MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section1999-05-26026 May 1999 Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept1999-05-17017 May 1999 Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 9906071999-05-10010 May 1999 Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20059K2021990-09-12012 September 1990 Submits Supplemental Response to Generic Ltr 89-14, Svc Water Sys Problems Affecting Safety-Related Equipment. Intake Structure Insp Program Developed.Procedures for Insp Implemented & Intake Structures Sampled & Analyzed ML20064A8041990-09-0505 September 1990 Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990) ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20059G8321990-08-30030 August 1990 Withdraws 880726 Proposed Tech Spec Change,Clarifying Tech Spec 3/4.7.6 Re Emergency Power Requirements for Control Room Ventilation Sys ML20059D2011990-08-27027 August 1990 Forwards Piedmont Municipal Power Agency , Authorizing Use of Annual Rept for NRC Docket Requirements ML20059D2441990-08-24024 August 1990 Forwards Special Rept PIR-1-C90-0261 on 900725 Re Cathodic Protection Sys Failure to Pass Acceptance Criteria of 60-day Surveillance.Std Work Request Generated to Check Voltage Potential at Test Station TS-36 on Weekly Basis ML20056B4981990-08-22022 August 1990 Responds to NRC Request for Addl Info Re General Relief Request for Pump Vibration Submitted 900315.Relief Request Changed to Insure Data Taken Over Range That Encompasses All Main Potential Noise Contributors ML20056B5011990-08-22022 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-17 & 50-414/90-17.Corrective Actions:Review Will Be Conducted to Determine Category of Infrequently Run Procedures Needing Addl Verification Controls ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20056B4971990-08-20020 August 1990 Clarifies Info Submitted in 871207 & s Re Steam Generator Tube Rupture Analysis Demonstration Runs. Demonstration Runs Met plant-specific Requirements in Section D to NRC SER on WCAP-10698 ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B6581990-08-17017 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-15 & 50-414/90-15.Corrective Actions:Present Methods of Testing Operability of CO2 Fire Protection Sys Will Be Evaluated by 910201 to Determine If Addl Testing Necessary ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0951990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Catawba Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20059C1231990-08-15015 August 1990 Advises That Util Submitting Special Rept Re Valid Failure of Diesel Generator 2B Would Be Delayed Until 880229 Had Incorrect Ltr Date.Date of Ltr Should Have Been 880204 Instead of 880104.Corrected Ltr Encl ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20059C2211990-08-13013 August 1990 Forwards Revised Chapter 16, Selected Licensee Commitments Manual, to Plant Updated Fsar,Per 10CFR50.4 & 50.71.Manual Contains Commitments Which Require Control But Not Appropriate in Tech Specs ML20063Q0261990-08-10010 August 1990 Forwards Rev 0 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept, Per Tech Spec 6.9.1.9 ML20063Q0671990-08-10010 August 1990 Submits Revised Response to Violations Noted in Insp Rept 50-413/90-09.Procedure to Verify Test Inputs Modified to Verify Dummy Input Signal to Channel RTD Circuit ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20081E1601990-08-0101 August 1990 Advises of Completion of 900330 Commitment Re Standing Work Request for Insp of Air Flow Monitors & Dampers,Per Violations Noted in Insp Rept 50-413/90-03 & 50-414/90-03 ML20058P3261990-08-0101 August 1990 Forwards Public Version of Rev 26 to Station Directive 3.8.4, Onsite Emergency Organization ML20081E0951990-07-27027 July 1990 Forwards Decommissioning Financial Assurance Certification Rept for Duke Power Co,co-owner of Catawba Nuclear Station Units 1 & 2 ML20055H9741990-07-26026 July 1990 Forwards end-of-cycle 3 Steam Generator Insp Rept.Nineteen Tubes Removed from Svc by Plugging W/Rolled Mechanical Plug ML20055H5231990-07-24024 July 1990 Discusses co-licensee Relationship & Obligations Re Decommissioning Financial Assurance for Facilities ML20055H4571990-07-19019 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-11 & 50-414/90-11.Corrective actions:I-beams/ Hoists Rolled to Ends of Ice Condenser & Securely Located