Summary of November 9, 2016, Public Teleconference Call Regarding Upcoming Perry Nuclear Power Plant, Unit 1 License Amendment Request to Revise Technical Specifications to Support Implementation of Alternate Source Term Amendment
ML16321A005
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/21/2016
From: Kimberly Green
Plant Licensing Branch III
To:
FirstEnergy Nuclear Operating Co
Green K
References
CAC MF8502
Download: ML16321A005 (5)


Text

LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF NOVEMBER 9, 2016, PUBLIC TELECONFERENCE CALL WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING UPCOMING PERRY NUCLEAR POWER PLANT, UNIT 1 LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO SUPPORT IMPLEMENTATION OF ALTERNATE SOURCE TERM AMENDMENT (CAC NO.

MF8502)

The U.S. Nuclear Regulatory Commission (NRC) conducted a Category 1 public teleconference call with representatives of FirstEnergy Nuclear Operating Company (FENOC, the licensee) on November 9, 2016. The purpose of the call was to discuss Perry Nuclear Power Plant, Unit 1 's upcoming license amendment request (LAR) to revise certain technical specifications (TSs) in support of implementation of the alternate source term (AST) amendment that was issued in March 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15075A139). A list of attendees is enclosed.

The meeting notice can be found in ADAMS under Accession No. ML16302A035. The meeting notice is also posted on the NRC public website.

Summary of Teleconference Call:

On November 9, 2016, staff from the NRC conducted a public teleconference call with representatives from FENOC to discuss an upcoming LAR to revise certain TSs to support implementation of the AST amendment.

During the teleconference call, FENOC described the changes it plans to request for certain TSs and the basis for the changes. Below is a list the proposed changes as discussed during the call.

References to "movement of recently irradiated fuel assemblies" will be deleted from the following TSs:

o TS 3.3.6.1, "Primary Containment and Drywell Isolation Instrumentation" o

TS 3.3.7.1, "CRER System Instrumentation" o

TS 3.6.1.2, "Primary Containment Air Locks" o

TS 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)"

o TS 3.6.1.10, "Primary Containment-Shutdown" o

TS 3.6.1.11, "Containment Vacuum Breakers" o

TS 3.6.1.12, "Containment Humidity Control" o

TS 3.6.4.1, "Secondary Containment" o

TS 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)"

o TS 3.6.4.3, "Annulus Exhaust Gas Treatment (AEGT) System" o

TS 3.7.3, "Control Room Emergency Recirculation (CRER) System" o

TS 3.7.4, "Control Room Heating, Ventilating and Air Conditioning (HVAC) System" o

TS 3.8.2, "AC Sources-Shutdown" o

TS 3.8.5, "DC Sources-Shutdown" o

TS 3.8.8, "Distribution Systems-Shutdown" The following TS will be revised to increase the allowable secondary containment bypass leakage rate:

o TS 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)"

The following TSs will be revised to change the runtime requirements:

o TS 3.6.4.3, "Annulus Exhaust Gas Treatment (AEGT) System" o

TS 3.7.3, "Control Room Emergency Recirculation (CRER) System" The following TSs will be deleted because they are no longer necessary:

o TS 3.7.8, "Fuel Handling Building" o

TS 3.7.9, "Fuel Handling Building Ventilation Exhaust System" The following TS will be added (new):

o TS 3.9.10, "Decay Time" The following TS will be revised to remove references to the fuel handling building as well as to increase the relative humidity value for the charcoal adsorber:

o TS 5.5.7, "Ventilation Filter Testing Program" The NRC staff asked clarifying questions about the proposed LAR regarding whether any additional changes are being made to AST methodology, if the environmental qualification of any electrical equipment is affected, and the safety qualification and future testing of the fuel handling building ventilation exhaust system. FENOC answered the staff's questions during the teleconference call.

No regulatory decisions or commitments were made during the meeting. The public was invited to participate in the call and was given an opportunity to communicate with the NRC before the call ended. The NRC staff received no public comments and no meeting feedback forms were received.

Please direct any inquiries to me at 301-415-1627, or Kimberly.Green@nrc.gov.

Docket No. 50-440

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

~~

Kimberly Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES NOVEMBER 9. 2016, PUBLIC TELECONFERENCE CALL WITH FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING PERRY NUCLEAR POWER PLANT, UNIT 1 LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO IMPLEMENT THE ALTERNATE SOURCE Kimberly Green Ravi Grover Alex Chereskin Larry Wheeler Shavon Edmonds Jerry Bettle Diana Woodyatt Scott Krepel John Parillo Cal Heintz Stanley Gorski David Mackovjak David Olderman Matthew Engle Walter Hilbish Tom Lentz Phil Lashley TERM Affiliation U.S Nuclear Regulatory Commisssion (NRC)

NRC NRC NRC NRC NRC NRC NRC NRC FirstEnergy Nuclear Operating Company (FENOC)

FE NOC FE NOC FE NOC FE NOC FE NOC FE NOC FE NOC Enclosure

ML16321A005 OFFICE DORL/LPL3-1/PM DORL/LPL3-2/LA DORL/LPL3-1/BC DORL/LPL3-1/PM NAME KGreen SRohrer DWrona KGreen DATE 11/18/16 11/16/16 11/21/16 11/21/16