Category:CORRESPONDENCE-LETTERS
MONTHYEARML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20238D0201987-09-0909 September 1987 Forwards Breakdown of Analysis of Costs for Plant OL Application Reviews for 860622-1216,per 10CFR170.12(b). Invoice Will Be Sent Shortly ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237K9961987-08-17017 August 1987 Responds to Requesting re-review of OL Fee Charges Under 10CFR170 as Billed on Invoices F1385 & F1386, ,for Review Period 840624-860621.Charges Billed Applicable to Plant Cases.Supportive Fee Info Encl ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20235Q0291987-07-15015 July 1987 Advises That Cost Analyses for OL Application Reviews for 840624-860621 Completed.Breakdown of Review Costs by Program Ofc Encl.Util Will Receive Invoices for Listed Amounts ML20211P1311986-12-16016 December 1986 Advises That Encl Order Terminating CPPR-170 & CPPR-171 for Facility & Notice of Withdrawal of Application for OLs Have Been Forwarded to Ofc of Fr for Publication,Per Return of CPs by Util on 850301 ML20214R5961986-09-23023 September 1986 Responds to 860918 Request & Forwards Printout of Recent Filings in Facility Case.No Ruling Made by ASLB Since 860618 Ruling.Served on 860924 ML20214R6331986-09-22022 September 1986 Advises That Listed Individuals Served W/Author ML20214R6061986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814.Response Requested ML20214R6381986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814 ML20203E8271986-07-18018 July 1986 Informs That Recently Received Encl Ltrs Procedurally Insufficient.Requests That Provisions of Sections 2.701, 2.708,2.709 & 2.712 Re Filing & Svc of Documents Be Reviewed.Served on 860722 ML20199L0381986-07-0202 July 1986 Forwards Pleading in Response to Board Memorandum & Order Directing Briefs Be Served on 860602.Response Addresses Indiana Sassafras Audubon Soc & Save the Valley, Inc 860626 Motion ML20206S7921986-06-27027 June 1986 Further Response to FOIA Request.Boxes 16,17 & 18 Re Qa/Qc Category Described in Apps Y,Z & AA in Pdr.Listed Records Completely or Partially Withheld (Ref FOIA Exemption 5) ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20138H5461985-12-0909 December 1985 Forwards Overview of Regional Ofc & Detailed Organizational Charts for Ofc Divs Due to Recent Organizational & Staff Changes.W/O Encl ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20134A3871985-07-0303 July 1985 Further Response to FOIA Request for All Records Re Ford Amend Study.App L Documents Encl & Available in Pdr.Search Continuing ML20127P1861985-06-26026 June 1985 Forwards Insp Repts 50-546/85-01 & 50-547/85-01 on 850122-0614.No Violation Identified ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20134A8941985-06-10010 June 1985 Further Response to FOIA Request for Records Re Ford Amend Study.Records in App K Available in Pdr.Review for Addl Records Continuing ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20100G3251985-04-0404 April 1985 Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding ML20126J9081985-03-0606 March 1985 Further Response to FOIA Request That All Internal Memos to Div of Licensing from May-Nov 1984 Which Provided Draft SER, SER Sections & Questions or Requests for Addl Info Be Placed in Pdr.App C Documents Placed in PDR ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20086K1021984-01-20020 January 1984 Forwards Util 840116 Press Release Explaining Financial Reasons for Halting Facility Const.Certificate of Svc Encl ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E2891983-12-22022 December 1983 Informs That Applicant Will Require Time to Consider & Determine Response to Special Task Force of Governor of in Recommendation That Const of Facilities Be Canceled.Aslb Should Defer Further Action.Certificate of Svc Encl ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082R6411983-12-0808 December 1983 Forwards Pp 11 Omitted from 831130 Response to Sassafras Audubon Soc & Valley Watch,Inc Contentions ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20086A8591983-11-0101 November 1983 Forwards Addl Copies of Sassafras Audubon/Valley Watch 831022 Joint Suppl.Svc List Requested.W/O Encl ML20078P1541983-10-28028 October 1983 Corrects Ref on Page 10,Line 2,of 831021 Joint Suppl to Sassafras