IR 05000282/2020004

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000282/2020004 and 05000306/2020004
ML21035A172
Person / Time
Site: Prairie Island  
Issue date: 02/04/2021
From: Hironori Peterson
NRC/RGN-III
To: Domingos C
Nuclear Management Co
References
IR 2020004
Download: ML21035A172 (20)


Text

February 4, 2021

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000282/2020004 AND 05000306/2020004

Dear Mr. Domingos:

On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant. On January 7, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects

Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2020004 and 05000306/2020004

Enterprise Identifier: I-2020-004-0027

Licensee:

Northern States Power Company

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, Minnesota

Inspection Dates:

October 01, 2020 to December 31, 2020

Inspectors:

S. Bell, Health Physicist

M. Garza, Emergency Preparedness Inspector

L. Haeg, Project Manager

M. Holmberg, Senior Reactor Inspector

T. McGowan, Resident Inspector

K. Pusateri, Senior Resident Inspector

Approved By:

Hironori Peterson, Chief

Branch 3

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Prairie Island Unit 1 began the inspection period shutdown for refueling outage 1R32 and returned to power operation on October 11, 2020 and remained at or near 100 percent power for the remainder of the inspection period with the exception of a brief downpower to approximately 90 percent during feed water system work on December 15, 2020. Prairie Island Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 A train component cooling system walkdown during D2 fast start on 10/20/2020
(2) Walkdown on Unit 1 A train safety injection pump on 10/06/2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire area 41B 121 electric fire pump room sub-basement on 10/15/2020
(2) Fire area 26 D2 room during D1 work window on 10/27/2020
(3) Fire area 31 U1 auxiliary feed water pump room on 10/29/2020
(4) Fire area 35 battery room #21 during yellow fire risk window on 11/10/2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill for fire area 69 turbine building U1 695' on 11/10/2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) 122 control room chiller on 12/10/2020

===71111.08P - Inservice Inspection Activities (PWR)

PWR Inservice Inspection Activities Sample (IP Section 03.01)===

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary were appropriately monitored for degradation and that repairs, and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from September 21, 2020 - October 1, 2020:

03.01.a - Nondestructive Examination and Welding Activities.

  • Visual VT-3 Examination, Pipe Supports H-1, H-2 and H-4, Safety Injection System
  • Welds 1 and 6, Replacement of Valves CL-113-2, CL-115-2 and Associated Piping (Work Order 700057958-0010)03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.
  • Condition Evaluation - Active Fitting Leak 1PT-124
  • QIM 501000018751, Leakage Identified by Pressure Test SP 1168.13 Safety Injection System Pressure Test
  • QIM 501000017687, 1R31 SP 1392 Unit 1 Insulated Bolted Connection Inspection Pressure Test

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (2 Samples)

The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating test which was administered between March 10 - 27, 2020 and May 11 - June 5, 2020.

(1) Morning session simulator training on 12/15/2020
(2) Reactivity manipulations following FW system work on 12/20/2020

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during reactivity manipulations following Feedwater System work on 11/03/2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operator training in the simulator on 12/08/2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Emergency diesel generator maintenance effectiveness on 11/04/2020

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Review of QC program during 1R32 on 10/22/2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Walkdown on Unit 1 B train ECCS during D1 on 11/03/2020 (2)121 control room chiller work protected equipment walkdown PRA review on 12/08/2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Functionality of 121/122 FLEX diesel-driven submersible pumps on 10/14/2020
(2) Operability of Bus 16 bus bars with cracks on 10/05/2020
(3) Unit 1 B loop cold leg PTLR issue on 10/07/2020
(4) Steam generator PORV controller classification issue on 11/24/2020
(5) Power range 1N42 calibration issue on 12/02/2020
(6) Elevated Bus 112 room temperature on 12/08/2020
(7) Accident source term and steam generator margin to overfill calculations on 12/30/2020

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Install U1 Sump B Pump Down Temporary Modification on 12/11/2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Unit 1 D1 EDG work window on 11/3/2020 (2)122 FLEX DD submersible pump surveillance with hydraulic hose failure on 10/23/2020
(3) PMT of D1 diesel generator after fuel injector maintenance and modification on 11/6/2020
(4) D5 EDG ventilation damper testing following maintenance on 12/02/2020 (5)12 charging pump testing following maintenance on 12/03/2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1) (Partial) 1R32

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Inservice Testing (IP Section 03.01)

(1) SP 1088B Train B safety injection quarterly surveillance on 12/22/2020

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) SP 1106A 12 diesel driven cooling water pump surveillance on 11/10/2020

FLEX Testing (IP Section 03.02) (1 Sample)

(1) 122 FLEX Submersible Pump Surveillance hydraulic hose issue on 12/02/2020

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors completed an evaluation of submitted emergency action level and emergency plan changes on December 2, 2020. This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)

The inspectors evaluated:

(1) Licensed operator re-qualification scenario with Drill and Exercise Performance Indicator evaluation on 11/19/2020
(2) Drill and exercise performance for September and October 2020 on 12/01/2020

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated radiological protection-related instructions to plant workers.

