- All, O"Keefe. Neil Morris. Scott: Monninger, John: Veqel. Anton: Hay. Michael: Lantz. Ryan: Miller. Geoffrey: Drake. James:
Mccraw. Aaron Dricks Victor: ~
- Taylor Nick; ~
- Haire Mark; Makris Nestor; Bloodgood Michael
- Proulx David:
Melfi. Jim; Strittmatter. Henry Comanche Peak Unit 2 Plant Trip Monday, June 7, 2021 5:40:00 PM Neil Day, resident inspector at Comanche Peak, was informed by the licensee that Unit 2 tripped due to a fire in main transformer 2MT1 at 1527 CDT. Neil is responding to the plant.
Unit 2 was at 100 percent power prior to the trip. The licensee stated that the plant responded as expected. The deluge system actuates and the fire brigade responded with a site fire truck and were able to put the fire out in 20 minutes.
No emergency was declared.
This transformer raises the output of the main generator up to grid voltage and is located outside the turbine building.
Please expect an update late today.
Nail! O'Kaa/a Chief, DRP Branch B NRC Region IV 817 200-1141 (o)
(b)(6)
C)
Sent:
Tuesday, June 8, 2021 6:32 PM To:
O'Keefe, Neil; Strittmatter, Henry; Melfi, Jim
Subject:
FW: 2 MT1 Plan
~T_h_e -p-ag_e_a_tt-ac_h_m-en-t-is- \\-,.,1-*th-h-el-d-in-i-ts_e_n-ti1--e-ty-~
Attachments:
2MT1 Failure.docx under FOIA exemption 3 in conjunction with 16 USC 8240-l and FOIA exemption 4.
This is their testing plan for 2MT1. They are bringing 2 vendors (ABB and Primoris) onsite to perform the inspections.
They estimated about a day and a half for the inspections on 2MT1, and they haven't arrived onsite yet.
From: Marzloff, Al <AI.Marzloff@luminant.com>
Sent: Tuesday, June 8, 2021 4:37 PM To: Ellegood, John <John.Ellegood@luminant.com>; Day, Neil <Neil.Day@luminant.com>
Subject:
2MT1 Plan John and Neil, I have enclosed a document Bryan Keathly, our Switchyard Coordinator provided that outlines expected tests to be performed on 2MT1 and then on 2MT2. We will also perform a core ground t est (not shown) as the first test in the sequence. Please let OCC know if there are any questions. ABB will be the vendor performing the testing. We expect to start as soon as they are mobilized at the station.
- Thanks, Al
From:
To:
Cc:
Subject:
Date:
Hello Neil:
Moreno Angel O"Keefe. Neil Hay. Michael Comanche Peak, Unit 2 - Status?
Tuesday, June 8, 2021 10:36:05 AM Can you please keep me updated on the Comanche Peak, Unit 2 trip/fire?
I've shared the recent event report with congressional stakeholders which may trigger some inquiries.
- Thanks, Angel D. Moreno Congressional Affairs Officer Office of Congressional Affairs U.S. Nuclear Regulatory Commission 301.415.1697 (w)
!{b)(6)
!(c) angel moreno@nrc gov
From:
~
To:
Ellegood. John; Proulx, David; Strittmatter. Henry: O"Keefe. Neil;.t:1e!fi,_Jjm; Reyna. Lenora; Galvin. Dennis:
Subject:
Baca. Bernadette CP Plant Status Date:
Tuesday, June 8, 2021 8:39:00 AM Attachments:
Pies from U2 Trio Resoonse Walkdowns.msQ RE Comanche Peak Uoit 2. Plant Trip.msg 6/8/ 2021
~
llni1..1 l.!ni1.2 Power Level:
(b)(3)16 USC§ 8240-l, (b)(4)
Mode:
Risk:
Green Green TTB:
NIA NA Sbocl l:luca!io IS Sbu!COlti '1'-lio lllateme lll' Unit IS AQI Qesccii;itio Notable Events and AQtivities Issues of interest.
Unit 2 ICbX3) 16 USC.§ 8240-l, (bX4) afternoon. See attached email for response.