Audubon Soc & Valley Watch Petitions for Intervention in OL Hearing.Certificate of Svc Encl ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved 1987-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20214R6331986-09-22022 September 1986 Advises That Listed Individuals Served W/Author ML20214R6061986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814.Response Requested ML20214R6381986-09-18018 September 1986 Requests Confirmation Whether or Not Author on Mailing List & Whether Any Rulings Filed Since 860814 ML20199L0381986-07-0202 July 1986 Forwards Pleading in Response to Board Memorandum & Order Directing Briefs Be Served on 860602.Response Addresses Indiana Sassafras Audubon Soc & Save the Valley, Inc 860626 Motion ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20100G3251985-04-0404 April 1985 Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20086K1021984-01-20020 January 1984 Forwards Util 840116 Press Release Explaining Financial Reasons for Halting Facility Const.Certificate of Svc Encl ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E2891983-12-22022 December 1983 Informs That Applicant Will Require Time to Consider & Determine Response to Special Task Force of Governor of in Recommendation That Const of Facilities Be Canceled.Aslb Should Defer Further Action.Certificate of Svc Encl ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082R6411983-12-0808 December 1983 Forwards Pp 11 Omitted from 831130 Response to Sassafras Audubon Soc & Valley Watch,Inc Contentions ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20086A8591983-11-0101 November 1983 Forwards Addl Copies of Sassafras Audubon/Valley Watch 831022 Joint Suppl.Svc List Requested.W/O Encl ML20078P1541983-10-28028 October 1983 Corrects Ref on Page 10,Line 2,of 831021 Joint Suppl to Sassafras Audubon Soc & Valley Watch Petitions for Intervention in OL Hearing.Certificate of Svc Encl ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved ML20127C9871983-09-15015 September 1983 Forwards Updated Const Status Repts as of 830731.Info for Inclusion in NUREG-0030 ML20024F1781983-09-0202 September 1983 Requests Extension Until 840401 for Submittal of Responses to Generic Ltr 83-28,to Incorporate Efforts Underway on Generic Requirements by Westinghouse Owners Group,Nuclear Util Task Action Committee (Nutac) ML20076D3371983-08-16016 August 1983 Forwards Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Failure to Effectively Implement QA Program.Pumps Not Commercially Accepted for Installation at Plant Site ML20077J4941983-08-15015 August 1983 Informs of Change of Address.Related Correspondence ML20080B4641983-08-0101 August 1983 Forwards Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators. Mods Will Reduce Tube Vibration in Preheater Section & Do Not Result in Unreviewed Safety Question ML20024D0881983-07-29029 July 1983 Comments on Potential Impact of Plant on Aquatic Biota of Ohio River.Full Implementation of NRC Findings in Both Draft & Final EIS W/Complete Monitoring Program Recommended ML20077G7761983-07-27027 July 1983 Discusses Status of 830415 Commitments Re Suspension of Electrical Work Outlined in 830203 Confirmatory Action Ltr. Item I,Ii,Iii,Vi & VII Commitments Met.Surveillance Program for Backlog & Hanger Insp in Progress ML20077D1301983-07-25025 July 1983 Requests Correspondence Re Util Be Sent to Author Address ML20134A6191983-07-20020 July 1983 Forwards Biweekly Status Rept 3 Re Independent Const Review,Per P Keshishian Request.Biweekly Status Repts 1 & 2 Provided to G Gower During 830706-13 Site Visit.Related Info Also Encl ML20024D0221983-07-18018 July 1983 Forwards Proprietary Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & DE Steam Generators. Rept Withheld (Ref 10CFR2.790) ML20076L4911983-07-15015 July 1983 Forwards Detailed Control Room Design Review Per Requirements of Generic Ltr 82-33, Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability. Reg Guide 1.97 Implementation Rept Will Be Submitted by 831101 ML20076L3451983-07-14014 July 1983 Forwards Annual Financial Repts 1982 for Public Svc Co of Indiana,Inc & Wabash Valley Power Assoc,Inc ML20076M6691983-07-12012 July 1983 Comments on 830712 Public Meeting Re Environ Concerns for Application for Ols.Util Should Present Analyses of Environ Risks Associated W/More Severe Types of Very Low Probability Accidents in Environ Rept ML20077H4231983-07-0707 July 1983 Requests Withholding Proprietary Info in, Independent Evaluation of Proposed Mods to Westinghouse Model D4,D5 & E Steam Generators, Final Draft (Ref 10CFR2.790) ML20076L4181983-07-0606 July 1983 Informs That Completion Date for Item II of Re Cable Tray Hanger Insp Extended to 830805.Corrective Actions for Procedures & Nonconformances Created Delay 1987-08-07