on Rails to Prevent Any Movement ML20055H1741990-07-18018 July 1990 Withdraws 880527 & 0725 Amends Clarifying Requirements for Containment Pressure Control Sys ML20055J3441990-07-17017 July 1990 Advises That Commitment Re Procedure IP/O/A/3190/01,per Violation in Insp Repts 50-413/90-06 & 50-414/90-06, Completed on 900619 ML20055H4131990-07-16016 July 1990 Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04 ML20055F8991990-07-13013 July 1990 Forwards Monthly Repts for June 1990 for Catawba Nuclear Station Units 1 & 2 & Operating Status Rept for May 1990 ML20055G2311990-07-13013 July 1990 Withdraws 880311 Proposed Amend to Tech Spec Table 3.3-3, Item 8.f Re Number of Instrumentation Channels Associated W/ Main Feedwater Pumps.Util Determined That Change Unnecessary ML20055F8461990-07-12012 July 1990 Requests 14-day Extension Until 900802 to Submit LER 414/90-010 to Investigate Power Supply Realignment ML20058P1231990-07-0707 July 1990 Advises That Commitment to Revise Maint Mgt Procedure 1.12 to Include Functional Verification Requirements & to Develop Retest Manual to Address Retest Requirements for Any Maint Performed on Components Completed on 900614 ML20055F4131990-07-0505 July 1990 Forwards Inservice Insp Rept Unit 1 Catawba 1990 Refueling Outage 4, Per 10CFR50.55(a)(q) & Tech Spec 4.0.5.Insp Performed Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda ML20055D4291990-06-29029 June 1990 Supplemental Response to Violations Noted in Insp Repts 50-413/89-13 & 50-414/89-13,per .Personnel Responsible for Maintaining Crisis Mgt Ctr Drawing Trained. Util Will Continue to Evaluate Changes Made to Program ML20055E2191990-06-29029 June 1990 Submits Revised Commitment Dates Re Implementation of Dept Guidance on post-maint Testing,Per Commitment Made in 891002 Response to Violations in Insp Repts 50-413/89-19 & 50-414/89-19.Completion Date Changed to 900701 ML20044B0621990-06-26026 June 1990 Forwards Public Version of Revised EPIP HP/0/B/1009/05, Personnel/Vehicle Monitoring for Emergency Conditions. W/Dh Grimsley 900716 Release Memo ML20043H6921990-06-18018 June 1990 Advises of Revised Completion Date for VA Ductwork Cleaning to 901231,per Insp Repts 50-413/90-03 & 50-414/90-03. Vendor Personnel Assigned to Task Unavailable to Complete Cleaning Until Late 1990 Due to Outage Support Needs ML20043G1691990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 for Catawba Nuclear Station,Units 1 & 2 & Corrected Monthly Operating Repts for Apr 1990 Re Personnel Exposure ML20055C8041990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-10 & 50-414/90-10.Corrective Actions:Instrument Root Valves Unisolated & Analog Channel Operational Tests for Low Temp Overpressure Protection Completed ML20043G4331990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.6.1.8 Re Lab Test of Carbon Samples from Annulus Ventilation Sys ML20043G3771990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.7.7 Which Required That Lab Test of Carbon Samples from Auxiliary Bldg Filtered Exhaust Sys Be Tested for Methyl Iodide Penetration of 0.71% ML20043G2511990-06-12012 June 1990 Withdraws 900419 Suppl to 871221 Application for Amends to Licenses NPF-35 & NPF-32 Re Tech Specs 4.7.6 Re Control Room Area Ventilation Surveillance Requirements ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G0721990-06-0707 June 1990 Responds to NRC 900510 Ltr Re Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09.Corrective Actions:Vc/Yc Train a Returned to Svc W/Supply Power from 2ETA.Terminal Box 1TB0X0346 Inspected & Insured Operable ML20043F6111990-06-0606 June 1990 Advises That Response to Request for Addl Info Re Operator Response Times During Simulated Steam Generator Tube Rupture at Facility,Will Be Delayed Until 900630 1990-09-05
[Table view] |
Text
e. 4 Duxn POWER GOMPAhT 18.0. ISOX 33180 GHARLOTTE. N.G. 28242 IIAL II. TtJCKER reternioxz vn.m ementosur (704) 373-4531
= = = = = = < = = October 7, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation ;
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Darrell G. Eisenhut, Director Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
Dear Sir:
Please refer to your letter of August 16, 1982 enclosing the Notice of Availability of the NRC Draft Environmental Statement for Catawba Nuclear Station.
Pursuant to 10 CFR Part 51, please find enclosed our comments on the subject document.
