ML20132C652
| ML20132C652 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Marble Hill |
| Issue date: | 06/25/1981 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Snyder G HOUSE OF REP. |
| Shared Package | |
| ML20132B505 | List:
|
| References | |
| FOIA-84-293 NUDOCS 8108170195 | |
| Download: ML20132C652 (8) | |
Text
1 23 M
Eb)
IE FILE COPY 30 cN c.A-N C' g-p y..
Sy&fSyg 50
/
~ ~ d');s JUN 2 51331 e
' w Wi i
fA Q
W, -
'...T,(. -.
}
The Honorable Gene M. Snyder D
'... O a.3317.- $
United States House of Representatives Q ua,mu :.m.m cum Washington, DC 20515 g
.(p$/
Dear Congressman Snyder-
/Ch I am pleased to respond to your letter dated May 22, 1981 in which you for-
~
warded a letter from one of your constituents concerning resumption of con-crete work at the Marble Hill Nuclear Power Station construction site.
I can assure you that the decision to authorize concrete placement was made only after a thorough review of the improvements made i.n the construction quality assurance program and after verification of the structural adequacy of the existing concrete.
The verification program consisted of extensive testing and examination of the concrete by Public Service of Indiana and its consultants, review of test findings made during the actual concrete placement, and a review of previous NRC inspection findings.
tion from Save the Vallay, an area environmental group, that outside con-In addit sultants review the concrete work to provide additional assurance to area residents.
NRC retained two civil engineering experts, Alfred Parme and Rolland Hamm, to review the work.
In addition, Save the Valley's consultant, Professor Michael Cassaro, was permitted to accompany the NRC consultants and to have access to the same information as the consultants. It was never the intent that the decision on resumption of concrete work would depend on submittal of a final report from the two NRC consultants. NRC planned to, and in fact did confer with the NRC consultants prior to permitting resumption of safety related concrete work.
the existing concrete was structurally sound.The consultants verbally reported This finding will be documented in a final report, which will also include a review of the repairs of surface defects that could not be undertaken until work resumed at the site.
Professor Cassaro questioned the adequacy of one portion of the construction verification program, the " ultrasonic" testing of sample areas of concrete.
His view is that the number of sample areas did not meet the NRC's previously established statistical criteria for the testing.
Our review of the testing program, however, determined that the sample testing did meet the criteria and was sufficient to determine that there are no significant internal defects in the concrete.
of concrete were cut out of various locations in the plant and tested.In The test results further confirmed the adequacy of the concrete.
In conclusion, : can assure you that the U.S. Nuclear Regulatory Commission is most concerned that the Marble Hill clant be built in accordance with the k
appropriate standards and ations.
When significan lems were found 6
MgroWMk T.L6tD6LY")(V Y*' ~'W
'l I~
f q?g K f
'1 CF
~-
s.
The Honorable Gene M Snyder with the utility's construction and quality assurance programs in 1979, we did not hesitate to stop all safety-related construction work.
Only after major revamping of the construction management and quality assurance systems was some work permitted to resume in December 1980, and concrete work was not permitted to resume until March 1981, 19 months after work was stopped.
It is not correct, as your constituent suggests, that NRC failed to keep its word on the resumption of concrete work.
The views of the consultants were to be one portion of the information assessed in permitting work to resume, but it was not expected that the consultants' final report would be a prerequisite to making the decision.
The decision to permit resumption of concrete work at Marble Hill was made only after extensive inspection of work at the site and review and evaluation of the upgraded management and quality assurance programs, as well as soliciting the findings of the consultants.
When the consultants' report is completed, within about one month, it will be publicly available. NRC documents on Marble Hill are available for inspection and copying at the Madison-Jefferson County Public Library in Madison, Indiana.
Included in the documents available are Professor Cassaro's letters to NRC on the sampling program and NRC's replies.
I trust this information satisfies your concerns and those of your constituents.
Sincerely ~,
(Q::e1)Wiii r.J. Dircks William J. Dircks Executive Director for Operations Distribution:
HK Shapar, ELD IE Reading VStello, IE Central Files RCDeYoung, IE RPS Files LNUnderwood, MPA RRRI Files JHSniezek, IE SECY-81-0739 TLHarpster, IE
'jk j
'/
EDO 10519 4
.T.
I Beth Matosko, IE S u m v c... cen w;[rea,r.e.
(H11-246-H07) 4 i
r j
WPU:JD RPS:RRRI:IE PS:RRRI:IE RPRIB:RRRI:IE '0}8R :IE E.
1 6/18/81 PFMcKeen EB81ackwood4 TLHarpstert JHSiriezek P'
MCKEE(A) 6/ /81 6/ /81 6/ /81 6/I /81 6/f?/81 i
V 1
9 DDQE-b EDO Nh RCDpYoung lo WJDircks 6/ /81
/81 6/M/81
P
\\
'The Honorable Gene M Snyder \\
with tha utility's construction and quality assurance programs in 1979, we did not hegitate to stop all safety-related construction work.
