IR 05000282/2012503

From kanterella
Revision as of 11:56, 26 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000282-12-503, 05000306-12-503, 07/09/2012 - 07/13/2012, Prairie Island Nuclear Generating Plant, Units 1 and 2, Baseline Emergency Preparedness Biennial Exercise Inspection
ML12221A270
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/08/2012
From: Holmberg M S
Plant Support Branch II
To: Molden J
Northern States Power Co
References
IR-12-503
Download: ML12221A270 (10)


Text

August 8, 2012

Mr. Jim Molden Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2; BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000282/2012503; 05000306/2012503

Dear Mr. Molden:

On July 13, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on July 13, 2012, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Mel Holmberg, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-282, 50-306;72-010 License Nos. DPR-42, DPR-60; SNM-2506

Enclosure:

Inspection Report 05000282/2012503; 05000306/2012503

w/Attachment:

Supplemental Information cc w/encl: Distribution via ListServŽ Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-282; 50-306;72-010 License Nos: DPR-42; DPR-60; SNM-2506 Report No: 05000282/2012503; 05000306/2012503 Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant, Units 1 and 2 Location: Welch, MN Dates: July 9 through 13, 2012 Inspectors: R.Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector K. Stoedter, Senior Resident Inspector Approved by: M. Holmberg, Acting Chief Plant Support Branch Division of Reactor Safety

1 Enclosure

SUMMARY OF FINDINGS

IR 05000282/2012503, 05000306/2012503; 07/09/2012 - 07/13/2012;

Prairie Island Nuclear Generating Plant, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection. This report covers a one week period of announced baseline inspection by two regional inspectors and one senior resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NURE-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified

and Self-Revealed Findings

Cornerstone: Emergency Preparedness

No findings were identified.

B. Licensee-Identified Violations

No violations were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness

1EP1 Exercise Evaluation

.1 Exercise Evaluation

a. Inspection Scope

The inspectors reviewed the July 10, 2012, biennial emergency preparedness exercise objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2010, 2011, and 2012, to verify that those drills' scenarios were sufficiently different from the scenario used in the July 10, 2012, exercise.

The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:

  • Control Room Simulator (CRS);
  • Operations Support Center (OSC); and
  • Emergency Operations Facility (EOF). The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.

The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.

This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.

b. Findings

No findings were identified.

3 Enclosure

OTHER ACTIVITIES

Cornerstone:

Emergency Preparedness

4OA1 Performance Indicator Verification

.1 Drill/Exercise Performance

a. Inspection Scope

The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the third quarter 2011 through first quarter 2012. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.

b. Findings

No findings were identified.

.2 Emergency Response Organization Drill Participation

a. Inspection Scope

The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the third quarter 2011 through first quarter 2012. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2011 and 2012 drills, and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the to this report. This inspection constituted one ERO drill participation sample as defined in IP 71151-05.

b. Findings

No findings were identified.

4 Enclosure

.3 Alert and Notification System

a. Inspection Scope

The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the third quarter 2011 through first quarter 2012. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ANS sample as defined in IP 71151-05.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Exit Meeting Summary

On July 13, 2012, the inspectors presented the biennial exercise inspection results to you and other members of your staff. You acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.

.2 Public and Media Briefing

On July 13, 2012, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region VII Field Office staff at the Goodhue County Emergency Operations Cent er in Red Wing, Minnesota.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

J. Molden, Site Vice President
T. Bacon, Assistant Operations Manager
J. Boesch, Maintenance Manager
J. Callahan, Corporate Emergency Preparedness Manager
M. Davis, Regulatory Affairs Analyst
K. DeFusco, Emergency Preparedness Manager
P. Huffman, Site Engineering Director
M. Jones, Emergency Preparedness Coordinator
J. Lash, Nuclear Oversight Manager
J. Nemcek, Emergency Preparedness Coordinator
T. Ouret, General Superintendent, Operations Training
K. Peterson, Business Support Manager
A. Pullam, Training Manager
A. Schafer, Emergency Preparedness
J. Sorensen, Vice President Nuclear Operations Support
E. Weinkam, Nuclear Emergency Preparedness Director

Nuclear Regulatory Commission

K. Stoedter, Senior Resident Inspector
P. Zurawski, Resident Inspector

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

Opened, Closed and

Discussed

None

Attachment

LIST OF DOCUMENTS REVIEWED

The following is a partial list of documents reviewed during the inspection.

Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
1EP1 Exercise Evaluation

- Prairie Island Nuclear Generating Plant Emergency Plan; Revision 46 - F3-1; Onsite Emergency Organization; Revision 26 - F3-2; Classification of Emergencies; Revision 43 - F3-4; Responsibilities During an Alert, Site Area Emergency, or General Emergency;

Revision 40 - F3-5; Emergency Notifications; Revision 30

- F3-6; Activation and Operation of Technical Support Center; Revision 25 - F3-7; Activation and Operation of Operational Support Center; Revision 23 - F3-8; Recommendations for Offsite Protective Actions; Revision 34

- F3-9; Emergency Evacuation; Revision 9

- F3-11; Search and Rescue; Revision 13

- F3-17; Core Damage Assessment; Revision 13 - F3-17.1; Core Damage Determination; Revision 2 - F3-18; Thyroid Iodine

Blocking Agent (Potassium Iodide); Revision 13

- CAP01344377; Exercise-Failed to Complete Backshift Schedule

- CAP01344420; Exercise-PAR Change Notification Was UnsatIsfactory For All Offsite Agencies - CAP01344373; Exercise-Site Area Notification Release Status Was Inaccurate - CAP01344477; Exercise-Press Releases Were Issued in an Untimely Manner - CAPs0134447/395/351; Exercise-KI Administration Was Unsatisfactory

4OA1 Performance Indicator Verification

-PINGP 1325; PINGP EP Performance Simulator Record; July 2011 - March 2012 -PINGP 1326; PINGP EP Performance Record; July 2011 - March 2012

-PINGP 577; Emergency Notification Report Form; July 2011 - March 2012

-PINGP 580; Emergency Notification Call List; July 2011 - March 2012

-AR

01322029; DEP Missed Opportunity on Simulator Session; January 24, 2012 -AR
01320074; Simulator DEP Was Canceled Due to Lack of SROs; January 10, 2012
Attachment

LIST OF ACRONYMS

USED [[]]
ADAMS Agencywide Document Access Management System
ANS Alert and Notification System
AR Action Request
CAP Corrective Action Program
CFR Code of Federal Regulations
CRS Control Room Simulator
DRS Division of Reactor Safety
EOF Emergency Operations Facility
EP Emergency Preparedness
ERF Emergency Response Facility
ERO Emergency Response Organization
IMC Inspection Manual Chapter
IP Inspection Procedure
IR Issue Report
KI Potassium Iodide
NEI Nuclear Energy Institute
NOS Nuclear Oversight
NRC U.S. Nuclear Regulatory Commission
OSC Operations Support Center
PAR Protective Action Recommendation
PARS Publicly Available Records System
PI Performance Indicator

SDP Significance Determination Process TSC Technical Support Center

August 8, 2012

Mr. Jim Molden Site Vice President

Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East

Welch,

MN 55089
SUBJEC T: PRAIRIE
ISLAND [[]]
NUCLEA R GENERATING PLANT,
UNITS 1

AND 2; BASELINE EMERGENCY PREPAREDNESS

BIENNIAL EXERCISE INSPECTION REPORT 05000282/2012503; 05000306/2012503 Dear Mr. Molden:

On July 13, 2012, the

U.S. Nuclear Regulatory Commission (

NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on July 13, 2012, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with

10 CFR 2.390 of the
NRC 's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records System (
PARS ) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /

RA/ Mel Holmberg, Acting Chief

Plant Support Branch Division of Reactor Safety Docket Nos. 50-282, 50-306 and 72-010 License Nos.

DPR -42, DPR-60 and SNM-2506 Enclosure: Inspection Report 05000282/2012503; 05000306/2012503 w/Attachment: Supplemental Information cc w/encl: Distribution via ListServŽ