We appreciate the opportunity to comment on the Draft Environmental Statement and trust that the Commission will include these comments in the Final Environmental Statement.
Very truly yours, W
Hal B. Tucker
/6/
ROS/php Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law 314 Pall Mall Columbia, South Carolina 29201 gh
~
8210250102 821007 DR ADOCK 05000413 PDR
7, .
Mr. Harold R. Denton, Director October 7, 1982 Page 2 cc: Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 Mr. Henry A. Presler, Chairman Charlotte-Mecklenburg Environmental Coalition-943 Henley Place Charlotte, North Carolina 28207 i
i l
l l
I l
l l
l l
- 4. PROJECT DESCRIPTIONS AND AFFECTED ENVIRONMENT 4.2.4.5 Nuclear Service Water System Page 4-5i The DES states that sanitary waste will pass through the station discharge structure.
Comment The sanitary waste discharge does not pass through the combined service water discharge structure; it discharges into the discharge canal adjacent to the discharge structure.
4.2.6.2 Cooling Water System Page 4-6 The DES implies that maximum concentration values are shown in Table 4.4.
Comment The maximum concentration values for cooling tower blowdown are not listed in Table 4.4.
Page 4-7 The DES states that the fire protection system uses chlorinated filtered water as input.
Comment The fire protection system uses chlorinated filtered water when makeup to the system is from the jockey pumps. However, when the main fire pumps run, water input to the system is unchlorinated lake water.
4.2.6.3 Conventional Waste-Water-Treatment System Page 4-8 The DES states that the discharge flow rate from the CWWTS will be small compared to other station discharges to Lake Wylie and will average about 760 1/ min. (200 gpm). .
Comment The CWWTS discharge will average 300 gpm and this will still be small compared to other station discharges.
4.2.6.4 Sanitary- Waste-Treatment Systems Page 4-8 The DES states that the estimated volume of waste influent to the system is 6.4 x 10" 1/ day (17,000 gal / day).
Comment The 17,000 gal / day estimate for the sanitary treatment system is incorrect.
The design flow rate is 50,000 gal / day (CNS-ER/0LS section 3.7.1). Flow rates in excess of 50,000 gal / day are being experienced and the system is being upgraded to 80,000 gal / day, i
Page 4-8 The DES states that the sanitary waste treatment system effluent will not be chlorinated.
Comment The sanitary waste treatement system is chlorinated via a Sanuril chlorinator (CNS-ER/0LS Section 3.7.1). This chlorination was required by the state to adhere to the state NPDES permit.
4.3.2 Water Quality Page 4-10 The DES states that a program is the second 1-year-long study.
Comment For clarity, the sentence should read, "The Second Year Preoperational Study is the second 1-year-long study...."
Page 4-10 The DES states that the applicant does an analysis of data from a study but does not clarify which study.
Comment For clarity, the sentence should read, "The applicant's analysis of the data from the interim study indicates....".
Page 4-10 The DES states tnat data did not conclude reasons for immediate concern to the fishery resources of the lake.
Comment The word "immediate" should be eliminated because it implies that a tenuous situation exists in Lake Wylie which would cause harm to the fishery.
Page 4-11 The DES states that only nutrients, especially phosphorus, consistently occured at " higher than desirable concentrations."
Comment This statement can be very confusing if compared to the statement made on p. 4-10 (DES Section 4.3.2,1st paragraph, item #3), which indicates that Lake Wylie
is phosphorus limited. .These apparent contradictory statements need clarification.
The DES should include a. statement to the effect of, "although phosphorus is relatively abundant in Lake Wylie, it has been implicated as limiting nutrient because of the high nitrogen / phosphorus ratio."
4.3.4.2 Aquatic Biology, Fish Page 4-14 The DES states ". . . dominant species are.. .quillback.. . longnose gar."
Comment Quillback and Icngnose gar are not really dominant species from an abundance standpoint.' The'e r are a few large individuals but a low percent of the total fish collected have been represented by these two species.
Page 4-14 The DES states that threadfin shad account for 27.6% of the total collected.
Comment Although this value (27.6%) was extracted correctly from the text ~(the text was incorrect) of CNS-ER/0LS. The correct value should be 27.2% as correctly reported in CNS-ER/0LS Table 2.2.2-11.
Page 4-15 The DES uses the spelling Destritification.
