ML20100G325

From kanterella
Jump to navigation Jump to search
Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding
ML20100G325
Person / Time
Site: Marble Hill
Issue date: 04/04/1985
From: Voight H, Voigt H
LEBOEUF, LAMB, LEIBY & MACRAE, PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Linenberger G, Paris O, Smith I
Atomic Safety and Licensing Board Panel
References
CON-#285-387 OL, NUDOCS 8504080208
Download: ML20100G325 (5)


Text

in T/*

  • D. FYe.[

L EBO EU F, L A M B, L El BY & M A_c R AE l e l A na TNansMin .NcLuciNe amo' rssioNAL connonaTioNe((

1333 NEW HAMPSHIRE AVENUE, N.W.

csa =AoisoN AvcNuc WASHINGTON,DC 20038 bYR -5 All :38 ' a " ' '= " a = "

BoMON, MA 02fo9 Nw vOnn,Nyiocat

<aca)4s7 rsoo 4 -

ioco acA.Ns suitoiNo vetex,44ca74 retecopien: aOaggs42 gg 2 8 ' ELev',',',' ,", " ' " "^"

ase sout" "^'"

00CKEim ' SER'llCL "^*">"*"""

tALT LAnt civv,ut a4eos ggj,NCH eBo STATE STnEET 4si prouot AvrNur Le sotur. LAus. Leser a mui nat tunt cautNeont.cf ca oo 4r sanneker souant LONDON Wim SOS, ENGLAND NOWPFEUEnnlNS & nELU sos NonTH uNtoN AVENUE eN2 tweancADEnO CENTEn P.O. sox SSS

~ c ANrono, N.J. 07018 san anANcisco.cA e4.se April 4, 1985 I

Ivan W. Smith, Esq. Mr. Gustave A. Linenberger l Chairman Atomic Safety and Licensing i Atomic Safety and Licensing Board Board, U.S. Nuclear Regulatory

~

Dr. Oscar H. Paris Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sirs:

I enclose copies of 1) a March 1, 1985 letter from i

Mr. S. W. Shields to Mr. Harold R. Denton, with attachments, (

and 2) a Motion to Terminate Proceeding.

As indicated in the attached Certificate of Service, copies of this letter and its enclosures have been sent to all l parties.

1 Sincerely, I N

Harry H. Voigt Attorney for Applicants Enclosures 8504000208 850404 PDR 0

ADOCK 05000546 %1 PDR c 0'

\ l r

~

ffyE  ?.

p.:

.a w .

^

m PUBLIC -

1 SERVICE INDIANA o lER -5 A11 :38 March 1, 1985 S. W. Shields Senior Vice President -

GFFIC' ~ # "s SEf<vict'00CK 3RMlCH Nuclear Division Mr. Harold R. Denton, Director Docket Nos.. SIN .546__,

Office of Nuclear Reactor Regulation STN-547 U.S. Nuclear Regulatory & = iasion Construction Permit Nos.:

Washington, D.C. 20555 CPPR-170 CPPR-171 SUBJECI: Marble Hill Nuclear Generating Station, Units 1 and 2

Dear Mr. Denton:

Public Service Company.of kndiana, Inc. (PSI) hereby suu.arters Construction Permit Nos. CPPR-170 and 171 for the Marble Hill Nuclear Generating Station, thits 1 and 2. All construction-related activities at the site have been halted. Site activities have been conducted -

in =,mrdance with my letter to you of January 18, 1984. 'Ihe attachment provides a 9===ry of those activities PSI will conduct to stabilize the site.

'Ihe commitments contained in the attached stabilization plan will govern future activities.

If you have any questions, please call.

Sincerely, af <

/ l/ ah

/ .

/

. Attachment cc: J. G. Keppler J.-E. Konklin J. F. Schapker P. W. O'Connor bec: M. C. Lyle H. A. Barker J. U. Bott D. V. Menscer J. R. Pope J. D. Noland M. E. Newlin G. L. Raley D. J. Hughel J. P. Edwards P. O. Box 190, New Wasnington, inuianu *+i e ut u it . 289.1000

O t

y%Crc:

'85 IPR -5 A11 :38 CFFICE r^ sicggyggy 00CKETuiu r sEgyqcy-BRAttCH SI'IE STABILIZATION PIAN ..,

,~ '

FOR MPGBIE HIIL NUCLEAR GCNE: RATING STATION, UNITS 1 AND 2 Public Service Company of Indiana, Inc.

March 1985 e

e e

D 9

i l

.. . -- -- -- - ^ " ~

_ _ _ _ _ _ 1 _. ~ ~ - ~ ' -

, 1.0 Introduction On March 1,1985, Public Service Ocmipany of Indiana, Inc. (PSI) sur-renders the construction permit for its Marble Hill Nuclear Generating

. Station, Units 1 and 2. This Site Stabilization Plan provides a sum-mary of activities PSI plans to conduct with respect to Marble Hill.

2.0 Permits Several activities associated with the Marble Hill Nuclear Generating

  • Station are conducted under the permits issued by other regulatory agencies. PSI is in the process of discussing with these regulatory agencies the need to retain, modify, and/or renew those aspects of the i permits which relate to the cancelled nuclear units.

PSI's U.S. NRC By-Product Materials License (#13-15544-03) will be maintained until the licensed sources are sold or otherwise remved from the site.

I 3.0 Stabilization Activities i

3.1 Environmental Monitorina/ Redressing The Marble Hill site consists of approximately 960 acres of which approximately 440 acres have been disturb;.3 by construction ,

activities. Denuded areas will be graded for proper drainage, if

) necessary, and grass cover established to control erosion. Paved and graveled areas may be left as is.

The site sedimentation pond will be retained and used to collect and treat runoff for the duration of site stabilization. NPDES permit limitations for this discharge point will remain in effect at this time.

Spill Prevention, Control & Countermeasures (SPCI:) activities and inspections will continue to be conducted. Appropriate changes to the SPCI: Plan have been made to reflect project termination.

All terrestrial monitoring programs have been terminated. The meteorological towers and associated equipment will remain in an inoperative mode at this time. i 1

i 3.2 Structures & Equipment

}' Plant structures may be left in place in essentially their pres-ent condition. Barriers, fencing, or manned security will be established to deter unauthorized entry and to limit conditions that could constitute a hazard to PSI employees or the public.

_ ~_ m

'N 3.3 Sectifitv .-

1 1

A ana11 security force is currently being maintained .to prevent I unauthorized access to the site. However, this measure may be discontinued at a'later date consistent with non-radiological I safety at the site.-

)

i 4.0 Future Use of Site No decision has been made as to the future use of the Marble Hill site. At this time, the real estate will be retained. Existing '..an-smission and distribution facilities will continue to be utilized.

o l

4

, _ _~_ _ .._ . _. _.-