TXX-4569, Deficiency Rept SDAR-199 Re Unsatisfactory Reinsp by Technical Review Team.Significant Insp Being Conducted to Ensure Equipment Will Perform Intended Safety Function.One Inspector Terminated

From kanterella
Revision as of 12:52, 13 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Deficiency Rept SDAR-199 Re Unsatisfactory Reinsp by Technical Review Team.Significant Insp Being Conducted to Ensure Equipment Will Perform Intended Safety Function.One Inspector Terminated
ML20132G845
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/26/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunnter D, Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-199, TXX-4569, NUDOCS 8510010639
Download: ML20132G845 (1)


Text

TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWER . 400 NORTH OLIVE NTREET, L.R. 8 5 . D ARJ AM, TEX AN TSRO S WILLIAM G COUNSIL September 26, 1985 TXX-4569 Mr. D. R. Hunter, Chief Reactor Project Branch 2 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 100 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION QUALIFICATION / CERTIFICATION OF INSPECTORS QA FILE: CP-85-37, SDAR-199 FILE N0.: 10110

Dear Mr. Hunter:

In accordance with 10CFR50.55e, we have concluded that the deficiencies discovered during reinspection efforts of T.R.T Issues 1.a.2 and 1.a.3 constitute a reportable condition. To ensure that the equipment involved will satisfactorily perform its intended safety functions we are conducting a significant reinspection of the work performed by the original inspectors. In addition, one inspector has been terminated partly because of falsification of inspection records.

Supporting documentation is available at the CPSES site.for your Inspector's review.

Very truly yours, ,

/l, &l 4 (1&2 W. G. Counsil

.WGC/bil Attachment cc: NRC Region IV - (o + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555

@ B O W,fl p.3

!  ; l 8510010639 850926 \ SEP271985 I PDR ADOCK 05000445  ;

S PDR ,

j

.jl I

,p/, . . _ . _ - - . _ .

qqt P Ij t

0