Only after major rev
' g of the construction management and quality assurance systems was some work ermitted to resume in December 1980, and concrete work was not permitted to rehsme until March 1981, 19 months after work was stopped.
It is not correct, a our constituent suggests, that NRC failed to keep its word on the resumption f concrete work.
The views of the consultants were to be one portion of the in mation assessed in permitting work to resume, but it was not expected that th onsultants' final report would be a prerequisite to making the decision.
The C staff permitted concrete work to resume at Marble Hill only after extensiveq nspections and review of work at the site i
and the upgraded management and qbality assurance programs, as well as soliciting the findings of the consultants.
When the consultants' report is complet
, within about one month, it will be publicly available.
NRC documents on Mar e Hill are available for inspection and copying at the Madison-Jefferson County ublic Library in Madison,' Indiana.
Included in the documents available are Profe or Cassaro's letters to NRC on the sampling program and NRC's replies.
I trust this information satisfies your concerns an those of your constituents.
Sincerely, N
's William J. Dircks N
Executive Director for Opevations Distribution:
s HR Denton, NRR IE Files HK Shapar, ELD IE Reading VStello, IE Central Files
\\
RCDeYoung, IE RPS Files LNUnderwood, MPA RRRI Files
\\
JHSniezek, IE SECY-81-0739
\\,
TLHarpster, IE EBBlackwood, IE PFMcKee, IE EDO 10519 Beth Matosko, IE (H11-246-H07)
WPU:JD R
I:g RPS:RRRI:IE RPR B:RRRI:IE D:RRRI:IE ELD 6/16/81 P
EB81ackwood TLHarpster JHSniezek MCKEE(A) 6 [-
1 6/%/81 6/[(p/81 6/ /81 6/ /81 DD:IE 0:IE EDO l
RCDeYoung VStello WJDircks 6/ /81 6/ /81 6/ /81
f
- p
-' '7 ROM:
ACTION CONTROL DATES CONTROL NO
'1 10519 comp' ocao'i~e g,, c 3.,
mei AC KNOWLEDGM ENT OATE OF DOCUMENT J
{
INTERIM REPLY
[
TO:
p PR E P AWM R' 38GN ATUR E j
Wimn Me FINAL REPLY
/
lg)
CHAIRMAN FILE LOCATION / i gfj H( ' gy7 "g EXECUTIVE DIR ECTO R l
4II mLn!?/,
I oTHeR'
~
{
pLETTER OMEMO O REPORT C OTHER hPECIAL INSTAtJCTIONS OR REMARKS D ESCRIPTION i
Enc 1 ltr es Max H. Sctnsartz concerning L-(CS C -9 d
e quality of the constructfos of the LC 4'
t.
<- i l
Harbia Hill Nuclear Power facility
. r. ". c..
C t
j
. t e- - ( c.i.;:
r,. - f,.,
~
}
CLASSIFIED DATA I
l OOCUMENT/ COPY NO.
CLASSIFICATION l f
MUMBER OF PAGES CATEGORY SECY-31 -0739 POSTAL REGISTRY NO.
CATE INFORMATION ROUTING LEG AL REVIEW C FINAL w OOGY !
AS$1GNED TO:
DATE NO LEGAL OSJECTIONS SM1 4 !!
E/07/"'
Denton NOTiF Y:
SWar O ECO ADMIN & COR RES SC L
f a jf) y qr
_ __ pr EXT.
N.
-es. -
Te/ c /
COMMENTS. NOTI FY.
I i EX T.
~
h JCAE NOTIFICATION RECOMMENDEO O vES CN I k NRC FORM 232 EXECUTIVE OIRECTOR FOR OPER ATIONS po nor astf0VE THIS CO?'
PRINCIPAL CORRESPONDENCE CONTROL i
1
\\
l
1
/
fROM:
ACTION CONTROL DATES CONTRO L NO 10519 j
=Ma' oc^o'i~'
i e u. c.3. sog.e sf fy ACKNOWLEDG M ENT DATE OF OOCUMENT J
INTERIM REPLY gf w pqq PREPATfdR $1GNATURE l
TO:
OF:
r F '"^ ' " EY
- r O CHAIRMAN i
Chairuas i?endrie FILE LOCATION g.., sf g EXECUTIVE DIRECTOR OTHER:
[
D ESCRIPTION
{ LETTER O MEMO O REPORT C OTHER SPECIAL INSTRUCTIONS OR REMARKS e
s Enc 1 ltr en Mar N. Schartz concerning i
quality of the construction of the Marole.5111 Nuclear Power facility l
~
t
[
CLASSIFIED DATA i
DOCUMENT / COPY NO.
CLASSIFICATION l NUMBER OF PAGES CATEGORY POSTAL REGISTRY NO.
ASSIGNED TO:
DATE INFORMATION ROUTING LEG AL REVIEW O FINAL C COPY AS$1GNED TO:
DATE NO LEG AL OBJECTIONS f,
e, o M i.. --
r,f* 4., m L@mto4 NOTIFY:
fr a
$ hap 4F O EOO AOWN 4 CORRES S A E X T.
