FOIA Request for Listed Documents for Specified DocketsML20235B362 |
Person / Time |
---|
Site: |
Hope Creek, Seabrook, 05000000, 05000449, 05000340, 05000467, 05000448, 05000580, 05000376, Allens Creek, Marble Hill, New England Power, Phipps Bend, Sundesert |
---|
Issue date: |
08/25/1987 |
---|
From: |
Mccrea E CAROLINA POWER & LIGHT CO. |
---|
To: |
Felton J NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
---|
References |
---|
FOIA-87-554 NUDOCS 8709240078 |
Download: ML20235B362 (5) |
|
Similar Documents at Hope Creek, Seabrook, 05000000, 05000449, 05000340, 05000467, 05000448, 05000580, 05000376, Allens Creek, Marble Hill, New England Power, Phipps Bend, Sundesert |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K5221990-09-14014 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-443/90-15.Corrective Actions:Procedure ON1090.04 Revised to Require That Whenever Containment Entry Made,Entry Logged in Action Statement Status Log ML20059K5951990-09-14014 September 1990 Forwards Endorsement 29 to Nelia Policy NF-296,Endorsement 22 to Maelu Policy MF-127,Endorsement 9 to Nelia Policy N-109 & Maelu Policy M-109 ML20059K1051990-09-13013 September 1990 Advises of 1990 Biennial Exercise Meeting Scheduled for 900928 at Facility to Discuss Comments Re objectives/extent- of-play Submittal & Present Operational & Radiological Details of Scenario.Suggested Agenda Encl ML20059H5391990-09-10010 September 1990 Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991 ML20059E6821990-09-0404 September 1990 Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld ML20059E6791990-09-0404 September 1990 Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21) ML20059D6971990-08-30030 August 1990 Forwards 10CFR50.59 Quarterly Rept for Apr-June 1990 ML20059E7021990-08-30030 August 1990 Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM ML20059D2531990-08-30030 August 1990 Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station ML18095A4391990-08-29029 August 1990 Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances ML20059D2191990-08-27027 August 1990 Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY ML20059D2491990-08-24024 August 1990 Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies ML20059C3051990-08-24024 August 1990 Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3 ML20059B0231990-08-21021 August 1990 Forwards Addl Info Re Topics Discussed on 900816 Concerning Licensees Response to Intervenors Emergency Motion to Reopen Record on Adequacy of Staffing of New Hampshire Radiological Emergency Response Plan & Immediate Shutdown ML20064A4001990-08-21021 August 1990 Forwards, New Hampshire Yankee Fitness-For-Duty Semiannual Rept,900103-0630 ML17348B4921990-08-15015 August 1990 Forwards Revised Evacuation Time Estimates Incorporating Vehicles Hidden from Aerial Observation,Per ALAB-932 & ASLB Memorandum & Order LBP-90-20.Revised Estimates Will Be Incorporated Into Radiological Emergency Response Plan ML20059A3051990-08-14014 August 1990 Informs of Closing on United Illuminating Co Sale & Leaseback Transaction on 900809,per Amend 1 to License. Transaction Conforms to Description in Amend Application, ,as Supplemented by 900426 & 0606 Ltrs ML20058M2211990-08-0303 August 1990 Notifies of Change in Listed Licensed Operator Position. MR Breault Will Continue to Maintain Senior Operator License in New Position Until 900917 ML20058L9571990-08-0303 August 1990 Forwards Rev 1 to Inservice Testing Program for Pumps & Valves,Adding Cold Shutdown Justification ML18095A3861990-07-30030 July 1990 Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment ML20055J4751990-07-26026 July 1990 Confirms That Util Completed Installation & Testing of Facility ATWS Mitigation Sys,Per 890706 Commitment ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML20055J0271990-07-24024 July 1990 Forwards Rev 5 to Facility Security Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML20055H5831990-07-20020 July 1990 Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML18095A3611990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML20055G1571990-07-17017 July 1990 Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program ML18095A3591990-07-13013 July 1990 Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items ML20055G4721990-07-11011 July 1990 Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion ML20044B1861990-07-10010 July 1990 Forwards Rev 1.B to Spmc,App H,New Hampshire Yankee Offsite Response Communications Directory & Spmc,App M,New Hampshire Yankee Offsite Response Emergency Resource Manual. ML20055E5181990-07-0303 July 1990 Suppls Request for Noncode Temporary Repair of Svc Water Sys.Ultrasonic Exam of Area Surrounding Patch Will Include Samples,In Accessible Areas,Out to Diameter of 14 Inches ML18095A3301990-07-0202 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl ML18095A3231990-06-28028 June 1990 Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits ML20055D0351990-06-26026 June 1990 Forwards Addl Info Re Svc Water Sys Noncode Temporary Repair,Per 900621 Application.Util Will Perform Ultrasonic Testing of Pipe Wall Adjacent to Fillet Weld Repair & on Patch.Insps Will Be Performed at 90-day Intervals ML18095A3211990-06-26026 June 1990 Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout ML20044A6631990-06-25025 June 1990 Responds to NRC 900524 Ltr Re Violations Noted in Insp Rept 50-443/90-10.Corrective Actions:Maint Group Instruction Issued Describing Valve Verification When Valves Not Covered by Procedure & Procedures Written Re Monitoring Skids ML20044A3741990-06-22022 June 1990 Notifies That United Illuminating Co Received Approval of State of CT Dept of Public Util Control of Sale & Leaseback of Facility ML20044A6251990-06-21021 June 1990 Requests Approval of Temporary Noncode Repair of ASME Code Class III Piping Flaw.Flaw Located in 30-inch Diameter Moderate Energy Svc Water Line.Svc Water Sys Will Be Evaluated for Other Flaws,Per Generic Ltr 90-05 ML20043H1321990-06-18018 June 1990 Forwards New Hampshire Yankee Power Ascension Assessment Self-Assessment Team Phase 2 50% Power Plateau. ML20043G4761990-06-11011 June 1990 Lists Changes in Status of Licensed Operator Positions at Facility,Per 10CFR50.74 ML20043F5791990-06-0808 June 1990 Requests That Meeting W/Nrc & Westinghouse Be Held During Wk of 900624 to Further Discuss Intended Cycle 2 Fuel Design Features & Fuel Mgt Strategies ML20043E9811990-06-0606 June 1990 Forwards Info on Owner Participation & Owner Trustee in United Illuminating Co Sale/Leaseback Transaction, Consisting of Sec Form 10K & Citicorp 1989 Annual Rept. ML20043E5371990-06-0606 June 1990 Responds to NRC 900508 Ltr Re Violations Noted in Insp Rept 50-443/90-08.Corrective Actions:Signs Will Be Placed on Containment Hatches to Remind Personnel That Retest Required After Containment Hatch Use & to Notify Control Room ML20043F3301990-05-31031 May 1990 Advises That Contrary to 891223 Commitment,Testing Procedures to Demonstrate Full Safety Function Flow for Certain Check Valves Have Not Been Revised.Failure to Comply to Commitment Due to Administrative Error ML20043C5251990-05-31031 May 1990 Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Util Verified That Certificates of Conformance Issued by Telemecanique for All 305 Telemecanique-supplied Molded Case Circuit Breakers ML20043B7291990-05-24024 May 1990 Forwards Employee Allegation Resolution Program Radio Communication Transcript Review. Transmissions Did Not Contain Issues of Detrimental Safety Significance to Public or Plant Personnel ML20043C1031990-05-23023 May 1990 Forwards Revs 53 & 54 to Production Emergency Response Manual. ML20043B3631990-05-22022 May 1990 Forwards Revised Response to Request for Addl Info Re Bailey Solid State Logic Module (Sslm) Reliability for 1988 & 1989. Criteria Used to Monitor & Trend Bailey Model 862 Sslm Failure Rates Described in 900419 Ltr Modified ML20043B7231990-05-21021 May 1990 Forwards Revised Page 8 to Semiannual Radioactive Effluent Release Rept Forwarded on 900228.LER Being Prepared to Provide Details Re Liquid Radioactive Effluent Release Monitor Out of Svc for Greater than 30 Days ML20043F7071990-05-18018 May 1990 Forwards Addl Info Re Status of Licensee Actions in Response to INPO Evaluation Repts of Facility for 1983-1989,including Update of Response to INPO Rept of 1983 Const Project Evaluation & Evaluation of Seabrook Station Const Project. 1990-09-04
[Table view] |
Text
_- .
