs.Cracks Apparently Caused by Saltwater Intrusion Which Occurred When Generators Were Shipped by Barge Several Years Ago ML20236T9921975-06-18018 June 1975 PN-75-038:on 750617,fire Occurred in Temporary Const Bldg at Site.Ofc Equipment,Benches & Boxes of Insulation Destroyed. State of Ny Informed ML20236U2341975-06-0202 June 1975 PN-75-030:on 750602,Insp & Enforcement Ofc Was Informed That Reactor Tripped from Loss of 1 Source of Offsite Power. Janitor Was Found on Small Parapet W/Serious Burns Over Portion of Body & Has Been Hospitalized ML20236U0171975-04-16016 April 1975 PN-75-011:on 750416,licensee Reported That Bomb Threat Called Into New York Daily News Newspaper,To Effect That Three Bombs Placed at Two Power Plants of Consolidated Edison Co.No Bombs Found 1997-08-22 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000003/19980191999-03-0909 March 1999
[Table view]Insp Rept 50-003/98-19 on 981130-990222.No Violation Noted. Major Areas Inspected:Review of Facility Mgt & Control ML20237D1381998-08-19019 August 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Between 971024 & 980528,licensee Failed to Assure That Design Change in Oct 1997 Subject to Design Control Measures ML20236M6011998-07-0606 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violation Noted:On 970808,double Verifications of Steps 3.4.1 & 3.5.2 of PT-W1,which Involved Checks of DG Compressor,Not Performed,But Records Created ML20154Q1951998-01-22022 January 1998 Partially Deleted Investigation Rept 1-97-038.Noncompliance Noted.Major Areas Investigated:Falsification of Surveillance Test Records by Nuclear Production Technician ML20217H3531997-10-0707 October 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violation Noted:Con Edison Did Not Operate within Restrictions of TS Figure 3.1.A-3,in That Pressurizer Level Was Greater than 30% PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR ML20217R3361997-08-19019 August 1997 NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Measures Were Not Established to Assure That Applicable Regulatory Requirements & Design Basis,Were Correctly Translated Into EOPs IR 05000247/19930261993-11-23023 November 1993 Insp Rept 50-247/93-26 on 931108-12.No Violations Noted. Major Areas Inspected:Mgt Support Plans,Protected & Vital Area Physical Barriers,Detection & Assessment Aids,Protected & Vital Area Access Control of Personnel IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000286/19930211993-09-17017 September 1993 Insp Rept 50-286/93-21 on 930830-0902.No Violations Noted. Major Areas Inspected:Mgt Support & Audits,Protected & Vital Area Physical Barriers,Detection & Assessment Aids & Protected Vital Area Access Control of Personnel PNO-I-90-094, on 901016,transfer of Fuel Assemblies Stuck in Upper Core Internals.No Apparent Damage to Dropped Fuel Assembly Occurred.Recovery Operations Secured1990-10-17017 October 1990 PNO-I-90-094:on 901016,transfer of Fuel Assemblies Stuck in Upper Core Internals.No Apparent Damage to Dropped Fuel Assembly Occurred.Recovery Operations Secured PNO-I-90-077, on 900906,unplanned Shutdown Greater than 48 H Occurred Due to RCS Packing Leak from Pressurizer Spray Valve.Plant Placed in Hot & Cold Shutdown.Licensee Activities Monitored & State of Ny Informed1990-09-0707 September 1990 PNO-I-90-077:on 900906,unplanned Shutdown Greater than 48 H Occurred Due to RCS Packing Leak from Pressurizer Spray Valve.Plant Placed in Hot & Cold Shutdown.Licensee Activities Monitored & State of Ny Informed PNO-I-90-065, on 900814,licensee Reported That Licensed Reactor Operator Tested Positive for Marijuana as Result of Random Fitness for Duty Test.Operator Unescorted Site Access Suspended