(bX3) 16 USC§ 8240-l (b)(4) today. ICb)(3) 16 us c.§ 8240-1. (b)(4) now there are 3 options:
- 1. (b)(3) 16 U.S.C.§ 8240-l, (b)(-1)
- 2.
- 3.
Obviousl~Cb)(3)J6 us c.§ 8240-1, (b)(4) will follow. As of now Ops is holding in Mod 6~
r
~
(b)(3):16 U.S.C.§ 8240-l, (b)(-1) performing\\
(b)(3) 16 USC§ 8240-l, (b)(4) lyesterday
\\
/ by the end of I As of l and schedules I
\\ Ops is
(b)(3)16 U.S.C.§ 8240-l, (b)(4)
Neil is onsite this afternoon has...
l(b_)(_6l_... ~his morning, John is in area but l(b)(6) lthis week.
From:
To:
Subject:
Date:
~
O"Keefe. Neil: Ellegood. John: Strittmatter, Henry: ~
Pies from U2 Trip Response Walkdowns Monday, June 7, 2021 10:41:14 PM Please see the attached R4 DRP CP SharePoint site. Its buried in there somewhere.
Good luck finding it (b)(7)(F)
- Thanks, Neil Day
From:
Day, Neil Sent:
Tue, 8 Jun 2021 02:28:48 +0000 To:
O'Keefe, Neil;Morris, Scott;Monninger, John;Vegel, Anton;Hay, Michael;Lantz, Ryan;Miller, Geoffrey;Drake, James;McCraw, Aaron;Ellegood, John Cc:
Dricks, Victor;Maier, Bill;Taylor, Nick;Haire, Mark;Makris, Nestor;Bloodgood, Michael;Proulx, David;Melfi, Jim;Strittmatter, Henry
Subject:
RE: Comanche Peak Unit 2 Plant Trip Attachments:
[External_Sender] U2 2MT1 Fault and Reactor Trip Data, IMG_1859.J PG
- Team, The residents arrived onsite to verify the plant was stable following the automatic reactor trip.
The Unit 2 Generator Lockout Relays were actuated due to the issue with the Unit 2 Main Transformer (2MT1 ). This caused the U2 Main turbine to trip, and since the Reactor was at 100% caused an automatic reactor trip (>50% Rx power turbine trip). The cause of the Transformer issue is under investigation (e.g. fault, grid lightning strike, etc.). There were no precursor alarms of note with respect to issues with the transformer.
Attached is a picture of the 2MT1 main transformer. Note the top center bushing is severely damaged. Pieces of this bushing were scattered in the yard area.
The control room received a report of the fire from individuals in the field at 1527 (concurrent with the automatic trip). The deluge suppression actuated, and the fire brigade responded. The fire was reported out at 1546.
The licensee did not declare any emergencies due to the fire. The residents reviewed the EALs and interviewed Operations Personnel. Based on the location and duration of the fire, that appears to be the right determination (HU4 in the EALs).
The residents will be following up on the licensee's investigations and repairs. They are currently in Mode 3 and have the OCC staffed.
- Thanks, Neil Day From: O'Keefe, Neil <Neil.O'Keefe@nrc.gov>
Sent: Monday, June 7, 20214:41 PM To: Morris, Scott <Scott.Morris@nrc.gov>; Monninger, John <John.Monninger@nrc.gov>; Vegel, Anton
<Anton.Vegel@nrc.gov>; Hay, Michael <Michael.Hay@nrc.gov>; Lantz, Ryan <Ryan.Lantz@nrc.gov>;
Miller, Geoffrey <Geoffrey.Miller@nrc.gov>; Drake, James <James.Drake@nrc.gov>; Mccraw, Aaron
<Aaron.McCraw@nrc.gov>
Cc: Dricks, Victor <Victor.Dricks@nrc.gov>; Maier, Bill <Bill.Maier@nrc.gov>; Taylor, Nick
<Nick.Taylor@nrc.gov>; Day, Neil <Neil.Day@nrc.gov>; Haire, Mark <Mark.Haire@nrc.gov>; Makris, Nestor <Nestor.Makris@nrc.gov>; Bloodgood, Michael <Michael.Bloodgood@nrc.gov>; Proulx, David
<David.Proulx@nrc.gov>; Melfi, Jim <Jim.Melfi@nrc.gov>; Strittmatter, Henry
<Henry.Strittmatter@nrc.gov>
Subject:
Comanche Peak Unit 2 Plant Trip
- All, Neil Day, resident inspector at Comanche Peak, was informed by the licensee that Unit 2 tripped due to a fire in main transformer 2MT1 at 1527 CDT. Neil is responding to the plant.
