TXX-4569, Deficiency Rept SDAR-199 Re Unsatisfactory Reinsp by Technical Review Team.Significant Insp Being Conducted to Ensure Equipment Will Perform Intended Safety Function.One Inspector Terminated
| ML20132G845 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/26/1985 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Hunnter D, Hunter D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-199, TXX-4569, NUDOCS 8510010639 | |
| Download: ML20132G845 (1) | |
Text
TEXAS UTILITIES GENERATING COMPANY SKYW AY TOWER. 400 NORTH OLIVE NTREET, L.R. 8 5. D ARJ AM, TEX AN TSRO S September 26, 1985 WILLIAM G COUNSIL TXX-4569 Mr. D. R. Hunter, Chief Reactor Project Branch 2 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 100 Docket Nos.:
50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION QUALIFICATION / CERTIFICATION OF INSPECTORS QA FILE: CP-85-37, SDAR-199 FILE N0.:
10110
Dear Mr. Hunter:
In accordance with 10CFR50.55e, we have concluded that the deficiencies discovered during reinspection efforts of T.R.T Issues 1.a.2 and 1.a.3 constitute a reportable condition.
To ensure that the equipment involved will satisfactorily perform its intended safety functions we are conducting a significant reinspection of the work performed by the original inspectors.
In addition, one inspector has been terminated partly because of falsification of inspection records.
Supporting documentation is available at the CPSES site.for your Inspector's review.
Very truly yours,
/l, &l 4 (1&2 W. G. Counsil
.WGC/bil Attachment cc: NRC Region IV - (o + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555