Comment The spelling is destratification Figure 4.3 Nonradiological Release Points Page 4-21 The DES labels the waste water treatment facility discharge as the " water chemical system discharge."
Comment The discharge label should be changed to " Conventional Wastewater Treatment System Discharge" to be consistent with the text. The figure should be modified to clearly indicate where the discharge point is located. Additionally, the flows through the discharge structure should be clarified: flows include nuclear The service water, low pressure service water, and cooling tower blowdown.
sanitary treatment system discharge is into the discharge canal adjacent to the structure but not through the structure.
Table 4.4 Catawba Nuclear Station Waste Water Discharge
- Page 4-28 The DES uses ER-OL Table 3.6.1-2 from the ER-0L as a source for Table 4.4.
. ::a
-- r
- _x y;
9 ', ,
~ ' -
. s. ,.
Comment _ ,
Table 4.4 was derived from ER-OL Table 3.6.1-2 but has been modified incorrectly.
Footnotes 1 add -3 of Table 4.'4 apply to portions of ER-OL Table 3.6.1-2 that ,
were excluded when Table 4.4 was created. Correct footnotes for DES Table 4.4 '
are: ,_
'l) Alkalinity is' treated with sulfuric acid
- 2) '~ Incremental concentrations in the discharge cove estimates average station wastes in a flow of 56,200 gpm (125.2 cfs).
- 3) Incremental concentrations in Lake Wylie are based on average station waste discharges and a. flushing flow through the reservoir.
- The maximum incremental concentration is based on the 7-Q 10 flow of 648 cfs, and average incremental concentration is based on the average flow of 4445 cfs.
W 9
.a 6
e
'-t f
f J.
t i
~
l S. ENVIRONMENTAL CONSEQUENCES AND MITIGATING ACTIONS 5.1 Resume Page 5-1 The DES lists 5 requirements established by the EPP.
Comment For clarity these five items should read "...(1) notify HRC of major changes in plant design or operation, or if tests or experiments affecting the environment are performed; provided that such changes, tests, or experiments involve an unreviewed environmental question; (2) maintain specific environmentally related records in the form of communications with appropriate local state and/or Federc'; Agencies; (3) report violations of conditions stated in the NPDES permit or State Certification pursuant to Section 401 of the Clean Water Act by copy of memo to the lead agency; (4) report unusual or important environmental events by copy of memo to the lead agency; and (K) monitor to detect any changes which may arise from cooling tower drift."
These changes will help define the otherwise broad five requirements for non-radiological monitoring.
. 5.3.2.2 Surface Water l Page 5-3 The DES indicates discharges of 22491/sec (29,800 gpm) in the winter and 3242 1/sec (51,400 gpm) in the summer.
Comment I These numbers are incorrect and should read 1,199 (19,000 gpm) winter and 35321/sec (56,000 gpm) summer discharge flow rates.
Page 5-3 The DES quotes numbers from Table 5.3 which are incorrect. See later comments Page 5-68. It uses a 1.1% of total lake area for the worst-case isotherm and 0.7% of lake area for average winter isotherm.
Comment These numbers should be 0.9% for worst case total lake area effects and 0.6% for average winter total lake effects.
5.5.2.1 Impingement and Entrainment, Impingement Page 5-8 The DES states that with both units operating at full capacity the amount of water withdrawn through the Low Pressure Service Water intake will be a 3
maximum of 6.4 m /sec (227cfs).
. Comment The values of 6.4 m'/sec and 227 cfs do not agree with average and maximum values given in the ER0L. After the appropriate conversion of 99,000 GPM, (ER0L Figur'e 3.3.1-1) these values should be 6.2 m 8
/sec and 221 cfs, respectively.
5.5.2.2 Thermal Discharge Page 5-10
.The DES states that 42.5 ha (105 acres) are part of the worst case condition from Table 5.3.
Comment This table is incorrect. Comments are on Page 5-68. The worst-case condition-is for 40.0 ha (100 acres).
5.9.1 Regulatory Requirements Page 5-12 The DES states that the permissible levels of radiation are recorded in 10CFR20.
Comment For clarity, " contained" may be a better word than " recorded".
Page 5-13 The DES states that requirements of 10CFR50.36a that are to be imposed on licensees.
Comment.
The words "to be" should be deleted. The requirements are imposed on licensees.
