Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1 - Summary of the Jan-Feb 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report
ML24064A221
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/14/2024
From: Lance Rakovan
NRC/NMSS/DREFS/ELRB
To: Penfield R
Energy Harbor Nuclear Corp
Shared Package
ML24064a217 List:
References
EPID L-2023-LNE-0002
Download: ML24064A221 (7)


Text

Rod L. Penfield Site Vice President Energy Harbor Nuclear Corp.

Perry Nuclear Power Plant P.O. Box 97, Mail Stop A-PY-A290 Perry, Ohio 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT UNIT 1 -

SUMMARY

OF THE JANUARY-FEBRUARY 2024 ENVIRONMENTAL AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION ENVIRONMENTAL REORT (EPID NUMBER: L-2023-LNE-0002)

Dear Rod L. Penfield:

A review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) participated in a remote audit during the week January 22, 2024, for Perry Nuclear Power Plant Unit 1, as part of the license renewal (LR) application environmental review. The remote audit was supplemented by a site visit on February 1, 2024, and additional discussions before a formal exit conducted on February 8, 2024. The goal of the audit was to gather information to ensure that the environmental requirements for LR, as codified in Title 10 of the Code of Federal Regulations Part 51 Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, were met. A letter dated December 20, 2023 (Agencywide Documents Access and Management System [ADAMS] ML23321A047) was sent containing an audit plan.

An entrance meeting was held on January 22, 2024, to introduce participants and discuss audit logistics. During the remainder of the audit, the NRC staff, supported by Pacific Northwest National Laboratory (PNNL) staff, participated in smaller groups (breakout sessions) with Energy Harbor Nuclear Corp. (Energy Harbor) and Enercon Services, Inc. (Enercon) representatives to address the audit needs identified in the audit plan. Enclosure 1 to this letter provides a list of representatives from the NRC, PNNL, Energy Harbor, and Enercon who participated in the audit.

At the conclusion of the audit, the NRC staff summarized the status of the review with PNNL, Energy Harbor and Enercon representatives during the exit meeting held on February 8, 2024.

Many of the NRCs questions identified in the audit plan or during the audit were answered through the conduct of the audit. Those that were answered but would be needed to be used in the supplemental environmental impact statement could be submitted (a) as supplement to the application, (b) as responses to requests for additional information (RAI), or (c) as responses to requests for confirmation of information.

March 14, 2024 R. Penfield 2 We are requesting Energy Harbors response to our requests within 30 days of the receipt of this letter. Although delays may occur due to competing work and shifting circumstances, responding in this timeframe will assist us to continuing to meet the milestones shared in our September 22, 2023, letter (ML23256A359).

While the NRC staff did not identify any significant environmental issues during this audit, the staff indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested via the RAI process in the future.

Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's Public Document Room staff at 800-397-4209 (or 301-415-4737) or via email at pdr.resource@nrc.gov.

If you have any questions, please contact me via email at Lance.Rakovan@nrc.gov.

Sincerely, ature:

Lance J. Rakovan Senior Environmental Project Manager Environmental Project Management Branch 1 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-440

Enclosures:

1. List of Participants
2. Perry Nuclear Plant Requests for Confirmation of Information and Additional Information
3. Perry Nuclear Plant SAMA Requests for Confirmation of Information and Additional Information cc: Listserv Signed by Rakovan, Lance on 03/14/24

R. Penfield 3

SUBJECT:

PERRY NUCLEAR POWER PLANT UNIT 1 -

SUMMARY

OF THE JANUARY-FEBRUARY 2024 ENVIRONMENTAL AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION ENVIRONMENTAL REORT (EPID NUMBER: L-2023-LNE-0002)

DATE:

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDnrl Resource RidsNrrPMPerry Resource NMSS_REFS_EPMB1 Distribution VThomas, NRR/DNRL LGibson, NRR/DNRL SKoenick, NMSS/REFS BSmith, NRR/DNRL SLee, NRR/DNRL EDickson, NRR/DRA SWall, NRR/DORL NSalgado, NRR/DORL DRoth, OGC SBurnell, HQ/OPALWilkins, OCA DMcIntyre, HQ/OPA VMitlyng, RIII/OPA ABarker, RIII/FCO JLaral, RIII/DRP SAtack RIII/DRS JSteffes, RIII, SRI JNance, RIII, RI mjbensi@energyharbor.com ADAMS Accession No.:

OFFICE PM:EPMB1:REFS LA:REFS BC:EPMB1:REFS PM:EPMB1:REFS NAME LRakovan AWalker-Smith SKoenick LRakovan DATE 03/07/2024 03/07/2024 03/14/2024 03/14/2024 OFFICE RECORD COPYMarch 14, 2024 LIST OF PARTICIPANTS PERRY NUCLEAR POWER PLANT UNIT 1 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW AUDIT