for 14 Days1990-08-15015 August 1990 PNO-I-90-065:on 900814,licensee Reported That Licensed Reactor Operator Tested Positive for Marijuana as Result of Random Fitness for Duty Test.Operator Unescorted Site Access Suspended for 14 Days PNO-I-90-063, on 900809,plant Shutdown Due to Potential Loss of Three Emergency Diesel Generators.Caused by Blown Control Power Fuse.Fuse Replaced1990-08-0909 August 1990 PNO-I-90-063:on 900809,plant Shutdown Due to Potential Loss of Three Emergency Diesel Generators.Caused by Blown Control Power Fuse.Fuse Replaced ML20247K5281989-09-14014 September 1989 EN-89-086:on 890919,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Licensee Based on Security Violations Re Access Control & Illumination in Protected Area ML20247B9531989-08-24024 August 1989 Enforcement Conference Rept 50-286/89-15 on 890808.Major Areas Discussed:Security Program During Spring 1989 Plant Outage IR 05000286/19890151989-07-24024 July 1989 Partially Withheld Physical Security Insp Rept 50-286/89-15 on 890605-07 (Ref 10CFR73.21).Violations Noted Re Physical Barriers,Vital Areas & Access Controls.Major Areas Inspected:Detection & Assessment Aids & Alarm Stations ML20245G2181989-06-21021 June 1989 PNS-I-89-010:on 890621,Dept of Investigation in New York City Received Call Threatening Destruction of Plant & Ref 1977 Incident Where Damage Inflicted on Plant.Bomb Threat Contingency Procedures Implemented & Security Maintained IR 05000286/19890031989-06-13013 June 1989 Enforcement Conference Rept 50-286/89-03 on 890428 in King of Prussia,Pa Re Findings of Insp Repts 50-286/89-03 & 50-286/88-22.Violations Noted.Areas Discussed:Security Program During Current Outage ML20247A1051989-05-0909 May 1989 Notice of Violation from Insp on 890228-0417.Violation Noted:Technicians Failed to Secure Pump When Vibration Level Observed on Pump Motor Exceeded Procedural Limit of 3.5 Mils ML20247A0681989-05-0505 May 1989 Notice of Violation from Insp on 890314-25.Violation Noted: Workers Allowed to Enter High Radiation Areas W/O Being Provided or Accompanied by Individual Authorized in Radiation Protection Procedures IR 05000286/19890051989-04-11011 April 1989 Partially Withheld Physical Security Insp Rept 50-286/89-05 on 890227-0303 (Ref 10CFR73.21).Violations & Noncompliances Noted.Major Areas inspected:non-routine Event,Mgt Support, Security Program Plans & Audits & Physical Barriers ML20154Q7231988-09-21021 September 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Violations Noted:Qualification of Containment high-range Radiation Monitors Cable Connector Assembly Deficient PNO-I-88-065, on 880617,unit Tripped Due to High Water Level in Steam Generator 22.Caused by Contractor Cleaner Inadvertently Activating Boiler Feed Pump.Licensee Elected to Enter Cold Shutdown to Repair Connoseals1988-06-20020 June 1988 PNO-I-88-065:on 880617,unit Tripped Due to High Water Level in Steam Generator 22.Caused by Contractor Cleaner Inadvertently Activating Boiler Feed Pump.Licensee Elected to Enter Cold Shutdown to Repair Connoseals IR 05000247/19880121988-05-24024 May 1988 Physical Security Insp Rept 50-247/88-12 on 880407.No Noncompliance Noted.Major Areas Inspected:Program for Protection of Safeguards Info,Per 10CFR73.21,including Use of Required Storage Repositories & Handling Procedures IR 05000286/19880061988-05-19019 May 1988 Physical Security Insp Rept 50-286/88-06 on 880412-14.No Noncompliance Noted.Major Areas Inspected:Plan & Implementing Procedures,Organization,Program Audits,Testing & Maint,Physical Barriers & Security Sys Power Supply PNO-I-88-003, on 880101,steam Generator (SG) 23 Boiled Dry During Plant Heatup.Cause Not Stated.On 880104,station Mgt