Unit 2 was at 100 percent power prior to the trip. The licensee stated that the plant responded as expected. The deluge system actuates and the fire brigade responded with a site fire truck and were able to put the fire out in 20 minutes.
No emergency was declared.
This transformer raises the output of the main generator up to grid voltage and is located outside the turbine building.
Please expect an update late today.
N oU! O' Koolo Chief, DRP Branch B NRC Region IV (817) 200-1141 (o)
!(b)(6)
!( C )
From:
Sent:
To:
Subject:
Attachments:
See Attached Woods, Sean Mon, 7 Jun 2021 23:38:59 +0000 Day, Neil
[External_Sender] U2 2MT1 Fault and Reactor Trip Data U2 2MT1 Transformer Fault and Reactor Trip Data.pdf The attached 18 pages have been withheld in their entirety under FOIA exemption 3, in conjunction with 16 USC 8240-l, and exemption 4.
e, including any attachme n
r the a this message, be advised that r
use of this ply message and delete this e stem.
From:
To:
Subject:
Date:
Taylor Nick O"Keefe. Neil FW: Emailing: JMG_l859.JPG Tuesday, June 8, 2021 8:55:08 AM Sam voted from California - but no answers (See below).
From: Graves, Sam <Samuel.Graves@nrc.gov>
Sent: Tuesday, June 08, 2021 8:52 AM To: Taylor, Nick <Nick.Taylor@nrc.gov>; R4DRS-EB2 <R4DRS-EB21@nrc.gov>
Subject:
Re: Emai ling: IMG_1859.JPG I cannot tell from the picture. I would need more inspection.
Sam From: Taylor, Nick <Nick Taylor@nrc gov>
Sent: Tuesday, June 8, 2021 8:31 AM To: R4DRS-EB2 <R4DRS-EB2l@nrc.gov>
Subject:
Emailing: IMG_1859.JPG For the EEs out there, Neil is asking if we ca n te ll from this pict ure whether a lightning strike is a plausible cause, or if it's just a catastrophic failure of the center bushing? Or other?
If you can"t tel l don't guess...
Nick
From:
To:
Cc:
Subject:
Date:
Attachments:
Miller Geoffrey Alexander. Ryan Hedger. Sean: O"Keefe. Neil: Lantz. Ryan: Haire. Mark RE: Comanche Peak Unit 2 Plant Trip Tuesday, June 08, 2021 7:06:00 AM imaqe002.png imaae006 one These two attachments are the embedded graphics appearing on these two pages.
Thank you. Ryan!
From: Alexander, Ryan <Ryan.Alexander@nrc.gov>
Sent: Tuesday, June 08, 2021 6:53 AM To: Miller, Geoffrey <Geoffrey.Miller@nrc.gov>; Lantz, Ryan <Ryan.Lantz@nrc.gov>; Haire, Mark
<Mark.Haire@nrc.gov>
Cc: Hedger, Sean <Sean.Hedger@nrc.gov>
Subject:
RE: Comanche Peak Unit 2 Plant Trip Leadership:
In reviewing the information provided as well as the Event Report (https://www.nrc.gov/readjng-rm/doc-collectjons/event-status/event/en.html#en55295) for t he Comanche Peak U2 Main Transformer fire yesterday, I agree with t he Resident's assessment t hat NO EMERGENCY ACTION LEVEL declaration was warranted for t his event. The two POTENTIAL EALs applicable to this event would have been HU4. l or HU4.4 (copied below):
HU4.1 Unusual Event A FIRE 1s not extlnguisheOUld CMd..-. !he -,t i:,rompcl)o upotidtc,e,,-.qlNI....,_ lime,_
~
-.celldCld o, Ml IMty be aX0NCled Table H*1 Aro Artas
- v,Co~lrmenl y,Safeguerds Buildl'lg
- X-AuJOliary Building
- X-Electncat & ConlrOI Bulding
- X-Fuel Budding
- X-Sef'\\11011 Water Intake Sttucklre
- 1tDttsel Gener110r BUiking
- 1t-Normal SWcct,gear Rooms 1tCST
- v,,RWST Mode Appllcabllty:
All
EAL:
HU4.4 UnuguaJ Event A FIRE within the ISFSI or plant PROTECTED AREA that requtres l1refightmg support by an offsite fire response agency 10 extngulsl'I Moct. Appllcablllty:
All However, while the fire appears to existed for ~19 minutes, it was NOT located in any of the Table H-1 areas. Additionally, while the information received via Bill Maier from the Texas DSHS (attached) states that the Somervell County Fire Department (SCFD) was notified and were on standby outside the security gate if needed, the CP fire brigade was able to extinguish the fire and the SCFD was not activated.
