Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3
ML23215A167
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/15/2023
From: Ballard B
NRC/NRR/DORL/LPL3
To: Conboy T
Northern States Power Co
References
EPID L-2023-LLA-0135
Download: ML23215A167 (1)


Text

December 15, 2023 Mr. Thomas Conboy Site Vice President Northern States Power Company - Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT REQUEST TO REVISE SURVEILLANCE REQUIREMENT 3.8.1.2 NOTE 3 (EPID L-2023-LLA-0135)

Dear Mr. Conboy:

By letter dated September 28, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23271A205), as supplemented by letter dated December 5, 2023 (ML23339A060), Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), doing business as Xcel Energy, submitted a license amendment request for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The proposed amendment would revise Technical Specification 3.8.1, AC [alternating current] Sources - Operating, Surveillance Requirement 3.8.1.2, Note 3, to remove details describing a modified start and reference to manufacturers recommendations. The purpose of this letter is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90, Application for amendment of license, construction permit, or early site permit, of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.

Section 50.34, Contents of applications; technical information, of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application, as supplemented, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as

T. Conboy compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal and supplement, the NRC staff has estimated that this licensing request will take approximately 230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> to complete. The NRC staff expects to complete this review by October 31, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-0680 or via e-mail at Brent.Ballard@nrc.gov.

Sincerely,

/RA/

Brent T. Ballard, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: Listserv

ML23215A167 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NAME BBallard SRohrer (ABaxter for) JWhited DATE 12/14/23 12/15/2023 12/15/2023 OFFICE NRR/DORL/LPL3/PM NAME BBallard DATE 12/15/2023