Started Evaluating Safety Significance of Event & Best Method to Refill Generator.Sg 23 Refilled on 8801051988-01-0707 January 1988 PNO-I-88-003:on 880101,steam Generator (SG) 23 Boiled Dry During Plant Heatup.Cause Not Stated.On 880104,station Mgt Started Evaluating Safety Significance of Event & Best Method to Refill Generator.Sg 23 Refilled on 880105 IR 05000286/19870131987-08-21021 August 1987 Safety Sys Outage Mod Insp Rept 50-286/87-13 on 870422-0714. Rept Describes Activities & Findings Associated W/First Portion of Team Insp Re Outage Design Insp IR 05000247/19870141987-06-0808 June 1987 Emergency Preparedness Insp Rept 50-247/87-14 on 870512-14. No Violations Identified.Major Areas Inspected:Licensee Annual Emergency Exercise Performed on 870513 IR 05000286/19870111987-05-14014 May 1987 Insp Rept 50-286/87-11 on 870420-24.No Violations Noted. Major Areas Inspected:Radiological Effluents Control Program,Mgt Controls,Air Cleaning Sys,Program Implementation & Previously Identified Items IR 05000286/19870091987-05-11011 May 1987 Insp Rept 50-286/87-09 on 870402-03.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Organization & Operating,Shipping & Receiving, Storage & Internal Control & Records & Repts PNO-I-87-039, on 870430,licensee Identified Potential Circuit Failure Preventing Automatic Start of Auxiliary Feedwater Pumps by Loss of Main Feedwater or lo-lo Steam Generator Signals.Circuit Modified for Independent Relays1987-05-0101 May 1987 PNO-I-87-039:on 870430,licensee Identified Potential Circuit Failure Preventing Automatic Start of Auxiliary Feedwater Pumps by Loss of Main Feedwater or lo-lo Steam Generator Signals.Circuit Modified for Independent Relays IR 05000286/19870031987-04-12012 April 1987 Exam Rept 50-286/87-03OL on 870224-26.Exam Results:Seven Senior Operator Candidates Passed All Portions of Exams.One Candidate Failed All Portions PNO-I-87-025, on 870326,licensee Announced Plans to Shut Down Reactor on 870327 Due to Steadily Increasing Leakage on Reactor Coolant Pump Seal.Caused by Degraded Seal.Shutdown Expected to Last 10 Days1987-03-26026 March 1987 PNO-I-87-025:on 870326,licensee Announced Plans to Shut Down Reactor on 870327 Due to Steadily Increasing Leakage on Reactor Coolant Pump Seal.Caused by Degraded Seal.Shutdown Expected to Last 10 Days IR 05000286/19870021987-03-18018 March 1987 Insp Rept 50-286/87-02 on 870127-29.No Violations Noted. Major Areas Inspected:Dosimetry Staffing & Training, Facilities & Equipment Procedures,Dose Assessment QA & Documentation & Recordkeeping IR 05000247/19870041987-03-16016 March 1987 Insp Rept 50-247/87-04 on 870203-0302.No Violations Noted. Major Areas Inspected:Routine Daily Insps,As Well as Unscheduled Backshift Insps of Onsite Activities,Operations, Maint,Surveillance & Review of Periodic & Special Repts ML20207S3401987-03-11011 March 1987 Notice of Violation from Insp on 870127-29 IR 05000247/19870021987-03-10010 March 1987 Insp Rept 50-247/87-02 on 870127-29.Violation Noted:Failure to Include Acceptance Limits for Battery Electrolyte Temp & Failure to Ensure Battery Room Temp within Normal Bounds ML20207R1791987-03-0606 March 1987 PNS-I-87-003:on 870306,security Officer at Offsite Training Ctr in Toddville,Ny Received Bomb Threat by Telephone.Search of Site Produced Negative Results.Local Law Enforcement Agencies Responded.Security Measures Heightened IR 05000286/19870011987-03-0505 March 1987 Insp Rept 50-286/87-01 on 870106-0217.Major Areas Inspected: Plant Operations Including Shift Logs & Records,Reactor Trips/Engineered Safeguards Actuation,Surveillance,Maint & Followup to Generic Ltr 83-28 & TMI Action Items ML20212J3921987-03-0202 March 1987 Notice of