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) Observed workers exiting the RCA at Unit 1 during a refueling outage.
(2) Observed the usage, availability, and sensitivity of in plant survey instrumentation for contamination monitoring located at the Unit 1 containment exit during the Unit 1 refueling outage.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (3 Samples)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) Unit 1 Containment Sump C Inspection performed under RWP #201031, 0
(2) Unit 1 Containment Refueling Activities performed under RWP #201031, 0
(3) Unit 1 Containment Reactor Cavity Decontamination performed under RWP #201031, 0

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) Barrel Yard
(2) Unit 1 Containment Sump C
(3) Unit 1 Containment Regeneration Heat Exchanger Room

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.04 - Occupational Dose Assessment

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situations:

(1) Dose assessment for three declared pregnant workers

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) Unit 1 (April 1, 2019 - September 30, 2020)

Unit 2 (April 1, 2019 - September 30, 2020)

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) Unit 1 (April 1, 2019 - September 30, 2020) Unit 2 (April 1, 2019 - September 30, 2020)

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) Unit 1 (April 1, 2019 - September 30, 2020) Unit 2 (April 1, 2019 - September 30, 2020)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 MSPI: AC Power (October 1, 2019 - September 30, 2020)
(2) Unit 2 MSPI: AC Power (October 1, 2019 - September 30, 2020)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 MSPI: RHR (October 1, 2019 - September 30, 2020)
(2) Unit 2 MSPI: RHR (October 1, 2019 - September 30, 2020)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 MSPI: Cooling Water (October 1, 2019 - September 30, 2020
(2) Unit 2 MSPI: Cooling Water (October 1, 2019 - September 30, 2020

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)

(1) Unit 1 (October 1, 2019 - September 30, 2020)
(2) Unit 2 (October 1, 2019 - September 30, 2020)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) (October 1, 2019 - September 30, 2020)

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) AR 501000043177; Post-Maintenance Issue Trend on 10/19/2020

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) AR 501000044544; Potential Trend of Critical Equipment on 10/22/2020
(2) Part 21 Relating to Masoneilan Controllers

INSPECTION RESULTS

Observation: Semi-Annual Trend Review of AR 501000043177, "Potential Trend: Incorrect PMT Activities" 71152 The inspectors reviewed AR 501000043177, "Potential Trend: Incorrect PMT Activities,"

initiated by the licensee on August 13, 2020, to examine a cognitive trend surrounding problems identified during post-maintenance testing that originated in the preparation of the activities. The licensee re-established expectations that were communicated to the applicable departments regarding maintenance restoration activities. Based on their review of the trend and the actions taken to address the issues, the inspectors determined that the actions were adequate to address the trend and did not identify any concerns with the licensee's resolution of this issue. No findings or violations were identified.

Observation: Annual Sample of AR 501000044554, "Potential Trend of Critical Equipment Failures" 71152 Based on an unplanned reactor trip of Unit 1, and an unplanned circulating water pump trip on Unit 2 - both in the Fall of 2020, the licensee generated AR 501000044554, "Potential Trend of Critical Equipment Failures." Although a potential trend was not identified based on the evaluations performed for each issue, organizational aspects related to the two issues were addressed in RCE 501000043602. The inspectors did not identify any concerns related to the licensee's evaluation of this potential trend and resulting actions. No findings or violations were identified.

Observation: Annual sample of AR 501000039193 Masoneilan 8005N Converter Part 21 Issue on 12/07/2020 71152 The inspectors evaluated licensee CAP 501000016276, regarding a May 2018, Part 21 report, involving a manufacturing defect with Masoneilan model 8005N I/P converters. These converters were used at Prairie Island to control the safety-related steam generator power operated relief valves (S/G PORV). The defect involved an internal roll pin that wasnt fully inserted during manufacture. As a result, the converter could operate normally for an indeterminate period, but then fail, if the pressure regulating ball fell out of the space in which it was normally restricted by a properly inserted roll pin. The only way to determine the pin position, was to x-ray the converter. The licensee had initiated actions to x-ray the components but did not complete those actions. The manufacturer determined that the issue was not generic and was limited to a single converter sent to another facility. Based on this information, the licensee closed the CAP, as the part 21 was deemed not applicable and therefore their installed converters were operable.