Page 5-13 The DES states that applicants for permits to construct and for licenses to operate a LWR shall provide reasonable assurance that the following calculated dose design objectives will be met for all unrestricted areas.
Comment This ' area needs to be rewritten to clarify that the specified dose design objectives are for a single reactor and Catawba will be allowed double the stated values since it is a two (2) reactor station.
5.9.3.1.1 Occupational Radiational Exposure for PWR's Page 5-15 The first paragraph is confusing and needs to be clarified.
Comment The wording may be confusing to the public. It should be rewritten to j clarify the meaning.
i Page 5-17 In the third paragraph the collective occupational doses is confusing.
1 Comment Clarification of " doses" (annual or lifetime) should be made.
5.9,3.4.1 Radiological Monitoring, Preoperational Page 5-23 The DES states that the preoperational program will continue up to initial criticality.
Comment The statement should be changed to read "the preoperational program will continue to just before initial criticality..."
5.9.4.3 Accident _ Experience and Observed Impacts Pages 5-29, 5-31 The DES states that accidents have occurred at several nuclear facilities.
1 Conment Specific reference should be made to the Brown's Ferry fire and the fact that
! there was no core damage or any radiation' released in the fire.
5.9.4.4 Mitigation of Accident Consequences, (2) Site Features Page 5-33 i In the second paragraph the DES used 34,968 for the population of Rock Hill l
and 310,794 for the population of Charlotte.
I Comment The population of Rock Hill and Charlotte are 35,344 and 314,477, respectively.
i 5.9.4.5 Accident Risk and Impact Assessment Page 5-37 The DES states "The quantitative characteristics of the evacuation model i used for the Midland site...".
i
Comment flidland is incorrect; it should be the Catawba site.
5.14.2 Aquatic Monitoring Pages 5-50, 5-51 In the last sentence of 5-50 and its completion on 5-51 the environmental protection plan eequirements are di,scussed.
Comment The sentence needs'to be clarified to indicate that programs are set up for notification through permits and commitments to other agencies. Also, the word "on" should be changed to "or".
5.14.3 Atmospheric Monitoring Page 5-51 The DES states that the applicant is considering .... of measuring wind speed and direction on a temporary mast at a height af one tower width above the top of the structural component.
Comment This statement is inaccurate. The height of the temporary mast is not the same as the width of the tower which is 6.4 m '(21 ft). . The correct wording should be: "The applicant is considerir.g measuring windspeed and direction on a temporary mast at a height of 3.9 m (12' 8") above the top structural component.
Table 5.3 Maximum Thermal Plume Extent finder Average and Worst-Cast Conditions for the Four Seasons
- Page 5-68 This table used** 5041 ha as full pond and derived several numbers on the attached table from this basis.
Comment See Attachment 1.
f 1
9
i
- I l
1 ATTACHMENT 1 .
i Table 5.3 Maximum Thermal Plume Extent Under Average and Worst-Case Conditions for the Four Seasons
Average Conditions Worst-Case Conditions ,
4 Area Area to 2.8 C Area Area to 2.8 C to 32.2*C %
(5 F) above % to 32.2 C % (5 F) above %
-total ** total ** ambient total *** (90 F) total ***
ambient (90 F) ' lake isotherm, ' lake isotherm, lake ' isotherm, lake isotherm, area ha (acre) area ha (acre) area ha (acre) area _
Season ha (acre) 36(90) 1.0 : 0 :0 Spring 32(80) 0.6 : 0 : 0 l
0.1 14(35) 0.4 40(100) 1.1 l Summer 2(5) 0.1 2(5) i 0.4 :0 =0 24(60) 0.7 -:0 =0 i Fall 20(50) 0.9 : 0 0 Winter 30(75) 0.6 : 0. : 0 34(85) 1
- Based on full pond surface area of 5036 ha (12,445 acres).
- Based on maximum drawdown 3m (10 ft.), area of 3724.ha (9,203 acres).
I i
- - - ,a , --
, , , - - , -,_,-.-,,-,g. w -
e_&
Appendix D. Examples of Site Specific Dose Assessment Calculations Table D.6 Annual Dose Commitments to Maximally Exposed Individual near the Catawba Nuclear Station .
- Page D-10 The DES lists the nearest drinking water at Bay City.
Comment These is no Bay City near Catawba Nuclear Station.