January 22 - February 8, 2024

Nuclear Regulatory Commission (NRC)

Discipline Team Members Division Management John Moses, NMSS Environmental Review Supervisor Steve Koenick, NMSS Environmental Project Manager Lance Rakovan, NMSS Environmental Project Manager Kim Conway, NMSS Environmental Project Manger Jessica Umana, NMSS Environmental Project Manger Ashley Waldron, NMSS Environmental Project Manger Karen Loomis, NMSS Environmental Project Manger Angela Sabet, NMSS Aquatic Resources Briana Arlene, NMSS Cumulative Impacts Jeff Rikhoff, NMSS Environmental Justice Caroline Hsu, NMSS Federally Protected Ecological Resources Briana Arlene, NMSS Geologic Environment Gerry Stirewalt, NMSS Historic and Cultural Resources Jean Trefethen, NMSS

Human Health Beth Alferink, NMSS Land Use and Visual Resources Caroline Hsu, NMSS Air Quality and Noise Nancy Martinez, NMSS Replacement Power Alternatives Jeff Rikhoff, NMSS Severe Accident Mitigation Alternatives Elijah Dickson, NRR

Socioeconomics Leah Parks, NMSS Jeff Rikhoff, NMSS Terminating Power Plant Operations and Beth Alferink, NMSS Decommissioning Leah Parks, NMSS Terrestrial Resources Caroline Hsu, NMSS Waste Management Beth Alferink, NMSS Leah Parks, NMSS Water Resources - Groundwater Gerry Stirewalt, NMSS Lloyd Desotell, NMSS Water Resource - Surface Water Gerry Stirewalt, NMSS Lloyd Desotell, NMSS

Enclosure 1 2

Pacific Northwest National Laboratory (PNNL)

Discipline Team Members Surface Water Rajiv Prasad Groundwater/Geologic Rebecka Bence Groundwater/Geologic Phil Meyer Historic and Cultural Resources Lindsey Renaud Ecological - Terrestrial Tracy Fuentes Ecological - Aquatic Caitlin Wessel Cumulative/Land Use/Replacement Energy Dave Goodman Environmental Justice/Socioeconomics Lin Zeng Management Team Leah Hare 3

Energy Harbor Discipline or Title Team Member Manager, License Renewal Mark Bensi Environmental Report Lead Benjamin Spiesman License Renewal Safety Technical lead Theodore Hilston Consulting Engineer, Engineering Program / License Justin Truxall Renewal Implementation Coordinator Environmental Report Consultant John Grimm Manager, Radiation Protection and Chemistry Eli Crosby Superintendent, Chemistry Randall Killing Senior Nuclear Specialist, Chemistry Alyssa Wright Supervisor, Nuclear Radwaste Dominic Magda Senior Nuclear Specialist, Chemistry Shelby Chapin Supervisor, Emergency Response Jeffrey Archer

Supervisor, Nuclear Plant Systems Engineering Marc Kuntz

Nuclear Engineer, Balance of Plant Engineering Nathaniel Kehn Supervisor, Nuclear ALARA Joseph Oelbracht Manager, Site Project Jeffrey Miranda Nuclear Engineer, Electrical and I&C Systems Robert Kruppa Engineering Consulting Engineer, Nuclear Electrical Systems Arthur Jackson Engineering

Supervisor, Nuclear Electrical Systems Engineering Christopher Paradiso

Supervisor, Nuclear Analytical Methods Kelly R. Fine Consulting Engineer, Nuclear Analytical Methods Lawrence A. Mangan Superintendent, Nuclear Electrical Maintenance Luke Vriezen Nuclear Engineer, Nuclear Analytical Methods Devin Skelton Supervisor, Nuclear Mechanical/Structural Jeremy Schudel Engineering Senior Nuclear Specialist, Site Safety Jordan Wiley 4

ENERCON

Discipline or Title Team Member

Project Manager Stacy Burgess

Environmental Licensing Manager Rachel Turney-Work

Air Quality & Noise, Environmental Justice Derek Allen Beth Baucom SAMA Neil Johnson Steve Phillippi Ricky Summitt Historic and Cultural Resources Gary Edington Human Health, Replacement Power Alternatives, Mary Hoganson Termination of Operations and Decommissioning, Waste Management Human Health, Replacement Power Alternatives, Emily Keenan Waste Management Geologic Environment, Water Resources Jennifer Meek (Groundwater and Surface Water)

Environmental Licensing Specialist Matthew Montz Aquatic Resources, Federally Protected Rajit Patankar Ecological Resources, Terrestrial Resources Cumulative Impacts, Socioeconomics Cheyenne Riggs

Air Quality & Noise, Environmental Justice Jerry Riggs

Environmental Licensing Specialist Lisa Santoro

Land Use and Visual Resources Fred Woolridge