ML20054L773

From kanterella
Revision as of 04:33, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/82-11 & 50-547/82-11 on 820517-21 & Notice of Violation
ML20054L773
Person / Time
Site: Marble Hill
Issue date: 06/23/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20054L774 List:
References
NUDOCS 8207080465
Download: ML20054L773 (2)


See also: IR 05000546/1982011

Text

.

.

~

.

MUN 2 3 G82

Docket No. 50-546

Docket No. 50-547

Public Service of Indiana

ATTN: Mr. S. W. Shields

Senior Vice President

Nuclear Division

Post Office Box 190

New Washington, IN 47162

Centlemen:

This refers to the routine safety inspection conducted by Mr. P. R. Pelke

of this of fice on May 17-21, 1982, of activities at Marble Hill Nuclear

Generating Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPRP-170 and No. CPRP-171 and to the discussion of our findings with

Mr. Ramsett and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

11shed. Consistent with Section 2.790(b)(1), any such application must l

be accompanied by an affidavit executed by the owner of the information j

which identifies the document or part sought to be withheld, and which I

I

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

!

,

8207080465 820623 ,/

PDR ADOCK 05000546 i

G PDR /

l

.

.

.

Public Service of Indiana 2 June 23, 1982

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placett in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosures:

1. Appendix,

Notice of Violation

2. Inspection Reports

No. 50-546/82-11 and

No. 50-547/82-11

cc w/ encl:

W. M. Petro, Executive Director

Nuclear Project Management

'

C. Kammerer, CA

J . }{. Sniezek, D/DRRRI

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of Attorney

General

John R. Galloway, Staff Director

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley Power

Association

Thomas M. Dattilo, Save the Valley

C(bW W WY

RIII RIII RI I R II

Pelke/dm Konklin Streeter Spessard

6/8/82 G/p G/js C/fg