l a i i
1 Carolina Power & Light Company 411 Fayettevule Street Mall Post Office Box 1551 Raleigh, Nonh Carolina 27602 August 25,1987 IJGAL DEPARTMENT l
Uriter's Direct Dialgumber (919)8 % 81 (919) % 7 78 REEDOM 0F INFORMATION ACT REQLlEST 1 Mr. J. M. Felton, Director Division of Rules and Records hM[Q
/ /
Office of Administratbn U. S. Nuclear Regulsiory Commission G [ V7-[ 1 Washington, D.C. 24555 l j
R E: Freedom of Information Act Request Regarding Construction Permit Application Review Process j
Dear Mr. Feltoti:
Pursuar/t to the Freedom of information Act (5 U.S.C. S 552) and the NRC's implementing regulations thereunder (10 C.F.R. S 9.3 et seq.) I hereby request on behalf of Carolina Power & Light Company copies of the following documents, listed below by NhC Docket Number:
Docket Date (reprinted from NRC Public Number Docketed Description Document Room index) 50-340 12/15/69 Ltr 12-15-69 to JCAE trans (2) cys ltr ree'd recently advising Public Service Company of New Hampshire is deferring to a future date plans for the Seabrook Nuclear Station.
50-354 12i'08/72 -
Memo to Commissioner Ramey re status of Newbold Island review 50-354 10/20/73 Lir 10-19-73 fm PSE&G re our 10-5-73 ltr . . re . . .
conclusions that
- Artificial Island adjacent to Salem Units 1 & 2 is a more desirable location . . . . adv an amdt to Lie will be made to relocate these units adjacent to Salem Units 1 & 2. . . .
8709240078 07082W PDR FOIA MCCREAB7-SS4 PD9 +
Mr. J. M. Felton
'A ugust 25,1987
. Page 2 Docket Date Number Docketed Description 50-354 11/01/73 Lir 11-1-73 fm PSE&G notarized 10-31-73 . . . re our 10-5-73 ltr . . . trans the following:
AMDT #13 consisting of . . . .
(1) Info re relocation of Plant Site to Artificial Island site in Lower Allows Creek Twp, Salem Co, NJ l (2) Predesignation of Plant Name fm Newbold Island to Hope Creek AMDT #5 to Enviro Rpt (100 addl.
cys rec'd 11/15/73) 50-354 12/07/73 Commission memo re amended app!! cation relocating ,
site - Hope Creek station units 1 & 2 (formerly : l Newbold Island units 1 & 2) 50-354 01/02/74 Ltr 1-2-74 to Walter L. Baumann ref ltr 11-2-73 requesting explanation of basis for the AEC Reg l Staff's conclusion concerning relocation of Newbold I Island facilities l
l 50-376 09/20/74 Ltr to Dr. Modesto Iriarte, Jr. fm William O. Miller ce their proposed submittal of a revised application for a l construction permit, for the North Coast Nuclear Station.
50-443,-444 02/22/74 Giambusso to Tallman, 12/14/73 establishment of schedule for review of application for construction permits 50-443,-444 08/27/75 Ltr Grant dtd 8/22/75 re postponement for a number of years on construction in this part of country w/ certificate of service 50-448,-449 09/25/74 Lir 9-25-74 to PEPCO ady of change in the establishment schedule for our enviro review 50-448,-449 10/01/74 Lir 9-27-74 fm PEPCO re our 9-13-74 Itr . . . . furn info concerning the schedule for the Revised Safety Review . . . .
Mr. J. M. Felton August 25,1987 Page 3 Docket Date Number Docketed Description 50-448,-449 01/28/75 Memo fm WA Paulson re summary of meeting to <
discuss a schedule for resolving open items and issuance of the Safety Evaluation l 50-448,-449 03/15/75 Ltr 3-12-75 fm PEPCO re our 5-7-75 Itr . . . furn info re to schedule submission of new applications for power plants in FY 1978. . . .
50-448,-449 05/29/75 Ltr 5-23-75 fm ?EPCO informing NRC of the current status of the project in suspension & to suspension & to summarized the actions planned for accomplishment during the suspension period . . . . .