I reviewed other CP EALs and based on the current information see no other applicable conditions for consideration of EAL entry.
Ryan D. Alexander Sr. Emergency Preparedness Inspector US NRC, Region IV Office: 817-200-1195 From: M iller, Geoffrey <Geoffrey Miller@nrc gov>
Sent: Tuesday, June 8, 2021 6:12 AM To: R4DRS-BC <R4DRS-BC1@nrc.gov>; Alexander, Ryan <Ryan.Alexander@nrc.gov>; Hedger, Sean
<Sean Hedger@nrc gov>
Subject:
FW: Comanche Peak Unit 2 Plant Trip FYI From: Day, Neil <Neil,Day@nrc.gov>
Sent: Monday, June 07, 2021 9:29 PM To: O'Keefe, Neil <Neil.O'Keefe@ nrc.gov>; Morris, Scott <$cott.Morris@nrc.gov>; Monninger, John
<John.Monninger@nrc.gov>; Vegel, Anton <Anton.Vegel@nrc.gov>; Hay, Michael
<Michael.Hay@nrc.gov>; Lantz, Ryan <Ryan Lantz@nrc.gov>; Miller, Geoffrey
<Geoffrey.Miller@nrc.gov>; Drake, James <James Drake@nrc gov>; Mccraw, Aaron
<Aaron.McCraw@nrc.gov>; Ellegood, John <John Ellegood@nrc.gov>
Cc: Dricks, Victor <Victor.Dricks@nrc.gov>; Maier, Bill <Bill.Maier@nrc.gov>; Taylor, Nick
<Nick Jaylor@nrc gov>; Haire, Mark ; Makris, Nestor
<Nestor.Makris@nrc.gov>; Bloodgood, Michael <Michael Bloodgood@nrc gov>; Proulx, David
<David.Proulx@nrc.gov>; Melfi, Jim <Jim.Melfi@nrc.gov>; Strittmatter, Henry
<Henry.Strittmatter@nrc.gov>
Subject:
RE: Comanche Peak Unit 2 Plant Trip
- Team, The residents arrived onsite to verify the plant was stable following the automatic reactor trip. The Unit 2 Generator Lockout Relays were actuated due to the issue with the Unit 2 Main Transformer (2MT1 ). This caused the U2 Main turbine to trip, and since the Reactor was at 100% caused an automatic reactor trip (>50% Rx power turbine trip). The cause of the Transformer issue is under investigation (e.g. fault, grid lightning strike, etc.). There were no precursor alarms of note with respect to issues with the transformer.
Attached is a picture of the 2MT1 main transformer. Note the top center bushing is severely damaged. Pieces of this bushing were scattered in the yard area.
The control room received a report of the fire from individuals in the field at 1527 (concurrent with the automatic trip). The deluge suppression actuated, and the fire brigade responded. The fire was reported out at 1546.
The licensee did not declare any emergencies due to the fire. The residents reviewed the EALs and interviewed Operations Personnel. Based on the location and duration of the fire, that appears to be the right determination (HU4 in the EALs).
The residents will be following up on the licensee's investigations and repairs. They are currently in Mode 3 and have the OCC staffed.