[Table view] Category:UTILITY TO NRC
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20237L0261987-08-0707 August 1987 Ack Receipt of Invoices Re Plant for 840624-0721.Since All Licensing Activities Suspended in Jan 1984 & CP Surrendered on 850301,review of Charges & Issue of Credit Requested ML20141A2171986-04-0101 April 1986 Informs That QA Program Being Revised Due to Cancellation of Const Activities & in Keeping W/Intention of Investment Recovery to Reflect Organizational Structure of Investment Recovery Program ML20137Z7951985-12-0404 December 1985 Forwards Matl to Support Removal of Unqualified Instrumentation from Diesel Generator Engine & Engine Skid. Devices Added to Equipment Q-list to Ensure That Qualification Maintained ML20133D1471985-10-0202 October 1985 Notifies That Util Rescinding ASME QA Program.Certificate of Authorization N-2456 & Code N Symbol Stamp Returned to ASME ML20135H7471985-09-17017 September 1985 Requests That Date of 850924 Originally Set for NRC Site Stabilization Survey of Const Site Be Rescheduled to Late Oct or Early Nov 1985 Due to Scheduling Conflicts ML20117P5131985-05-31031 May 1985 Ack Receipt of 850412 Response to Ltr Disputing Billed Amounts by NRC for OL Reviews.Requests That Due Date for Any Final Payment Be Extended for Reasonable Period of Time to Allow Issues to Be Resolved.Fee Paid ML20116N3691985-05-0101 May 1985 Forwards Response to 850402 Request for Addl Info Re Acreage Disturbed by Project & Emergency Offsite Facility Site Layup Actions.No Addl Permits or Approvals from Other Federal, State & Local Agencies Anticipated ML20102C2331985-03-0101 March 1985 Surrenders CPs CPPR-170 & CPPR-171.All const-related Activities on Site Halted.Site Activities Conducted Per Author .Commitments Contained in Encl Site Stabilization Plan Will Govern Future Activities ML20102B7551985-02-25025 February 1985 Disputes Billing Amounts in NRC 850122 Summary Statement of Costs.Errors & Lack of Documentation Do Not Allow Acceptance of Billing Solely on Basis of NRC Internal Controls.Meeting Re Questioned Items & Extension of Due Date Requested ML20091S4501984-06-0101 June 1984 Responds to NRC Ltr Re Allegations Noted in IE Insp Repts 50-546/84-01 & 50-547/84-01.Corrective Actions:Independent Engineering Consultants Evaluation of Concrete Const Showed Concrete Good to Excellent Quality ML20080Q9121984-01-18018 January 1984 Notifies of Suspension of Const.Site Work Force Reduced to Less than 1,000.Action Taken Due to Inability to Finance Project.Nrc Should Issue Draft SER as Is,So Benchmark Exists for Licensing Review Process ML20079N4611984-01-11011 January 1984 Responds to NRC Re IE Insp Repts 50-546/83-20 & 50-547/83-21.Const Suspended.Insp Repts & Notice of Violation Will Be Placed W/Util Records of Nonconforming Conditions to Be Addressed When Const Resumed ML20083E0501983-12-21021 December 1983 Forwards Revised Affidavit Requesting That Matl Transmitted to NRC in Response to Question 470.7 of NRC Environ Rept - OL Stage Be Withheld Per 10CFR2.790.Revised Affidavit Submitted in Response to NRC 831125 Request ML20083H6691983-12-14014 December 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-19 & 50-547/83-20.Corrective Actions:Sys Developed to Identify Matls Requiring Periodic Maint & Storage Procedures Revised to Identify Sys ML20082M9481983-12-0202 December 1983 Forwards Amend 30 to FSAR & Suppl 4 to Environ Rept - OL Stage (Filed in PDR Category C).Affidavit of Distribution Encl ML20082M8251983-11-30030 November 1983 Requests Extension Until 840301 for Response to Byron Integrated Design Insp Rept ML20082D2131983-11-14014 November 1983 Responds to IE Bulletin 83-06,Nonconforming Matls Supplied by Tube-Line Corp.... Requests Submittal Extension Until 840331 to Respond to Permit Adequate Review & Evaluation of