~~
f '.
(jgg g
_s
/
COMMENTS, NOTIFY:
}
~~
/
EXT.
3 y
JCAE NOTIFICATION RECOMMENDED:
O YES O NO 6
NRC FORM 232 EXECUTIVE DIRECTOR FOR OPERATIONS 00 NOT REAf0VE TH/S COPY f, PRINCIPAL CORRESPONDENCE CONTROL
l
\\
f I
~
PROM:
ACTION CONTROL DATES CONTROL NO 10519 cc~"'cc^cu"c uo. cua s e r
- emn, ACKNOWLEDGMENT DATE OF DOCUMENT h
INTERIM REPLY t M fM PREPAMMR SIGNATURE TO:
FINAL REPLY CHAIRMAN FILE LOCATION g EXECUTIVE DIRECTOR OTHER:
?I O ESCRIPTION
{ LETTER OMEMO O REPORT C OTHER SPECIAL INSTRUCTIONS OR REMARKS i
Enc 1 Itr fin fta W. Scheart2 canceratag j
wality of the constructies of the
}
Marisle Hill svelaar Power facility 2
p i
f CLASSIFIED DATA DOCUMENT / COPY NO.
CLASSIFICATION l NUMBER OF PAGES CATEGORY POSTAL R EGISTRY NO.,
l ASSIGNED TO:
OATE INFORMATION ROUTING LEG AL R EVIEW D FINAL 0 Copy ASSIGNEO TO:
DATE NO LEGAL OBJECTIONS
.. a,.
.u.
e,,.., g MM NOTIFY:
N par O ECO ADMIN & CORRES BR cx7-Linda UsJarwood
/
COMMENTS. NOTIFY:
)
EXT.
JCAE NOTIFICATION RECOMMENDED:
O VES O NO I
3RC FORM 232 EXECUTIVE DIRECTOR FOR OPERATIONS 00 NOT REMOVE THIS COPY PRINCIPAL CORRESPONDENCE CONTROL
}
5 ACTION CONTROL DATES CONTROL NO "A
10519 FROM:
e COMPT. OEAOLIN E 4,m,m
'j
/ Igg, (A3g Mpgp ACKNOWLEDGM ENT DATE OF DOCUMENT INTERIM REPLY s79,74}
PREPARB FOR SIGNATURE r
TO:
OF:
i FINAL REPLY O CHAIRMAN UD31PE39 Ift.tjP1C FILE LOCATION Q EXECUTIVE DIRECTOR OTHER:
j
?
DESCRIPTION 3 LETTER O MEMO O REPORT C OTHER SPECIAL INSTRUCTIONS OR R EMARKS l
i e
inc1 Itr N. Max N. Schwartz concarmfag quality of the canstructfos of the
.*.arole N111 Sweiser Peser facility j
i f
C1.ASSIFIED DATA
'y OOCUMENT/ COPY NO.
CIASSIFICATIONl
[
NUMBER OF PAGES CATEGORY gyggg
[
POSTAL REGISTRY NO.
ASSIGNED TO:
DATE INFORMATION ROUTING LEG AL REVIEW D FINAL 0 COPv I
5:4113 IE 5/77/9.1 Centos ASSIGNEO TO:
DATE NO LEGAL OBJECTIONS E3I OEO OMIN & COR RES BR blAda M EXT.
COM MENTS. NOTIF Y:
I EXT.
JCAE NOTIFICATION RECOMMENDEo:
0 YES O NO
.t J.
NRC FORM 232 EXECtJTIVE DIRECTOR FOR OPERATIONS DO NOT REMOVE THIS COPV
'8 PRINCIPAL CORRESPONDENCE CONTROL 1
i
?
/
-/
R1-07%
\\
i 80 M N 5/27/81
..,,,n, o..
NRC SECRETARIAT TO: O comm.
on.,
- o..
E x.c. oirJOper.
O c.n. coon Li.e.on O soiicitor O Pubiic A, fairs O s cretary O
O in.oe. tore,Aodito, O ~,on.ys n
Rep Gene Snyder, Const Ref incom,n,.
From:
Max H. Schwartz 5/22/81 To:
Hendrie o.t.
son,.ct.
ennenened about the confusionaround u m,- mee nn the nivality nf the enn<:tr of the Marble u411
'f a r-O e s vor n u,.or:
v Ocw
~
O c _.- -- :-._
O EDO, GC, Ct SQL., PA, SECY, I A, PE O si,.iu,. nioca omit.o O
O R orn on i of incom ih r n
XXW Fo, oi,,ct,.osy.
Suspense: June 15 O For n.
.crion O Forinsorm.cion Ree'd Off.
g%
Date.....)
-= -.masm docket 7;.ma,ks:
" r..._
U_s. e,
. 51 //
D1IIle
,/,/IV For th. Commi. son:
' Send three (3) cosHe. of reply to Secy Correspondence and R rd. Branch nace2 ACTION SLIP