ML20141A217
| ML20141A217 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 04/01/1986 |
| From: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8604040415 | |
| Download: ML20141A217 (1) | |
Text
1 S
PUBLIC SERVICE INDIANA April 1, 1986 Docket Nos. S'IN 50-546 S. W. Shields STN 50-547 senior vice President -
Construction Permit Nos.
corporate services CPPR-170 CPPR-171 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Pogulatory Camission Washington, D.C.
20555
SUBJECT:
Marble Hill Nuclear Generating Station, Units 1 and 2
Dear Mr. Denton:
. As I indicated in my letter of February 6,1984, PSI intends to keep you informed of significant changes in the quality assurance projram of the Marble Hill Nuclear Generating Station. Due to the can-cellation of construction activities and in keeping with PSI's intention of investment recovery, the quality assurance program is being revised to reflect the organizational structure of the Investment Recovery Pro-gram.
This will result in revisions consisting of changes in titles and reporting lines, and elimination of no longer applicable criteria.
The quality assurance progranmatic controls which will be affected for our sales effort will closely parallel those existing in the present "PRN ECT QUALITY ASSURANCE MANUAL". The revised program entitled "IN-VES'IMENT RTOVERY QUALITY ASSURANCE MANUAL" is in cmpliance with the applicable requirenunts of 10 CFR 50, Appendix B which relate to our In-vestment Recovery Program.
If you have any questions, please contact me at your conven-
~
ience. Thank you for your consideration.
Sincerely, f
/
4040415 860401 A
ADOCK 05000546 PDR
[\\
="
c cc: James Keppler g
1000 East Main Street, Plainfield, Indiana 46168 317. 838.2208 L
j