Vendor Info ML20081K6081983-11-0707 November 1983 Forwards,For Review,Util Response to Generic Ltr 82-33 Re Reg Guide 1.97 Planned Improvement Rept on Instrumentation for light-water-cooled Power Plants to Assess Plant Environs Following Accident ML20085L3131983-10-11011 October 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-15 & 50-547/83-15.Corrective Actions: Directive Will Be Issued to Pullman Const Industries Emphasizing Resposibility for Reporting Nonconformances ML20080N2841983-09-30030 September 1983 Forwards Status of Outstanding Third Quarter 1983 Commitments in Amends to Fsar.Description of Containment Hydrogen Monitoriing Sys Will Be Submitted During First Quarter 1984 ML20080J0201983-09-23023 September 1983 Forwards Changes to Safeguards Vol & Responses to NRC Requests for Addl Info,Included in Amend 28 to OL Application.Changes Withheld (Ref 10CFR73.21) ML20080J0531983-09-21021 September 1983 Forwards Responses to 830824 Requests for Addl Info Re Fsar. Requests Which Pertain to Byron FSAR Not Addressed.Responses Will Be Included in Dec Amend ML20080G2731983-09-16016 September 1983 Discusses Feasibility & Benefits to Util of Eliminating Postulated Pipe Breaks in RCS Primary Loop from Structural Design Basis,Per NRC .Approx 200,000 Manhours of Installation Time Per Unit Will Be Saved ML20127C9871983-09-15015 September 1983 Forwards Updated Const Status Repts as of 830731.Info for Inclusion in NUREG-0030 ML20024F1781983-09-0202 September 1983 Requests Extension Until 840401 for Submittal of Responses to Generic Ltr 83-28,to Incorporate Efforts Underway on Generic Requirements by Westinghouse Owners Group,Nuclear Util Task Action Committee (Nutac) ML20076D3371983-08-16016 August 1983 Forwards Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Failure to Effectively Implement QA Program.Pumps Not Commercially Accepted for Installation at Plant Site ML20080B4641983-08-0101 August 1983 Forwards Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators. Mods Will Reduce Tube Vibration in Preheater Section & Do Not Result in Unreviewed Safety Question ML20077G7761983-07-27027 July 1983 Discusses Status of 830415 Commitments Re Suspension of Electrical Work Outlined in 830203 Confirmatory Action Ltr. Item I,Ii,Iii,Vi & VII Commitments Met.Surveillance Program for Backlog & Hanger Insp in Progress ML20024D0221983-07-18018 July 1983 Forwards Proprietary Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & DE Steam Generators. Rept Withheld (Ref 10CFR2.790) ML20076L4911983-07-15015 July 1983 Forwards Detailed Control Room Design Review Per Requirements of Generic Ltr 82-33, Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability. Reg Guide 1.97 Implementation Rept Will Be Submitted by 831101 ML20076L3451983-07-14014 July 1983 Forwards Annual Financial Repts 1982 for Public Svc Co of Indiana,Inc & Wabash Valley Power Assoc,Inc ML20076L4181983-07-0606 July 1983 Informs That Completion Date for Item II of Re Cable Tray Hanger Insp Extended to 830805.Corrective Actions for Procedures & Nonconformances Created Delay ML20076L4951983-07-0101 July 1983 Requests Assignment of Inspector,Beginning 830707,to Verify Adequacy of Program for Improved Control Over Electrical Cable Tray Installation ML20115A6261983-06-15015 June 1983 Forwards Updated Const Status Repts as of 830430 for Inclusion in NUREG-0030,per 830314 Submittal ML20076J5501983-06-10010 June 1983 Requests Assignment of Inspector to Verify Program for Improved Control Over Electrical Const Program Beginning 830613,per Meeting Prerequisites Outlined in 830202 Confirmatory Action Ltr ML20024E6281983-06-0909 June 1983 Forwards Revised QA Program Reflecting Organizational Changes & Clarifications Since 800428 Version ML20072B8681983-06-0909 June 1983 Forwards Schedular Commitments for Submittal of Environ Qualification Program,In Response to Questions M270.2 & M270.3,per 830510 Request for Addl Info Re Environ Qualification of Electrical & Mechanical Equipment ML20023D8371983-05-31031 May 1983 Forwards Audit of Jul 1982 Cost Estimate for Marble Hill Nuclear Project, in Support of Util Petition to Increase Existing Rates & Changes for Retail Electric Svc & for Approval of New Rate Schedules,Rules & Regulations ML20071N6461983-05-24024 May 