ML22116A115

From kanterella
Revision as of 20:34, 10 May 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC-2021-000113 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML22116A115
Person / Time
Issue date: 04/25/2022
From:
NRC/OCIO
To:
Shared Package
ML22116A113 List:
References
NRC-2021-000113
Download: ML22116A115 (7)


Text

Note to requester: The text for SECY-18-0007 is redacted under FOIA Exemption B5, Deliberative Process Privile e. The text for SECY-18-001 2 is redacted under FOIA B5 Attorne -Client Privile e.

Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Florida Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7). Appeal of SECY-17-0118 11/21/2017 Affirmation LBP-1 7-6 Proposed License to Authorize the Export of Radioactive Sources to the Republic of SECY-17-0121 12/07/2017 Notation Vote Cuba - XB 1335 Unitech Services Group, Inc Export of Low-Level Waste)(Petition Seeking Leave to SECY-18-0006 01/16/2018 Affirmation Intervene and Request for Hearinq)

SECY-18-0007 0 1/11/2018 Information (b)(5)

I Exemption Request for AP1000 Renewal SECY-18-0012 01/26/2018 Information (b)(5)1 Proposed License For The Export Of Depleted Uranium Metal Rods To The Republic SECY-18-0014 01/29/2018 Notation Vote Of Korea For Research And Development Of Fuel For Sodium-Cooled Fast Reactor -

XSOU8843 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7), Docket SECY-18-0018 02/08/2018 Affirmation Nos. 52-040-COL & 52-041-COL, Mandatory Hearinq Decision Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont SECY-18-0019 02/12/2018 Affirmation Yankee Nuclear Power Station), Requests for Hearing in License Transfer Proceeding Powertech (USA) Inc. (Dewey-Burdock lnSitu Uranium Recovery Fae.), Petition for Review of LBP-17-9, Memorandum & Order (Granting Summary Disposition as to SECY-18-0021 02/14/2018 Affirmation Contention 1B, Denying Summary Disposition as to Contention 1A , and Establishing Further Procedures)

SECY-18-0023 02/15/2018 Affirmation NextERA Energy Seabrook, LLC (Seabrook Station, Unit 1), Appeal of LBP-17-7 SECY-18-0024 02/14/2018 Notation Vote Nuclear Materials and Waste Safety Proqram and Fee Evaluation Tennessee Valley Authority(Clinch River Early Site Permit Application), Docket No. 52-SECY-18-0027 02/27/2018 Affirmation 047-ESP, Aoolicant's Aooeal of LBP-17-8.

SECY-18-0029 02/28/2018 Information (U) 2017 Annual Threat Review Implementation of the Office of the Director of National Intelligence, Security Executive SECY-18-0030 03/01/2018 Notation Vote Agent Directive 3 and National Industrial Security Program Operating Manual Change 2, Insider Threat Proqram.

Delegation of Authority to the Executive Director for Operations to Revise the SECY-18-0032 03/05/2018 Notation Vote Enforcement Policy Table of Base Civil Penalties Due to Annual Civil Monetary Penalty Adjustments Northwest Medical Isotopes, LLC (Medical Radioisotope Production Facility), Docket SECY-18-0034 03/08/2018 Affirmation No. 50-609-CP, Mandatory Hearinq Decision

Note to requester: The text for SECY-18-0050 is redacted under FOIA Exemption B5, Deliberative Process Privilege.

The text for SECY-19-0013 is redacted under FOIA B5, Attorney-Client Privilege.

2 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Entergy Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee SECY-18-0039 03/16/2018 Affirmation Nuclear Power Station) - License Transfer Proposed Agreement Between the Government of the United States of America and the SECY-18-0044 04/05/2018 Notation Vote Government of the United Kingdom of Great Britain and Northern Ireland for Cooperation in Peaceful Uses of Nuclear Enerqy SECY-18-0050 04/19/2018 Notation Vote (b)(5)

SECY-18-0051 04/24/2018 Information Status of Space Utilization at The White Flint Campus in Light of Staffing Levels Response to Staff requirements Memorandum (SRM)-COMSECY-17-0008 on Physical SECY-18-0063 06/04/2018 Notation Vote Protection for Non-Power Production and Utilization Facilities Intending to Produce Molybdenum-99 Non-Possessing Facility Clearances and Personnel Security Clearances for U.S.