On October 15, 2018, following maintenance, the converter for the 12 S/G PORV failed a post-calibration test. The subject converter was replaced under AR 501000018617 with a similar model, and the failed component was sent to a vendor for forensic analysis. In March 2020, the licensee obtained the results of this analysis, which confirmed that the failure was due to misalignment of the internal roll pin. Subsequently, the licensee created CAPs 501000039193 and 501000039400 to reevaluate the part 21 and determine the corrective actions. A licensee past-operability determination concluded that the 12 S/G PORV had been operable, and that the converter internal regulating ball likely dislodged as a result of the maintenance activity, causing the test failure. Additionally, given the result of this past-operability evaluation and based on past surveillance history, the licensee concluded that the other S/G PORVs remained operable. Additional actions left the replacement frequency for the installed converters coincident with planned maintenance on the S/G PORVs in subsequent refueling outages. Therefore, these components would remain installed in the plant for the next several years.

The inspectors could not refute the licensees operability assessment but did question whether the licensee had adequately assessed and managed the risk from the potential adverse condition. As a result of the inspectors concerns, the licensee created assignments to evaluate the risk aspect from this potential defect for the installed 8005N I/P controllers and to develop additional corrective actions based on the results of that assessment. Additionally, corrective actions were also developed to track the replacement of the installed converters with either x-rayed models or equivalent models, not subject to the defect. The inspectors concluded that these actions were reasonable and noted that the licensee is aware that they may be potentially at risk should these converters fail due to a potential defect prior to scheduled replacement.

No violations or findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 1, 2020, the inspectors presented the Inservice inspection results to J.

Ohotto, General Manager Nuclear Fleet Operations, and other members of the licensee staff.

  • On October 14, 2020, the inspectors presented the radiation protection baseline inspection results to Mr. C. Domingos, Acting Site Vice President, and other members of the licensee staff.
  • On December 2, 2020, the inspectors presented the IP 71114.04 Exit Meeting inspection results to Mr. B. Carberry, Xcel Emergency Preparedness Manager, and other members of the licensee staff.
  • On December 16, 2020, the inspectors presented the Annual Licensed Operator Requalification Examination Results inspection results to Mr. S. Sarrasin, Licensed Operator Requalification Training Lead, and other members of the licensee staff.
  • On January 7, 2021, the inspectors presented the Exit Meeting inspection results to Mr. C. Domingos, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Corrective Action

Documents

Resulting from

Inspection

AR

501000047958

Surface Water Corrosion on 21 Clg Water Strainer

01/22/2021

Drawings

NF-39245-1

Flow Diagram Component Cooling Systems, Unit 1

71111.05

Fire Plans

Fire Detection

Zone 35

Fire Detection Zone 35: F5 Appendix A

Procedures

F5

Fire Hazard Analysis: Appendix Fl (Fire Area 31)

F5

Appendix A5-A: Elevation 695'