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-546/83-01 & 50-547/83-01.Corrective Actions:Cable Tray to Hanger Attachments & Cable Tray Splice Plate Bolting Identified as safety-related on Design Drawings ML20071J3131983-05-18018 May 1983 Advises of 830527 Prompt Notification Sys Development Meeting in Clarksville,In to Discuss Objectives & Design of Emergency Planning Zone ML20023D2541983-05-16016 May 1983 Forwards Amend 25 to CP & OL Applications,Including Revs to Security Plan.Amend Withheld (Ref 10CFR2.790) ML20074A5021983-05-0909 May 1983 Forwards Response to Generic Ltr 83-10C Re Resolution of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Response to Items I.1e,I.3a & I.3c Will Be Addressed in Fsar,App E,Scheduled for Submittal by 840331 ML20073K1521983-04-15015 April 1983 Forwards Response to Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability ML20074A2911983-04-15015 April 1983 Confirms 830414 Commitment Re Electrical Cable Tray Hanger Installation Under Conditions Outlined in 830203 Confirmatory Action Ltr.Request to Restart Installation of Hangers Renewed ML20071N6601983-04-0808 April 1983 Requests Inspector Verification That Program for Improved Control Over Electrical Const Adequate Per 830202 Confirmatory Action Ltr,Items 2-6 Re Electrical Cable Tray Hanger Installation ML20069G6081983-03-23023 March 1983 Advises That Response to Generic Ltr 83-10c Re Resolution of TMI Action Item II.K.3.5 Will Be Provided within Specified 60-day Timeframe.Responses to Items I.1e,I.3a & I.3c Will Be Submitted in Amend to App E,Section E.52 of FSAR by 840331 ML20069F0191983-03-15015 March 1983 Forwards Summary of Feb 1983 Organizational Changes,Per Commitment to Notify of Changes Altering Organizations Described in Consolidated Description of QA Program ML20127D3491983-03-14014 March 1983 Forwards Updated Const Status Repts as of 830130.Info for Inclusion in NUREG-0030 ML20071G1131983-03-10010 March 1983 Ack Receipt of Ltr Requesting Cost Analysis of Backfitting Requirements Imposed by Nrc.Facilities Will Require Some Backfit Mods.Costs Will Be Almost Identical to Byron Increases 1987-08-07
[Table view] |
Text
.
-. =
PUBLIC SERVICE INDIANA S. W. Shields September 21, 1983 Senior Vice President -
SVP-0128-83 Nuclear Division j
Mr. Harold R. Denton Docket Nos.:
STN 50-546 Office of Nuclear Reactor Regulation STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.:
Washington, D.C.
20555 CPPR - 170 CPPR - 171 E
Marble Hill Nuclear Generating Station - Units 1 and 2 Application for Licenses a
NRC Request for Additional Information
Dear Mr. Denton:
On August 24, 1983, the NRC submitted to Public Service Company of Indiana, Inc. (PSI) requests for additional information to complete its evaluation of the PSI and Wabash Valley Power Association, Inc. (WVPA) application i
for an operating license for the Marble Hill Nuclear Generating Station.
A review of these questions has been made.
Several of the questions pertain to sections of the FSAR that are replicate of the Byron FSAR or are similar to Byron FSAR questions. These areas of the FSAR should have been reviewed
.for Byron's license application and, therefore, by the rules of replication, should not be readdressed in the Marble Hill Nuclear Generating Station's application. Advanced copies of the responses to these questions are being provided at this time..These responses will be included in the December amendment. One (1) signed original and fifteen (15) copies of this letter and attachments are provided for your use.
If you have any questions, please contact me at your convenience.
PUBLIC SERVICE COMPANY OF INDIANA, INC. for itself and as agent for WABASH VALLEY POWER ASSOCIATION, INC.
1
,/
% /
/
S.'W.
Shields 8309260141 830921 Seni r Vice President-PDR ADOCK 05000546 Nuclear Division A
PDR SWS/ GAS /bak
\\
Enclosure I I 4
P. O. Box 190, New Washington, Indiana 47162 812. 289.3000
PUBUC SERVICE INDIANA Letter:
H. R. Denton September 21, 1983 SVP-0128-83 cc:
J. F. Schapker (w/o enc)
D. G. Eisenhut (w/o enc)
T. M. Novak (w/o enc)
B. J. Youngblood (w/o enc)
P. W. O'Connor (w/o enc)
I MH 1&2-FSAR QUESTION M220.1 The spent fuel pool concrete structure, listed in Table 3.2-1,should also y
be included in FSAR. Section 3.8.4 and the information regarding its design and construction provided.
RESPONSE
Although not explicitly listed, the design and construction of the replicate spent fuel pool structure is provided in subsections 3.8.4.4, 3.8.5.1.2 and applicable criteria for a seismic Category I structure.
Additional information can be provided during the structural design audit.
The Byron SER (NUREG-0876) subsection 3.8.3 concludes that "..... the design of safety-related structures other than the containment is acceptable....."
1 i
l If. Marble Hill Nuclear Generating Station Units 1 and 2, Final Safety Analysis Report.
i i
QM 220.1-1 1
MH 1&2-FSAR QUESTION M220.2 The descriptive information of the internal structures is not in (3.8.3) accordance with the provisions of R. G. 1.70, " Standard Format....."
Provide sufficient information, illustrated by sketches, in FSAR Section 3.8.3, to allow the staff to i trform a meaningful review of internal structures of the containment.
Reference to Sections 1.2 and 3.9 of the FSAR is not acceptable since the sketches in Section 1.2 provide only general outline of the plant.
Description of the structural aspects of the internal structures should be included in FSAR Section 3.8.3.
RESPONSE
The response to this question is provided in replicate Byron Question Q130.42. This information is also provided in the structural design
-audit.
The Byron SER (NUREG-0876) Subsection 3.8.3 concluded that "
the design of the containment internal structures is acceptable...."
t i
I l
l l
l l
l QM 220.2-1 l
l MH 1&2-FSAR QUESTION M220.3 The descriptive information of Category I structures other than containment is not in accordance with the provisions of the R. G. 1.70.
Provide sufficient information, illustrated by sketches in the FSAR Section 3.8.4 to enable the staff to perform a meaningful review. Referencing the FSAR Section 1.2 which illustrates the general i
layout of the plant is insufficient in detail for a structural review.
t
RESPONSE
The response to this question is provided in replicate Byron Question Q130.43. The Byron SER (NUREG-0876) subsection 3.8.3 concludes that
"..... the design of safety-related structures other than the containment is acceptable....."
I I
J QM 220.3-1 I
~
F01 1&2-FSAR QUESTION M220.6 Indicate if an investigation has been made to ensure that inclusion of additional masses of degrees of freedom would not result in more than ten percent increase in responses. Alternately, the number of degrees of freedom may be taken equal to twice the number of modes with frequencies less than 33 cps.
RESPONSE
The criteria used to ensure an adequate number of masses or degrees of freedom is described in Byron replicate Questions Q130.8 and Q130.20.
The Byron SER (NUREG-0876) subsection 3.7.2 concludes that "..... the plant design is acceptable....."
i f
QM 220.6-1 L
MH 1&2-FSAR 1
QUESTION M220.8 Provide the specific mass and frecuency ratios, and the criteria used for decoupling subsystems from the primary systems or structures.
Demonstrate quantitatively that these criteria are comparable to those contained in the SRP, Section 3.7.2.3 and/or justify and assess the impact of any deviation therefrom.
i
RESPONSE
The response to this question is provided in Byron replicate Question Q130.7 and Q130.19. The Byron SER (NUREG-0876) subsection 3.7.2 concludes that ".....the plant design is acceptable....." A compliance analysis is provided in Appendix F page F 3.7.2-1.
l 4
l I
e 4
c t
QM 220.8-1
MH 1&2-FSAR QUESTION M220.9 Describe the method used to determine overturning moments of Category I structures.
It is the staff's position that determination of the design moment for overturning should incorporate the following:
(a) three components of motion (b) conservative consideration of vertical and lateral seismic forces Indicate if the method of computation of design overturning moments complies with the above position.
RESPONSE
Discussions on overturning moments of Category I structures are provided in replicate subsections 3.8.5.3, 3.8.5.5.2.1 and Byron Question Q130.46.
The Byron SER (NUREG-087C,.;5section 3.8.4 concludes that "..... the design of the seismic Category I foundations is acceptable....."
i i
i l
l l
QM 220.9-1
MH 1&2-FSAR l
4 QUESTION M220.10 In Section 3.7.2.10 of the FSAR you stated that "..... each individual floor framing beam of the building was designed statically for 1.5 times
[
the acceleration value corresponding to the fundamental frequency of the 1
beam from the applicable wall response spectrum". The staff's position (see SRP Section 3.7.2.II,.1.a) is that to obtain an equivalent static load of a structure, equipment or component, which can be represented by a simple model, a factor of 1.5 applied to the peak acceleration of the j
applicable floor response apectra should be used. Justify this apparent deviation from the SRP and assess its impact on the results of the analysis.
i
RESPONSE
The response to this replicate question is provided in Byron Question Q130.29. The Byron SFR (NUREG-0876) subsection 3.7.2 concluded that
"..... the plant design is acceptable....."
d N
i l
l 4
QM 220.10-1
\\
1 MH 1&2-FSAR QUESTION M220.13 The information regarding the following Category I structures has not been provided in accordance with the Regulatory Guide 1.70, Rev. 3
" Standard Format......"
1)
Tunnel which connects the refueling water storage tank with the auxiliary building 2)
Main steam and auxiliary feedwater tunnel 3)
Electrical ducts 4)
Category I manholes Provide the information, on the above items, with regard to their location, basic dimensions, and reinforcing.
RESPONSE
The information requested is not in accordance with the preparation guideline of the replicate Marble Hill FSAR. The base plant FSAR was written to Regulatory Guide 1.70, Rev. 2, " Standard Format....." In turn, replicate sectionc of the Marble Hill FSAR were reviewed and written to R.G. 1.70, Rev. 2.
Information on item "1)" can be found in replicate subsection 3.8.4.1.3 and Figure 1.2-11; "2)" refer to replicate subsection 3.8.4.1.4 and Figures 1.2-6 & 1.2-7-; "3)" is replicated in subsection 3.8.4.1.5.;
"4)" the Marble Hill.esponse is found in Marble Hill Question QM 220.14.
From this information, the Byron SER (NUREG-0876) subsection 3.8.3 concluded that "..... the design of safety-related structures other than containment is acceptable....."
QM 220.13-1
MH 1&2-FSAR QUESTION M420.2 Discuss in detail the design of the bypassed and inoperable status indication using detailed schematics.
Include the following information in the discussion:
1.
Compliance with the recommendations of R. G. 1.47.
2.
The design philosophy used in the selection of equipment / systems to be monitored including auxiliary and support systems.
3.
How the design of the bypassed and inoperable status indication systems comply with positions B1 through B6 of ICSB Branch Technical Position 21, and 4.
The list of system automatic and manual bypasses as it pertains to the recommendations of R. G. 1.47.
5.
Discuss hardware features employed to provide a consolidated, human factored display of the bypassed and inoperable status of ESF equipment (R.G. 1.47).
RESPONSE
Compliance with Regulatory Guide 1.47 is provided in replicate section A1.47.
Other replicate text referenced include subsections 7.1.2.10, 7.5, 8.1.9 and replicate Byron Question Q31.15.
From this information the Byron SER(NUREG-0876) subsection 7.5.2.1 concluded the ".....
bypass / inoperable system meets the requirement of Regulatory Guide 1.47.
On this basis, the' staff concludes the system is acceptable."
QM 420.2-1
MH 1&2-FSAR QUESTION M440.5 FSAR Page F15.2.8-2 indicates that the plant has not formally met acceptance criterion b on SRP page 15.2.8-4, which is that in "feedwater system pipe break events..... the assumptions as to whether offs,ite power is lost and the time of loss should be made conservatively. Offsite power may be lost simultaneously with the occurrence of the pipe break, the loss may occur during the accident, or offsite power may not be lost. A study should be made to determine the most conservative assumption appropriate to the plant design being reviewed. The study should take account of the p
effects that loss of offsite power (LOOP) has on reactor coolant and main feedwater pump trips and on the initiation of auxiliary feedwater, and the resulting modification of the sequence of events."
Page F15.2.8-2 says "the FSAR reports only two cases, one for LOOP at the beginning of the transient and the other without LOOP (but) the two cases presented bound the analysis." How does the applicant support its statement that the two cases bound the analysis?
RESPONSE
Subsection 15.2.8 of the FSAR discusses the feedwater system pipe break accident. The analysis of the effects and consequences of this accident are presented in Subsection 15.2.8.2.
The Byron SER (NUREG-0876) contains no open items, confirmatory issues or license conditions concerning the feedwater line rupture.
QM 440.5-1
MH 1&2-FSAR QUESTION M440.6 SRP Section 15.4.4 deals with startup of an inactive loop or recirculation loop at an incorrect temperature. FSAR page F15.4.4-1 states that "at the end of the transient, when the shutdown margin is low,
' credit is taken for operator action but not (for) the protection system..... Having adequate operator action time to mitigate this transient obviates the necessity for automatic mitigation."
