UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 11, 2012 LICENSEE: First Energy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE APRIL 5, 2012, PERRY PUBLIC MEETING On April 5, 2012, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2011 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by licensee and the NRCs staff during the meeting are located in ADAMS (ML12086A200 and ML12094A293).

The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2011 annual assessment for Perry. The NRCs presentation was followed by a presentation provided by the Perry plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Perrys staff discussed the actions that have been accomplished, or are planning to accomplish, to mitigate the occupational radiation safety and substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.

After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

List of Meeting Attendees for the April 5, 2012, Public Meeting cc w/encl: Distribution via List Serv

NRC REGION III APRIL 5, 2012 MEETING ATTENDANCE LIST NRC Attendees:

C. Pederson, Acting Regional Administrator S. West, Director, Division of Reactor Projects J. Giessner, Chief, Branch 4, Division of Reactor Projects M. Marshfield, Perry Senior Resident Inspector T. Hartman, Perry Resident Inspector J. Nance, Perry Resident Inspector M. Phalen, Senior Health Physicist S. Shah, Reactor Engineer V. Mitlyng, Senior Public Relations Officer D. Flowers, Perry NRC Office Administrative Assistant First Energy Nuclear Operating Company Attendees:

E. Larson, Acting Site Vice-President J. Grabnar, Director of Site Operations H. Hanson Jr., Director of Performance Improvement R. Fili, Director of Engineering J. Lynch B. Swartz M. Landis S. Miller S. Gorski A. Zelaski G. Halnon J. Oelblack D. Dervay R. Pride B. Renton S. Tut D. ingmann E. Bloud J. Cash S. Thomas B. Coad K. Nesser L. Lindrose Jr.

J. Tufts J. Severino G. Honma J. Messina

J. Burnett C. Smith T. Hilston K. Yeager S. Gramoy T. Mueller M. Kuula B. Crandall K. Vanderheist P. Johnson P. Roney T. Lentz P. Boissoneauet B. Boissoneauet B. Snyder B. Blair K. Phifer J. Thomas P. McNulty Members of the Public E. Filppi, OEMA R. Leidy, ODIT M. Reinhart, News Herald L. Greene, Lake County EMA D. Davis, Green Party M. Moore, FE Service Co.

G. Rhoads, Excel Services T. Rudell, The WKSU Station NPR B. Zeitz, Mentor Marsh Board of Management D. Dillon, FE/Cleveland Electric Illuminating J. Church, Lake County EMA C. Holden A. Marshfield M. Shannon C. Kline A. Renton S. Miller J. Dickinson R. Shutt N. Henry

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 11, 2012 LICENSEE: First Energy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE APRIL 5, 2012, PERRY PUBLIC MEETING On April 5, 2012, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2011 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by licensee and the NRCs staff during the meeting are located in ADAMS (ML12086A200 and ML12094A293).

The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2011 annual assessment for Perry. The NRCs presentation was followed by a presentation provided by the Perry plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Perrys staff discussed the actions that have been accomplished, or are planning to accomplish, to mitigate the occupational radiation safety and substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.

After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

List of Meeting Attendees for the April 5, 2012, Public Meeting cc w/encl: Distribution via List Serv DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC 2012 Mtg Summary\Perry public mtg summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp JGiessner DATE 04/11/12 04/11/12 OFFICIAL RECORD COPY

Letter to First Energy Nuclear Operating Company from J. Giessner dated April 11, 2012.

SUBJECT:

SUMMARY

OF THE APRIL 5, 2012, PERRY PUBLIC MEETING DISTRIBUTION: