MUN 2 3 G82
Docket No. 50-546
Docket No. 50-547
Public Service of Indiana
ATTN:
Mr. S. W. Shields
Senior Vice President
Nuclear Division
Post Office Box 190
New Washington, IN 47162
Centlemen:
This refers to the routine safety inspection conducted by Mr. P. R. Pelke
of this of fice on May 17-21, 1982, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPRP-170 and No. CPRP-171 and to the discussion of our findings with
Mr. Ramsett and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
11shed. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
j
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
,
8207080465 820623
,/
PDR ADOCK 05000546
i
G
/
l
.
.
.
Public Service of Indiana
2
June 23, 1982
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placett in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix,
2.
Inspection Reports
No. 50-546/82-11 and
No. 50-547/82-11
cc w/ encl:
W. M. Petro, Executive Director
Nuclear Project Management
'
C. Kammerer, CA
J . }{. Sniezek, D/DRRRI
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of Attorney
General
John R. Galloway, Staff Director
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley Power
Association
Thomas M. Dattilo, Save the Valley
C(bW
W
WY
RIII
RIII
RI I
R II
Pelke/dm
Konklin
Streeter Spessard
6/8/82
G/p
G/js
C/fg