The distinction between the " start" and the 'end" of the transient is not evident in FSAR section 15.4.4.
Please provide a chronological description of the transient which shows when and how the protection system functions automatically and when and how credit is taken for operator action. Also, please state what operator actions are needed and whether (further) automatic mitigation would still take place after these operator actions. Additionally, please explain what is meant by the statement that "at the end of the transient..... the shutdown margin is low."
RESPONSE
The discussion on the startup of an inactive loop is contained in Subsection 15.4.4.
The Byron SER (NUREG-0876) contains no open items, confirmatory issues or license conditions on these issues.
QM 440.6-1 4
^
1
'N 9
t i,.
t g
{i i
%2~
t
~'.c MH 1&2-FSAR
. g ',
g
'QUESTI0h M440.7 s
SRP Section 15.4.6, " Chemical and Volume Control System Malfunction that.
Results in a Decreaso in Boron Concentration in the Reactor Coolant
'(PWR),"is under review as a' result of the V. C. Summer boron dilution event,'as described in the enclosed " Clarification of Review Areas and Affected Branches, SRP 15.4.6."
Some information that must now be reviewed is not inclEded in FSAR Section 15.4.6.
Please provide the missing information, including for example the proposed alarm setpoints, the technique for resetting an alarm setpoint, analyses assumptions regarding control. rod lic'sition..... (relative to the clarification),
and alarm times.
Enclosure:
Memo frou B. W. Sheron et al, April 12, 1983: " Inadvertent Boron Dilution Events," with attache'd " clarification" cited in Q211.7.
o.
t..
RESP 0bGE The discussion on the Chemical and Volume control system malfunction is contained in Subsection 15.4.6.
The Byron SER (NUREG-0876) contains no open items, confirmatory issues or license conditions concerning boron dilution.
]%
i, v: :
? 4}:
h
'f
.w
.i,-
k 1
sc 1
y
+
z '- :.,
q f, # :,"
s
'_y/
k.. ~
'. f[e h
QM 440.7-1 k
d Fm 162-FSAR QUESTION M440.9 FSAR Section 15.6.3, SGTR, page 15.6-12, paragraph a, indicates that no steam and fission product activities are released from the defective steam generator after thirty minutes. However, FSAR page Q212.154-5, September 1982, sentence 1, indicates that a single failure could make an atmospheric dump valve (ADV) inoperable. For SGTR, please identify the impact of a stuck open ADV on the entire accident sequence and on its radiological consequences.
RESPONSE
The consequences of a steam generator tube rupture accident are presented in Subsection 15.6.3.3.
The Byron SER (NUREG-0876) contains no open items, confirmatory issues or license conditions on this issue.
QM 440.9-1
~
MH 1&2-FSAR QUESTION M440.10 Q211.154 and Q212.47 concerned Branch Technical Position RSB 5-1,
" Design requirements of the residual heat removal system." The Byron response in FSAR Amendment 39, September 1982, page Q212.154-7, says "For some unexplained reason after reaching zero load hot standby conditions, the normal and excess letdown lines are lost. The operator must then proceed to cold shutdown via either of two methods. In the first method, all RCS depressurizations are accomplished by spraying into the pressurizer from the CVCS auxiliary spray connection.....
Initially, independent of the method use to reach cold shutdown, 4 wt.% boric acid storage tanks will be used to fill the nressurizer liquid level from 25% of span to 95% of span while the plant is held at zero load hot standby conditions. This will provide sufficient boron to compensate for xenon decay at hot standby."
Please show that the 4 wt.% boric acid in the pressurizer is transferred into the reactor core region in a timely manner so as to compensate for xenon decay at hot standby and so as to compensate for reactivity changes during subsequent cooldown. Also, please show that the entire transfer of boric acid, from the boric acid tanks into the reactor core, can be done using only safety-grade equipment and satisfying the criteria of RSB 5-1 (as included in Q212.47).
If this cannot be done, please provide a table identifying the non-safety grade equipment which must be used and identifying all violations of the criteria of RSB 5-1 and then justify all entries. Additionally, please identify the conditions under which the boric acid spray could violate the temperature differential limit between the spray and the pressurizer or could clog the pressurizer.
RESPONSE
The Chemical and Volume Control System is discussed in Subsection 9.3.4.
The Byron SER (NUREG-0876) centains no open items, confirmatory issues or license conditions on this system.
QM 440.10-1