50-448,-449 06/06/75 Ltr 6-6-75 fm PEPCO re our 5-78-75 ltr . . . furn info with regard to the schedule for submission of Mark 11 containment system info . . . adv that the req info will be submitted in the first half of 1978. . . .
50-448,-449 08/12/75 Memo fm MD Lynch to WR Butler re forthcoming meeting with PEPCO to discuss the completion of the Douglas Pt. on 8-27-75 50-448 05/20/77 NRC staff response to board prehearing conference inquiry held 05/10/77 concerning what effect the two year deferral of Douglas Point Unit 1 might have on alternate site review w/ attached Cert of Svc 50-448 06/09/77 RE: PEPCO's 6/9/77 announcement of indefinite deferral of Unit 1, which reflects further revisions to company's load forecasts. This does not alter schedule recently adopted by ASLB and PSC for resumption of joint hearings.
50-448 06/21/77 Request of NRC staff to postpone the site suitability hearings and solicit the views of all parties as to the need for other factors in the hearings and whether the early site review regulations are applicable.
50-466,-467 01/02/74 Memo fm J. F. O' Leary to L. Manning Muntzing re construction permit review schedule for the Allens Creek Nuclear Generating Station
Mr. J.~ M. Felton
%ugust 25,1987
- o. Page 4 Docket Date Number Docketed ' Description 50-466,-467 .06/26/74 Ltr 5-28-74 fm Herm Assoc. concerning delay in const of Allens Creek.
50-466 08/31/78 Summary of meeting held on 8-22-78 to discuss review issues of the reactivated application' for a permit to' construct Allens Creek Nuclear Generating Station, Unit 1.
50-466 08/16/78 Summary of meeting with applicants to discuss review !
schedule matters. W/Att at List & Staff'e current priority listing fcr case work 50-546,-547' 11/24/75 Ltr 11-24-75 to PS of I . . . . Lir adv that our review is already being delayed by the lack of the requested info and the. delay will be significant if - completely adequate responses are not provided by 12-8-75. . . . .
50-546,-547 12/10/75 Ltr 12-5-75 to James Coughlin, PSI trans Marble Hill review schedule 50-553,-554 11/24/75 Memo fm RS Boyd to BC Rusche re proposed CP stage health & safety review schedule 50-553,-554 06/14/76 Ltr 6-11-76 fm TVA notarized 6-11-76. . . trans:
Revision #1 to Phipps Bend ER consists of a revised chapter 1 reflecting changes in scheduled commercial opr dates & updated the projected load with recent forecast . !
50-568 03/08/77 Mtg on March 10, 1977 to discuss N.RC Staff enviro j
, review of NEP 1 & 2 Application.
50-li80 11/16/78 Announces sched delays in constr of 3 large elec generating units.
- - - - - - - - - - --- - - - - - - - - - - - - - -- 1
I ' Mr. J. M. Felton l' '
r e August 25,.1987
, J - Page 5 -
t Docket Date -
Number Docketed. ' Description 50-580 11/16/78 Announces sched . changes in constr of nue generating units. Delays cau. sed by constr delay, increased costs, changing reg requirements, environ controls, market -
conditions & cuatomer sensitivity to increasing cost.
582 08/04/77 Establishment of a schedule for radiological safety review of appl. for const. permits. NRC estimates -
prospective decision date to be- 3/30/79. Site suitability report 'date issuance est. to be 2/21/78.
Radiological safety review milestones provided as enclosure. NRC requests careful . review estimated milestone dates to see whether or not they are realistic and whether they need adjusting.
50-582 02/09/78 Furnishing info re NRC's revised schedule for the -
remaining milestones in the environ review of Applicant's Appl for construction permits for Units 1 & 2 . . . . w/att summary of remaining environ review milestones.
50-582 10/24/78 Forwards interim SER for subj facils.Rept documents status of PSAR review when review effort was terminated following 05 iO2-78 notification that work on subj facils had been suspended.
I would appreciate your prompt response to this request. If you have any questions concerning the material requested, please do not hesitate to contact me at (919) 836-8162.
Thank you for your assistance.
Sincerely,
/l/ A '~
Edle S. McCrea Legal Specialist ESM:ykh