F5 Appendix A

Fire Detection Zone 97

71111.07A Corrective Action

Documents

AR

501000036554

NOS: KB3 Installed Without Thread Engagement

01/14/2020

AR

501000036567

Excessive Leakage During TP 1687

01/16/2020

AR

501000036690

Surface Rust on Base Plate

03/04/2020

AR

501000037537

Non-Qualified Parts Installed in 121 CR Chiller

2/11/2020

AR

501000047029

ZN-02 Frequency Different than Maintenance Rule

01/15/2020

Corrective Action

Documents

Resulting from

Inspection

AR

501000047029

Maintenance Rule Functions Not Updated Post Maintenance

Rule Evaluation Panel

2/11/2020

Work Orders

WO 700057576

2 Control Room Chiller Inspection (PM3138-3)

2/16/2020

71111.08P Corrective Action

Documents

QIM

501000017687

1R31 SP 1392 Unit 1 Insulated Bolted Connection Inspection

Pressure Test

10/06/2018

QIM

501000018751

Leakage Identified by Pressure Test SP 1168.13 Safety

Injection System Pressure Test

11/05/2018

QIM

501000018755

1R31, SP 1168.10 RHR System Pressure Test

11/05/2018

QIM

1R31 SP 1168.16 Pressure Test ISI

11/05/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000019097

QIM

501000019994

Condition Evaluation Leak 1FT-411-Coolant Loop A Flow

Transmitter

01/02/2019

QIM

501000020187

ISI Indications SP 1168.16 Pressure Test

01/02/2019

QIM

501000034635

Condition Evaluation Active Fitting Leak 1PT-124

01/02/2019

QIM

501000036454

Cooling Water Thru-Wall Drip 3-CL-88

09/08/2020

Corrective Action

Documents

Resulting from

Inspection

QIM

501000044218

1R32 NRC ISI Inspection 2020 Item

09/18/2020

QIM

501000044883

1R32 ISI RI-ISI Program N-716-1

09/30/2020

Miscellaneous

Weld Control Record, (WO 700008169-0180) Welds 1 and 2

2/08/2017

WPS B31-P1P1-GTSM-001

PQR PBNP-WP-6

PQR KNPP-GMP 102-311-GS-PQR

PQR PAL-SM-1-1(1)

Weld Control Record (WO 700057958-0010), Welds 1 and 3 10/11/2019

Personnel Certification Statement-MT/PT/UT/VT Level II; A

Franck

08/11/2020

Personnel Certification Statement-MT/PT/UT/VT Level II; C

Pearson

05/26/2020

Personnel Certification Statement-MT/PT/UT/VT Level III; A

Jensen

06/22/2020

NDE Reports

2004P033

Liquid Penetrant Examination-Integral Attachment H-1/1A,

RCP-11

09/25/2020

2018U001

FW Elbow-Pipe Weld W-4

10/03/2018

2018U014

FW Pipe to Elbow Weld 3

10/02/2018

20P003

Liquid Penetrant Examination-Integral Attachment H-12,

AFW

09/28/2020

20V027

Visual Examination of Pipe Hanger, Support or Restraint

(VT-3), H-1, SI

09/24/2020

20V028

Visual Examination of Pipe Hanger, Support or Restraint

09/24/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

(VT-3), H-2, SI

20V029

Visual Examination of Pipe Hanger, Support or Restraint

(VT-3), H-4, SI

09/24/2020

20V046

Visual Examination of Pipe Hanger, Support or Restraint

(VT-3), H-12, AFW

09/26/2020

BOP-MT-19-01

Magnetic Particle Examination-Welds I & 6

10/18/2019

BOP-PT-19-014

Liquid Penetrant Examination-Welds 2,3,4,5,7,8,9

10/07/2019

BOP-UT-20-006

UT Calibration/Examination-6-RC-13B, W10

09/25/2020

OP-VT-17-034

Visual Examination: System Leakage (VT-2) - Dl Air Coolant,

Jacket Coolant, and Lube Oil Cooler

2/18/2017

OP-VT-19-022

Visual Examination: System Leakage (VT-2) - 4-CL-90,

4-CL-23, CL-115-2, CL-113-2

10/18/2019

Procedures

FP-PE-FAC-01

FAC Program

FP-PE-FAC-02

Layout and Marking of Piping and Components for Flow

Accelerated Corrosion Program

FP-PE-NDE-200

Solvent Removable Visible Dye Penetrant Examination

FP-PE-NDE-402

Ultrasonic Examination of Austenitic Pipe Welds -

Supplement 2

FP-PE-NDE-530

Visual Examination, VT-3

H.2

Boric Acid Corrosion Control Program,

H10.7

Fifth Interval Inservice Inspection (ISI) Plan

H10.7.1

ISI Component Schedule

Work Orders

700008169-0180

Perform Weld Build-up Machining on Dl Floating Channel

Heads

2/08/2017

700057958-0010

Replace Valves CL-113-2, CL-115-2 and Piping

10/11/2019

71111.12

Procedures

PM 3001-2-D1

D1 Diesel Generator Inspection (034-011)

Work Orders

WO 700058618-

0010

Replace Jumper Gaskets and Seals

71111.15

Calculations

CN-CRA-11-17

Steam Generator Tube Rupture Margin to Overfill Analysis

for Prairie Island Units 1 and 2 to Support the Alternate

Source Term Submittal

05/26/2011

NSPM

Calculation

(DOC) No. CN-

Prairie Island SGTR Hand Calculation for Input to Alternate

Source Term Dose Analysis

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CRA-09-32

NSPM

Calculation (Doc)

No. ENG-EE-166

Unit 1 480VAC Safeguards Bus Temperature Limitations

06/28/2018

Corrective Action

Documents

AR

501000046983

Bus 112 Room Temperature

2/08/2020

Miscellaneous

L-PI-09-114 (10 CFR 50.90)

License Amendment Request (LAR) to Adopt the Alternate

Source Term Methodology

10/27/2009

PINGP

Calculation (GEN-

PI-081)

EAB, LPZ, and CR Doses Due to Steam Generator Tube

Rupture Accident - AST

07/25/2019

TAC Nos.

