ML080230306

From kanterella
Jump to navigation Jump to search
Summary of Meeting with FENOC to Discuss Fleet Performance
ML080230306
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 01/22/2008
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
BELLAMY, RR
References
Download: ML080230306 (4)


Text

January 22, 2008 LICENSEE: FirstEnergy Nuclear Operating Company FACILITIES: Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants

SUBJECT:

SUMMARY

OF THE JANUARY 9, 2008, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On January 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building, Oak Harbor, Ohio. The meeting was between NRC Regions I and III, and FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML073550467 and ML080160484, respectively. A list of principal NRC and licensee meeting participants are enclosed.

The NRC began the meeting with a brief introduction, then FENOC management discussed individual plant performance, their fleet-wide approach to sustaining performance improvements, and improving site performance at the Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.

The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions and the Office of Nuclear Reactor Regulation. The meeting concluded with a discussion of plans to continue these meetings involving the NRC regions and program offices and all plants in the FENOC fleet on an annual basis.

/RA/

Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58

Enclosure:

As Stated

January 22, 2007 LICENSEE: FirstEnergy Nuclear Operating Company FACILITIES: Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants

SUBJECT:

SUMMARY

OF THE JANUARY 9, 2008, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On January 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building, Oak Harbor, Ohio. The meeting was between NRC Regions I and III, and FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML073550467 and ML080160484, respectively. A list of principal NRC and licensee meeting participants are enclosed.

The NRC began the meeting with a brief introduction, then FENOC management discussed individual plant performance, their fleet-wide approach to sustaining performance improvements, and improving site performance at the Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.

The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions and the Office of Nuclear Reactor Regulation. The meeting concluded with a discussion of plans to continue these meetings involving the NRC regions and program offices and all plants in the FENOC fleet on an annual basis. /RA/

Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58

Enclosure:

As Stated SUNSI Review Complete: _____aar______________ (Reviewers initials)

See Attached Distribution ML080230306 DOCUMENT NAME: G:\DRP\BRANCH6a\MEETING NOTICES AND SUMMARIES\FENOC MEETING

SUMMARY

JAN 2008 RI.wpd To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RI/DRP NAME Rbellamy/AAR for DATE 1 /22 /08 OFFICIAL RECORD COPY

2 Principal Meeting Participants NRC S. Collins, Regional Administrator, RI J. Caldwell, Regional Administrator, RIII J. Wiggins, Deputy Director, Office of Nuclear Reactor Regulation (NRR)

C. Pederson, Director, Division of Reactor Projects, RIII M. Kowal, Chief, Division of Reactor Licensing, NRR B. Burgess, Chief, Projects Branch, RIII R. Bellamy, Chief, Projects Branch, RI FirstEnergy Nuclear Operating Company J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President and Chief Operating Officer J. Rinckel, Vice President - Oversight D. Pace, Senior Vice President, Engineering P. Sena, Site Vice President, Beaver Valley B. Allen, Vice President, Perry cc w/encl:

J. Hagan, President and Chief Nuclear Officer, FENOC J. Lash, Senior Vice President and Chief Operating Officer, FENOC D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Corporation G. Halnon, Director, Fleet Regulatory Affairs, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering L. Freeland, Director, Site Performance Improvement C. Keller, Manager, Regulatory Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency Enclosure

Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDORLLPL1-1, RIDSNRRDORLLPL1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, Regional Administrator RI D. Roberts, RI DRS T. Taylor, RIII DRP J. Caldwell, Regional Administrator RIII K. Farrar, RI Regional Counsel D. Werkheiser, SRI - Beaver Valley M. Dapas, DRA, RI J. Heck, RIII Regional Counsel M. Franke, SRI - Perry J. Lubinski, NRR G. West, RI EDO Coordinator J. Rutkowski, SRI - Davis-Besse N. Morgan, NRR, PM R. Bellamy, RI DRP G. Matakas, RI ORA R. Guzman, NRR Backup S. Barber, RI DRP P. Buckley, RIII ORA D. Lew, RI DRP J. Robbins, RIII DRP N. McNamara, SLO J. Clifford, RI DRP P. Voss, RIII DRP PMNS M. Gamberoni, RI DRS G. Wright, RIII DRP WEBWORK Enclosure