SECY-18-0066 06/11/2018 Nuclear Regulatory Commission-Licensed Facilities and other Entities SECY-18-0085 08/29/2018 Notation Vote Fiscal Year 2019 Proposed Fee Rule SECY-18-0089 09/11/2018 Affirmation Motion to Quash Office of lnvestiqations Subpoena Filed By Reed Colleqe Proposed Revision to Regulatory Guide 5.69, 'Guidance for the Application of the SECY-18-0110 11/02/2018 Notation Vote Radiological Sabotage Design-Basis Threat for Nuclear Power Reactors' SECY-18-0115 11/15/2018 Information Biennial Paper - Implementation Of The Five-Year International Strateqy Powertech (USA), Inc. (Dewey-Burdock IN SITU Uranium Recovery Facility), Response SECY-18-0116 11/19/2018 Affirmation to Remand from D.C. Circuit in OGLALA SIOUX Tribe V. NRC Diversified Scientific Services, Inc. (Export of Low-Level Waste) (Petition Seeking SECY-18-0122 12/11/2018 Affirmation Leave to Intervene and Request for Hearing)

Request To Issue License Authorizing The Export Of AP1000 Reactor Coolant Pumps SECY-18-0124 12/28/2018 Notation Vote and Associated Equipment To China XR177 SECY-19-0002 01 /04/2019 Notation Vote Implementation of Chanqes to the Resident Inspector ProQram Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), LBP-18-6 SECY-19-0010 01 /22/2019 Affirmation (referred rulinq denyinq motion to disqualify Board)

SECY-19-0013 01 /30/2019 Notation Vote (b )(5)1 Proposed License to Export Radioactive Sources to Iraq for Use in Oil and Gas SECY-19-0015 01 /31/2019 Notation Vote Exploration Well Loaainq Related Activities - PXB217.00

INote to requester: The text for SECY-19-0063 is redacted under FOIA Exemption B5, Deliberative Process Privilege.

3 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont SECY-19-0019 02/15/2019 Affirmation Nuclear Power Station) - License Transfer, Withdrawls of Requests for Hearing and Petitions for Leave to Intervene Exelon Generation Co., LLC (Oyster Creek Nuclear Generating Station) Requests for S ECY-19-0022 02/25/2019 Affirmation Hearinq in License Transfer Proceedinq S ECY-19-0025 03/05/2019 Information (U) 2018 Annual Threat Review Powertech (Dewey-Burdock, In Situ Uranium Recovery Facility), Petition for SECY-19-0029 03/22/2019 Affirmation Interlocutory Review of LBP-18-5, Memorandum and Order (Denying Motions for Summary Disposition as to Contention 1A).

Proposed License To Export Radioactive Sources To Sudan For Use In Oil And Gas S ECY-19-0041 04/22/2019 Notation Vote Exploration Well Loaainq And Gauoinq Activities - PXB220.00 Request To Issue License Authorizing T he Export Of Low Enriched Uranium To The SECY-19-0042 04/24/2019 Notation V ote Republic Of Korea - XSNM3789 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1) - License Amendment, SECY-19-0045 05/03/2019 Affirmation EmerQency Petition Crow Butte Resources, Inc. (Marsland Expansion Area), Petition for Review of LBP S ECY-19-0049 05/09/2019 Affirmation 2, LBP-18-3, and Memorandum and Order Granting Summary Disposition SECY-19-0052 05/15/2019 Notation V ote United States of America National Report for the Eighth Convention on Nuclear Safety SECY-19-0054 05/23/2019 Notation V ote Update to the U.S. Nuclear Regulatory Commission's Priority Intelligence Requirements SECY-19-0057 05/28/2019 Information Reorqanization of the Office of Nuclear Material Safety and Safequards S ECY-19-0063 06/21/2019 Information I (b)(5)1 Entergy Nuclear Ops, Inc., Entergy Nuclear Gen Co. , Holtec Intl, and Holtec Decommi S ECY-19-0076 08/08/2019 Affirmation Intl, LLC (Pilgrim Nuclear Power Station) License Transfer Commonwealth of Mass Motion to Stay Proceeding Pending Settlement Neg SECY-19-0081 08/26/2019 Notation V ote Fiscal Year 2020 Proposed Fee Rule Tennessee Valley Authority (Clinch River Nuclear Site Early Site Permit Application),

SECY-19-0093 09/27/2019 Affirmation Docket No. 52-047-ESP, Mandatory HearinQ Decision Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4) - Referred S ECY-19-0098 10/04/2019 Affirmation RulinQ in LBP-19-3 and FPL's Aooeal of LBP-19-3

Note to requester: The text for SECY-19-0106 and for SECY-19-0124 are redacted under FOIA Exem tion B5 Deliberative Process Privile e.