ME2609 and

ME2610

Prairie Island Nuclear Generating Plant, Units 1 and 2 -

Issuance of Amendments Re: Adoption of Alternate Source

Term Methodology

01/22/2013

Procedures

C18.1

Engineered Safeguards Equipment Support Systems:

(Battery Room Cooling and Ventilation)

EOP 1E

Steam Generator Tube Rupture

71111.18

Corrective Action

Documents

AR

501000047167

Sump B Temp Mod Pump Needs to be Replaced

2/16/2020

Engineering

Changes

AR

601000002790

Install Unit 1 Sump B Pump Down TMod

2/23/2020

71111.19

Procedures

WO 700041908-

0010

D1 Diesel Generator Install Gasketless Injector Nozzles

71111.22

Procedures

SP 1088B

Train B Safety Injection Quarterly Test

71114.04

Miscellaneous

PI-2019-663

Changes to EAL Technical Basis

11/14/2019

PI-2019-680

CFR 50.54(q) Review Form

11/14/2019

71114.06

Miscellaneous

EP Performance Records

09/02/2020

71124.01

Corrective Action

Documents

501000032260

Boundary Controls for HRAs

09/24/2019

501000033781

Elevated Dose Rates SFP Skimmer Filters

10/22/2019

501000044384

1R32 - Worker Exited RCA Out of Process

09/21/2020

501000045075

Level 2 PCE 1R32 #1

10/04/2020

Miscellaneous

Technical Basis Document 20-002; Source Checks in the

Field for Reducing Radiation Survey Frequency.

04/07/2020

Prairie Island Plant Alpha Characterization Study

09/21/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20 National Source Tracking System Annual

Reconciliation

01/02/2020

Procedures

FP-RP-NISP-05

Access Controls for High Radiation Areas

FP-RP-NISP-07

Control of Radioactive Material

FP-RP-SEN-02

Radiological Work Planning and Controls

Radiation

Surveys

M-202001002-17

Down Post Sump C from VHRA

10/02/2020

PI-M-20161108-2

1R30 Rx Head Set

11/08/2016

PI-M-2018-1013-

1R31 Rx Head Set

10/13/2018

PI-M-20191022-9

Area Around SFP Skimmer Filter and Pump

10/22/2019

Radiation Work

Permits (RWPs)

201031

1R32 Sump C

Self-Assessments

Self-Assessment for the NRC Inspection Procedure 71124.01

Undated

Nuclear Oversight Audit Report - 2020 Radiation

Protection/Radiological Environmental Monitoring

Program/Radwaste Shipping

09/11/2020

71124.04

Miscellaneous

Declared Pregnant Worker Dose Assessment

10/10/2019

Declared Pregnant Worker Dose Assessment

03/05/2020

Declared Pregnant Worker Dose Assessment

04/01/2020

Radiation Work

Permits (RWPs)

2000059

Dose Restricted Individuals

71151

Miscellaneous

Electronic Dosimetry Alarm Logs 10/01/2019 Through

09/30/20

Various

Chemistry Radiochemistry Data for Units 1 and 2 for DEI

from 10/01/2019 Through 09/30/2020.

Alert and Notification System Reliability Performance

Indicator Records

07/01/2019 -

09/30/2020

Emergency Response Organization Drill Participation

Performance Indicator Records

06/30/2019 -

09/30/2020

Drill and Exercise Performance - Performance Indicator

Records

06/30/2019 -

09/30/2020

71152

Corrective Action

Documents

AR

501000016276

OE: PVNGS ADV Failed to Open. Faulty I/P

08/29/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR

501000018617

B SG PORV Not Opening

10/15/2018

AR

501000039193

Manufacturing Defect Found in Failed I/P

03/27/2020

AR

501000039400

Inadequate Screening of CAP 501000018617

04/03/2020

AR

501000043177

Potential Trend: Incorrect PMT Activities

08/13/2020

Corrective Action

Documents

Resulting from

Inspection

AR

501000045858

Bus 16 Logic Relay Cabinet Missing Fasteners

10/27/2020

AR

501000047218

Maintenance Rule Basis Document Scoping

2/18/2020