OPERATING DATA REPORT DOCKET NO.
50-302 DATE IMD COTIPLETED BY n Grnhnrn TELEPHONE (904) 795-3802 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes
- 2. Reporting Period:
12/1/84 - 12/31/84
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe):
860 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA 9.' Power Level To Which' Restricted,if A'ny (Net MWe):
NA NA
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 8784 68424
- 12. Number Of Housi Reactor Was Critical 744 8346.5 45915.7
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 744 8298.8 44917.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1715240 19697550 101661885
- 17. Gross Electrical Energy Generated (MWH)
- 59807L, 6800481 34727217
- 18. Net Electncal Energy Gec rated (MWH) 568890 6478928 32996011
' 19. Unit Se vice Factor 100 %
94.5 %
65.6 %
- 20. Unit Availability Factor 100 %
94.5 %
65.6%
- 21. Unit Capacity Factor (Using MDC Net) 93.1 %
89.8 %
60.7%
- 22. Unit Capacity Factor (Using DER Net) 92 7 %
A9 4%
52 5 %
- 23. Unit Forced Outage Rate 0%-
0.9%
20.2 %
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Refueline outare scheduled to begin 3/9/85. and last 20 week <:.
25.. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77 8501150438 841231 (9/77I PDR ADOCK 05000302
- -. R ppg
a AVERAGE DAILY UNIT POWER LEVEL
.,,~,
DOCKET NO.
50-302 UNIT FLC RP-3 DATE 1/2/85 D. Graham COMPLETED BY TELEPHONE (904) 795-3802 MONTH December 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe Net) iMWe Net) 1 79I i7 673 791 2
795 ig 3-788 790 19 788 790 4
20 5
779 21 7R1 6
779 22 786 787.
7 3
79g 8
774 24 763 782 9
25 782 10 788 26 764 11 790 787 27 12 770 28 785 13 786 771
^
29 14 777 30 766 580' 765 15 3
16 580 INSTRUCTIONS On this format,!ist the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute to the nearest whole megawart.
()
(9/77I
7.-
- O
/~$
'd _
V
()-
DOCKETNO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 1/2/85 12/84 COMPLETED By S. Stewart REPORT MONTil TELEPHONE 3
c ee 5 m:
5*
c Cause & Corrective 54 Eicensee 5%
.2 e s
y 8.o Action to f '$
Nd D8te i
-5 @
4
.is s 5 Event 7, ?
$E 5
j di j Report #
E0 Present Recurrence 6
84-33 841214 S
0.0 B
5 NA IIC IITEXCII Reduced power to clean condenser tubes.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Inst ructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entr> Sheets for Licensee C Refueling 3-Automatic Scram.
Event Repor (LER) File (NUREG-D Regulatory Restriction 40ther (Explain) 0161)
EOperator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source (9/77)
Il-Other ( E xplain)
t e
0 MONTHLY OPERATIONAL
SUMMARY
. STATEMENT
-.x.
U.
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 1/2/85 COMPLETED BY S. Stewart TELEPHONE (904) 795-3802
.[
v MONTH-December 1984
SUMMARY
STATEMENT:- The plant operated with no outages during the month of December.
The unit was reduced in power throughout the month by steam generator operating limits to approximately 93 percent. Also reduced power once to clean condenser tubes.
- C-l~
r J
k
(
F e.e+----e
--t-yr -a g y
-+w-+<
q 4
--+ir-re.r y-t*-3---y,%-
p,y.s g.
y e.sey-.g ms ar---ya v
v n +
,g>
y--
w
- - + - - - --
i eeo O
i g
3
=
0 ese Power C 0 APOnat eon January 8,1985 3F0185-02 Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20535 s
\\
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
=
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 December 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
/
/
G. R. Westafer N
Manager, Nuclear Operations
' Licensing and Fuel Management AEF/feb Attachments cc:
Mr. 3. P. O'Reilly
'r -
Regional Administrator, Region 11
^
i Office of Inspection & Enforcement i
? U.S. Nuclear Regulatory Commission
/