.- Table D.8 Calculated RM-50-2 Dose Commitments to Maximally Exposed Individual i From Operation of Catawba 14uclear Station Page D-12 Footnote 3 adds Carbon-14 and tritium to the radiciodines and particulates category.
Comment Carbon-14 and tritium should be listed separately rather than included under bone dose. Additionally, doses shown in Table D.8 differ considerably from those shown in CNS-ER/0LS Table 5.2.4-1. The tables need to be reconciled.
l l
l l
l I
i
Appendix F_ l l
Pages F-1 through F-5 Consequence Modeling Considerations Comment Appendix F, " Consequence Modeling Considerations makes assumptions regarding evacuation and relocation distances, following low-probability accidents, well beyond those distances required In 10 CFR 50.33 and 10 CFR 50.47(c)(2). Appendix F assumes evacuation to 15 miles and . relocation to 25 miles, which is well outside the "about 10 miles" distance required for the plume exposure pathway emergency planning zone (EPZ).
EPZs are defined as areas for which planning is needed to assure that prompt and effective actions can be taken to protect the public in the event of an accident.
The 10 mile size represents a judgement by the EPA /NRC Task Force which authored NUREG-0396 on the extent of detailed planning which must be performed to assure an adequate response base. For most major emergency situations protective actions would be confined to small parts of the plume exposure EPZ. Only in the most serious accidents could protective actions potentially extend beyond the "about 10 mile" area.
The consequence analysis in Appendix F makes no distinction between the area in which a planning base exists and the area outside the base where ad hoc actions might be necessary, drawing upon the well developed capability inside 10 miles.
In essence this Appendix requires that detailed planning capable of alerting, notifying, transporting, and accomodating residents in those areas outside 10 miles be available and in-place prior to such a situation existing.
In summary, the capability for rapid evacuation of the public around nuclear facilities is only required to "about 10 miles". The consequence analysis should not assume otherwise, f
Appendix G Pages G-1 through G-4 Environmental Impact Appraisal for Transshipment of Spent ruel from Oconee and McGuire to Catawba Nuclear Station.
Coment The transportation of radioactive materials to and from the Catawba Nuclear Station is within the scope of 10 CFR 51.20. Pursuant to these regulations, environmental risks associated with transportation are considered to be as set forth in Table S-4.
In a prior proceeding involving Duke Power Company, the environmental impacts >
associated with transshipment of spent fuel from Oconee to McGuire were considered.
This analysis concluded that the impacts were within the values set forth in Table S-4. Inasmuch as the Oconee and McGuire shipments to Catawba are similar to the Oconee shipment to McGuire, no separate appraisal of transshipment of spent fuel is necessary and, therefore, Appendix G should be withdrawn. At most, Table G merely confirms Table S-4.
Aypendix G, 1-1, pg. G-1 The DES calculates an annual cumulative exposure to the drivers of the spent fuel truck shipments for spent fuel shipped from Oconee to Catawba to be about 19 person-rems per reactor year. For McGuire to Catawba shipments the drivers were found to receive about 16 person-rems of cumulative exposure.
Comment Duke Power Company's plans and positions regarding the proposed shipments of spent fuel from Oconee and McGuire were detailed in an April 2,1982 letter from Mr. W. O. Parker, Jr. to Mr. H. R. Denton, NRC/0NRR. The letter was written in response to Ms. Elinor G. Adensam's letter of March 8, 1982 which requested additional information related to the storage of non-Catawba fuel at the Catawba Nuclear Station. The applicable response was to question #14.
In addition, the numbers used by the Staff in their calculations are extremely overly conservative and do not reflect actual conservative assumptions. Duke Power Company's experience with shipping spent fuel from Oconee to McGuire showed that the radiation levels 2m(6ft) from the truck bed were less than 3 mrem /hr (as opposed to the Staff's assumption of the legal limit of 10 mrem /hr). The dCtual radiation levels inside the cab were less than .05 mrem /hr (as opposed to the 2 mrem /hr legal limit assumed by the Staff). Thus, using conservative radiation levels acquired from actual experience the truck drivers would have received less than 3.3 mrem of exposure during each shipment. For the postulated 300 shipm'ents of spent fuel from Oconee to Catawba the resultant annual cumulative exposure to the drivers would be less than 2 person-rems. For shipments from McGuire to Catawba the annual cumulative exposure would be even less, given the shorter route. Thus, not only is Table S-4 controlling, it is conservative.
6 k ,