P _o r. d du C /

f^G PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE October 20, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-110 i

This preliminary notification constitutes EARLY notice of events of

)

.+

POSSIBLE safety or public interest significance.

The information l

presented is as initially received without verification or evaluation

)

and is basically all that is known by OIE staff as of 10:15 a.m. on the I

dat'e of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION TIAT.LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

~ NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

a. -..

Facility:

Indian Point 2 (DN 50-247)

Consolidated Edison Company of New York, Inc.

Subject:

UNSCHEDULED SHUTDOWN An unplanned shutdown was instituted at 1:15 p.m.,

October 16, 1975, due to an electrical fault in the main generator. A short was found in the C phase, apparently caused by a metal cylinder found lodged in the wind-ings. The source of the cylinder is unknown.

u=-=

l

~ Duration of the shutdown is not yet established.

It will be a minimum of l

one week for correction of this problem.

Stator rework, which could j

take an additional four to five weeks, is being considered.

-"=

i j

Media interest is expected because of close attention paid to nuclear facility availability. The State of New York has been and is being kept informed. A press release is planned by the licensee.

OIE received notification of this occurrence by telephone from Mr. Makepiece, Director of Technical Engineering, at 9:00 a.m., October 20, 1975.

Contact:

GHBidinger, IE x7261 HDThornburg, IE x7358 JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY l

Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA

{

L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA I

l B. C. R,u. sche, NRR,,

J. La Fleur, ISP T. J. McTiernan, AIA K. R. " Chapman, NMSS H. K. Shapar, ELD

MNBB 3
Luge,

[

Transmitted: P Bldg 2 4 ; E St1,/

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE Oi V N=

<y mE 9 9807310304 751020 V'

PDR I&E 4

PN-75-110 PDR I