4 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4) - Certified SECY-19-0098A 11/07/2019 Affirmation RulinQ in LBP-19-3 and FPL's Aooeal of LBP-19-3 Discontinuation of Rulemaking -Independent Spent Fuel Storage Installation Security SECY-19-0100 10/09/2019 Notation V ote Requirements Exelon Generating Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3)

SECY-19-0101 10/10/2019 Affirmation

- Bevond Nuclear's Appeal of LBP-19-5 Technical Analysis of Unmanned Aerial Vehicles for Nuclear Power Plants and SECY-19-0102 10/15/2019 Information Category 1 Fuel Cycle Facilities (U)

Entergy Nuclear Operations, Inc., Entergy Nuclear Generation Co., Holtec International, SECY-19-0105 10/28/2019 Affirmation and Holtec Decommissioning International, LLC. (Pilgrim Nuclear Power Station) -

License Transfer Proposed Licenses to Export Radioactive Materials to Iraq for Various End Uses SECY-19-0106 10/28/2019 Notation V ote XB1337, XB1339, XB1340, and PXB227.00J(b)(5) I (b)(5) I Holtec International (HI-STORE Consolidated Interim Storage Facility), Appeals of LBP-SECY-19-0116 11/22/2019 Affirmation 19-4; Motion for New Contention FirstEnergy Nuclear Operating Co. and FirstEnergy Nuclear Generation, LLC. (Beaver SECY-19-0122 12/17/2019 Affirmation Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit 1; Perry Nuclear Power Plant, Unit 1 ), Request for Hearing in License Transfer Proceeding SECY-19-0124 12/18/2019 Notation Vote (b)(5) I El Paso Electric Co. (Palo Verde Nuclear Generating Station) Request for Hearing in SECY-20-0011 02/04/2020 Affirmation License Transfer Proceeding Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of SECY-20-0012 02/04/2020 Affirmation LBP-19-7 (denial of hearing); Motion to Reopen Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of SECY-20-0012A 04/02/2020 Affirmation LBP-19-7 Fasken appeal of denial of access to SUNSI information; update for footnote reQardinQ Amended Contention 4 Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of SECY-20-0012B 08/04/2020 Affirmation LBP-19-7: Fasken Proposed New Contention Based on Draft Environmental Impact Statement Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeal SECY-20-0017 02/24/2020 Affirmation LBP-19-11 (denial of motion to file late contention)

The text for SECY-20-0058 is redacted under FOIA B5, Attorney-Client Privilege.

5 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Sierra Club SECY-20-0019 02/28/2020 Affirmation Appeal of LBP-19-9 (denying motion to amend and granting motion to dismiss}, LBP 7 (Denial of Contention)

Update Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility),

SECY-20-0019A 09/30/2020 Affirmation Sierra Club Appeal of LBP-19-9 (denying motion to amend and granting motion to dismiss), LBP-1 9-7 (Denial of Contentions)

SECY-20-0022 03/02/2020 Information (U) 2019 Annual Threat Review Entergy Nuc. Ops. Inc., Entergy Nuc. Generation Co., Holtec Intern'!, and HDI, LLC SECY-20-0023 03/18/2020 Affirmation (Pilgrim Nuclear Pwr Station) - Petitions for Intervention Entergy Nuclear Operations, Inc., Entergy Nuclear Generation Co., Holtec International, SECY-20-0023A 07/09/2020 Affirmation and Holtec Decommissioning International, LLC (Pilgrim Nuclear Power Station) -

Pilgrim Watch Petition for Intervention SECY-20-0027 03/25/2020 Affirmation Powertech (USA), Inc. (Dewey-Burdock In Situ Leach Facility); Petitions for Review UNITED STATES DEPARTMENT OF ENERGY (EXPORT OF 93.35% ENRICHED SECY-20-0028 03/26/2020 Affirmation URANIUM) (PETITIONS SEEKING LEAVE TO INTERVENE AND REQUEST FOR HEARING)

Exelon Generation Company, LLC (Three Mile Island Nuclear Station, Units 1 and 2),

SECY-20-0038 04/30/2020 Affirmation Referred Motion Relating to LBP-20-2 (Denial of Hearing Request Relating To Emergency Planning License Amendment Plan of Action for Potential Escalated Enforcement Prior to the Expiration of the Statue SECY-20-0046 05/26/2020 Information of Limitations for Tennessee Valley Authority Watts Bar Unit 1 (Office of Investigations Report No. 2-2016-042)

Southern Nuclear Operating Co. , Inc. (Vogtle Electric Generating Plant, Unit 3) Request SECY-20-004 7 05/29/2020 Affirmation for Hearing in ITAAC Proceeding, Expedited Consideration Requested DELEGATION OF ONE-TIME SIGNATURE A UTHORITY TO THE EXECUTIVE DIRECTOR FOR OPERATIONS TO ISSUE A FINAL RULE AMENDING TITLE 10 OF SECY-20-0054 06/15/2020 Notation Vote THE CODE OF FEDERAL REGULATIONS, PART 110, "EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL" SECY-20-0057 06/25/2020 Notation Vote Revised International Strateav SECY-20-0058 06/30/2020 Notation Vote (b)(5)1

6 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Status of the United States of America National Report for Seventh Review Meeting of SECY-20-0062 07/10/2020 Information the Joint Convention on the Safety of Spent Fuel Mgmt and on the Safety of Radioactive Waste Mqmt Foundations for Evidence Based Policymaking Act of 2018: Interim Learning Agenda SECY-20-0067 07/27/2020 Notation Vote Interim Capacity Assessment, and Annual Evaluation Plan Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Station Units 1, 2, &

SECY-20-0069 07/30/2020 Affirmation 3 and ISFSI), Memorandum and Order Ruling on Petitions to Intervene Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Station Units 1, 2, SECY-20-0069A 12/03/2020 Affirmation and 3 and ISFI), Memorandum and Order Ruling on Petitions to Intervene Technical Evaluation of the Security Bounding Time Concept for Operating Nuclear SECY-20-0070 07/30/2020 Notation Vote Power Plants Nuclear Development LLC (Bellefonte Nuclear Power Plant, Units 1 and 2), Request for SECY-20-0073 08/12/2020 Affirmation Hearinq in License Transfer Proceedinq FirstEnergy Companies and TMl-2 Solutions, LLC (Three Mile Island Nuclear Station, SECY-20-0077 08/21/2020 Affirmation Units 1 and 2), Petition to Intervene in License Transfer Proceeding SECY-20-0079 09/03/2020 Notation Vote Fiscal Year 2021 Proposed Fee Rule Oklo Power LLC. (Aurora Reactor)-Emergency Petition to Immediately Revoke or SECY-20-0084 09/18/2020 Affirmation Suspend Docketing Notice and Hearing Notice for Combined License Application by Oklo Power, LLC and Request for Clarification that Nuclear Energy Innovation Holtec International (HI-STORE Consolidated Interim Storage Facility), Sierra Club SECY-20-0087 09/24/2020 Affirmation Aooeal of LBP-20-6 Consultation With The Commission On Whether Violations Associated with Inaccurate SECY-20-0097 10/20/2020 Notation Vote and Incomplete Information, As Well As Deliberate Misconduct, Exist Associated with Tennessee Valley Authority DTE Electric Co.-Fermi 2 Appeal of LBP-20-7 Denial of Hearing Request Related to SECY-20-0099 10/22/2020 Affirmation SFP Lie Amendment Southern Nuclear Operating Co., Inc. (Vogtle Electric Generating Plant, Unit 3) Appeal SECY-20-0103 11/10/2020 Affirmation of LBP-20-8 Recommendations for Addressing Resident Inspector Recruitment and Retention SECY-20-0107 11/19/2020 Notation Vote Challenqes.

7 Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), lntervenors' SECY-20-0113 12/11/2020 A ffirmation Petitions for Review of LBP-19-3, LBP-19-6, and LPB-19-8 In the Matter of Joseph Shea (Order Prohibiting Involvement in NRG-Licensed Activities SECY-20-0114 12/11/ 2020 Affirmation Immediately Effective), Review of LBP-20-11 Proposed Licenses to Export ByProduct Materials to Iraq for Use In Oil and Gas SECY-20-0121 12/23/2020 Notation Vote Production Well Testing -XB1345, XB1346, XB1347 and XB1348 SECY-20-0122 12/23/2020 Notation V ote Final Draft of the Fiscal Year 2022 Annual Evaluation Plan Southern Nuclear Operating Co., Inc. (Vogtle Electric Generating Plant Unit 3); motion SECY-21-0014 02/11/2021 Affirmation to reooen Proposed License to Export a Moisture Density Gauge to Iraq for Use In Road SECY-21-0016 02/17/2021 Notation Vote Construction Activities XB 1341 Proposed License to Export Moisture Density Gauges to Iraq for use in Road SECY-21-0017 02/22/2021 Notation V ote Construction Activities - XB 1344 SECY-21-0018 02/22/2021 Information Uodate on Agencvwide Transformation Performance Measures Exelon Generating Company, LLC (Peach Bottom Atomic Power Station, Units 2 and SECY-21-0020 02/24/2021 Affirmation 3), Beyond Nuclear's Motions to Submit a New Contention and Reopen the Record Holtec International (HI-STORE Consolidated Interim Storage Facility), Fasken Land SECY-21-0022 02/26/2021 Affirmation and Minerals Appeal of LBP-20-10 and Third Motion to Reopen SECY-21-0024 02/26/2021 Information (U) 2020 Annual Threat Review SECY-21-0025 03/02/ 2021 Information Comorehensive Roadmao for the Aaencv's Lona-Term Soace Needs