3F0185-02, Monthly Operating Rept for Dec 1984

From kanterella
Revision as of 10:33, 23 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1984
ML20112F610
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
3F0185-02, 3F185-2, NUDOCS 8501150438
Download: ML20112F610 (5)


Text

%

O

.n

$3\ )- OPERATING DATA REPORT DOCKET NO. 50-302 DATE IMD COTIPLETED BY n Grnhnrn TELEPHONE (904) 795-3802 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 Notes
2. Reporting Period: 12/1/84 - 12/31/84
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA 9.' Power Level To Which' Restricted,if A'ny (Net MWe): NA

10. Reasons For Restrictions,if Any: NA This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 744 8784 68424
12. Number Of Housi Reactor Was Critical 744 8346.5 45915.7
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 744 8298.8 44917.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1715240 19697550 101661885 -
17. Gross Electrical Energy Generated (MWH) 59807L, 6800481 34727217
18. Net Electncal Energy Gec rated (MWH) 568890 6478928 32996011

' 19. Unit Se vice Factor 100 % 94.5 % 65.6 %

20. Unit Availability Factor 100 % 94.5 % 65.6%
21. Unit Capacity Factor (Using MDC Net) 93.1 % 89.8 % 60.7%
22. Unit Capacity Factor (Using DER Net) 92 7 % A9 4% 52 5 %
23. Unit Forced Outage Rate 0%- 0.9% 20.2 %
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Refueline outare scheduled to begin 3/9/85. and last 20 week <:.

25.. If Shut Down At End Of Report Period. Estimated Date of Startup: NA

26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77

, 8501150438 841231 (9/77I PDR ADOCK 05000302

- -. R ppg

a AVERAGE DAILY UNIT POWER LEVEL

. ,,~,

DOCKET NO. 50-302 UNIT FLC RP-3 DATE 1/2/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH December 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe Net) iMWe Net) 1 79I i7 673 2 795 ig 791 3- 788 19 790 4

788 790 20 5 779 21 7R1 6 779 22 786 7 787. 79g 3

8 774 24 763 782 9 25 782 10 788 26 764 11 790 27 787 12 770 28 785

^

13 786 771 29 14 777 30 766 15 580' 3 765 16 580 INSTRUCTIONS On this format,!ist the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute to the nearest whole megawart.

(9/77I

()

O
/~$ 7 .-

'd _ V ()- -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-302 UNIT NAME FLCRP-3 DATE 1/2/85 12/84 COMPLETED By S. Stewart REPORT MONTil TELEPHONE

. 3 -

c

.2 e ee s

5 m:

y 54 Eicensee 5%

5*

c Cause & Corrective 8.o Nd D8te i -5 @ 4 .is s 5 Event 7, ? Action to

" 5 E0

$E j di j Report #

f '$ Present Recurrence 6

84-33 841214 S 0.0 B 5 NA IIC IITEXCII Reduced power to clean condenser tubes.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entr> Sheets for Licensee C Refueling 3-Automatic Scram. Event Repor (LER) File (NUREG-D Regulatory Restriction 40ther (Explain) 0161)

EOperator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) Il-Other ( E xplain)

t '

e 0

- . MONTHLY OPERATIONAL

SUMMARY

. STATEMENT

.x.

U.

DOCKET NO. 50-302 ,

UNIT FLCRP-3 DATE 1/2/85 l COMPLETED BY S. Stewart TELEPHONE (904) 795-3802

.[

v MONTH- December 1984

SUMMARY

STATEMENT:- The plant operated with no outages during the month of December.

The unit was reduced in power throughout the month by steam generator operating limits to approximately 93 percent. Also reduced power once to clean condenser tubes.

- C-l~

r J

k

(

F

$ e.e+----e -

--t- yr -a g y , -+w-+< q 4 --+ir-re.r - y-t*-3---y,%- p,y.s , - . g. y e.sey-.g ms ar---ya v v n + - , ,g> y-- w - - + - - - --

i

. eeo

  • O i # g 3

=

0 ese Power C 0 APOnat eon January 8,1985 3F0185-02 Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20535 s

\

Subject:

Crystal River Unit 3 Docket No. 50-302 '

Operating License No. DPR-72 '

Monthly Operating Report ,

=

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 December 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/ /

G. R. Westafer N Manager, Nuclear Operations

' Licensing and Fuel Management AEF/feb Attachments cc: Mr. 3. P. O'Reilly ,

^

'r - Regional Administrator, Region 11 i Office of Inspection & Enforcement i f ? U.S. Nuclear Regulatory Commission i

f j/ ' 101 Marietta Street N.W., Suite 2900 '

Atlanta, GA 30323 i

i i ~

f I

- GEN ERAL OFFICE 3201 Thirty-fourt' Street h South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151