Violation from Insp on 870106-0202 IR 05000247/19870011987-02-26026 February 1987 Insp Rept 50-247/87-01 on 870106-0202.Violation Noted:No post-maint (Mod) Test Performed After Changing Location of Emergency Diesel Generator Svc Water Flow Indication & Control Instruments PNO-I-87-010, on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown1987-02-12012 February 1987 PNO-I-87-010:on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown ML20210V6021987-02-10010 February 1987 Notice of Violation from Insp on 861215-19 IR 05000286/19860241987-02-0909 February 1987 Insp Rept 50-286/86-24 on 861215-19.Violation Noted:Raychem Splices Identified W/Less than Required 2-inch Overlap & Bending Radii Less than Allowed IR 05000247/19860331987-01-27027 January 1987 Radiation Protection Insp Rept 50-247/86-33 on 861215-19.No Violations Noted.Major Areas Inspected:Alara,Internal Exposure Control & External Exposure Control ML20213A4821987-01-22022 January 1987 Notice of Violation from Insp on 861116-870105 IR 05000247/19861361987-01-21021 January 1987 Meeting Rept 50-247/86-136 on 861209.Major Items Discussed: Plans for Integrated Assessment of Auxiliary Feedwater Sys. Mods Being Considered Include Providing Direct Indication of Overspeed Trip Mechanism Status in Control Room ML20212K3521987-01-20020 January 1987 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Based on 860811-0922 Insp.Violation Noted:Reactor Heated Up Above 200 F W/Both Recirculation & Containment Spray Pumps Inoperable IR 05000286/19860231987-01-15015 January 1987 Onsite Regular & Backshift Insp Rept 50-286/86-23 on 861118- 870105.Violation Noted:Failure to Follow Administrative Procedures AP-6 & AP-25-3 Re Work Requests & Matl Substitutions,Respectively 1999-03-09 |
Text
TW vwcvwvw y pov y y'-W ;
l 10 CFR 2.790 INFORMATION h
l w %' ."? ., -
c.. PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE !
-- \
3' i September 26, 1975 j l
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-98 l This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation ;
and is basically all that is known by OIE staff as of 11:45 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS
. NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO
{
BE INACCURATE OR INCONE'JTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT I
-NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY ],
WILL BE ISSUED IF WARRANTED. I Facility: Indian Point 1, 2, 3 (DN 50-003, 247, 286) . . . .
Consolidated Edison Company of New York, Inc.
Subject:
BOMB THREAT ,
The Indian Point Station guard at the onsite gate received a call at j 10:20 a.m. from an onsite extension that a bomb is in the plant. ?
-Indian Point Station has instituted its bomb threat procedures. Nothing N$
had been found at the time of this notification. ,
,==. >
Media interest'is expected because of interest and attention to potential events at nuclear power plants. The State of New Yor?.: has been and is being kept informed. A press release is not planned.
OIE received notification of this occurre-nce by telephone call from Mr. J.
Manual, General Watch Foreman, at 11:10 a.m., 9/26/75.
The FBI and FPC were notified. ,
Contact:
FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 o
/
Distribution: /
Chairman Anders Commissioner Mason S. J. Chilk, SECY g Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA . g; g
L. V. Gossick, EDO ~~
D.F.Knut5,IE J. A. Harris, PA B. C. Rtfliche, NRR H. H. Brown, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg /J.20pg H St 4d'7p ; MNBB/AYd7; Luge;,,,o'/
. PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE
= 10 CFR 2.790 INFORMATION l 9807310117 750926 l l PDR 18sE ,
PN-75-098 PDR [
- - - - - - -