- Thanks, Neil Day From: O'Keefe, Neil <Neil.O'Keefe@nrc.gov>
Sent: Monday, June 7, 2021 4:41 PM To: Morris, Scott <Scott.Morrjs@nrc gov>; Monninger, John <John.Monnjnger@nrc.gov>; Vegel, Anton <Anton.Vegel@nrc.gov>; Hay, Michael <MichaeLHay@nrc.gov>; Lantz, Ryan
<Ryan Lantz@nrc gov>; Miller, Geoffrey <Geoffrey Miller@nrc gov>; Drake, James
<James.Drake@nrc gov>; Mccraw, Aaron <Aaron.McCraw@nrc gov>
Cc: Dricks, Victor <Victor Dricks@nrc gov>; Maier, Bill <Bill Maier@nrc gov>; Taylor, Nick
<Nick.Taylor@nrc.gov>; Day, Neil <NeiLDay@nrc.gov>; Haire, Mark : Makris, Nestor <Nestor Makrjs@nrc.gov>; Bloodgood, Michael <Michael.Bloodgood@nrc.gov>; Proulx, David <David Proulx@nrc gov>; Melfi, Jim <Jim Melfi@nrc.gov>; Strittmatter, Henry
<Henry Strjttmatter@nrc gov>
Subject:
Comanche Peak Unit 2 Plant Trip
- All, Neil Day, resident inspector at Comanche Peak, was informed by the licensee that Unit 2 tripped due to a fire in main transformer 2MT1 at 1527 CDT. Neil is responding to the plant.
Unit 2 was at 100 percent power prior to the trip. The licensee stated that the plant responded as expected. The deluge system actuates and the fire brigade responded with a site fire truck and were able to put the fire out in 20 minutes.
No emergency was declared.
This transformer raises the output of the main generator up to grid voltage and is located outside the turbine building.
Please expect an update late today.
Nell O'Kee/e Chief, DRP Branch B NRC Region IV (817) 200-1141 (o)
!(b)(6)
I ( C )
(b)(3)!6 U.S.C.§ 8240-I, (b)(4} -
From:
~
To:
Ellegood. John; Proulx, David; Strittmatter. Henry: O"Keefe. Neil;.t:1e!fi,_Jjm; Reyna. Lenora; Galvin. Dennis:
Subject:
Date:
6/9/2021
~
Power Level:
Mode:
Risk:
TTB:
Baca. Bernadette CP Plant Status Wednesday, June 9, 2021 8:31:00 AM J..!ni1..1 (b)(3) 16 U S.C.§ 8240-l, (bX4)
Green NIA Sboct C!u[atio IS Sbutdow ai;;tio stateme t:r
!.!nil IS AOT C!esi;;riQtio
~otable E11eots aod 8i;;ti11ities Issues of interest.
Uni~(b)(3) 16 U.S C.§ 8240-I, (b)(4) afternoon. See attached email for response.
!J.ni1.2 Green NA (bX3) 16 USC§ 8240-l, (b)(4) today. ICb)(3)16 u.s.c.§ 8240-1. (b)(4) now there are 3 options:
- 1. (b)(3)16 U.S.C.§ 8240-l, (b)(4)
- 2.
- 3.
Obviously1Cb)(3)16 u.s.c.§ 8240-1 (b)(4) will follow. As of now Ops is holding in Mod~
UPDATE 6/9 lis tagged out.\\
(b)(3):16 U.S.C.§ 8240-l, (b)(4)
(b)(3)16 U.S.C.§ 8240-l, (bX4) enter it when the~Cb)(3)I6 u.s.c.§ s240-I (b) I lyesterday
/ by the end of I. As of I and schedules I
I I Looks like we (b)(3) 16 U.S C.§ 8240-l. (b)(4)
I Will remain l~~Jp6 lJ s.c ~ ~240-1. (b) I (b)(3)16 U.S.C.§ 8240-I, (b)(4)
(b)(3) 16 U.S.C.§
- 8~4o**l: (b)(4)
(bX3) 16 U.S.C.§ 8240-l, (bX4)
Neil is onsite th is afternoon John is in area but...
l(b_)(_6l _ __.~his week.
From:
To:
Subject:
Date:
O"Keefe Neil
~
RE: Comanche Peak Unit 2 Transformer Update Wednesday, June 9, 2021 8:29:00 AM I don't know, but critters don't usually cause insulator bushings to explode, so I wouldn't place any money on that theory... The birds at WC caused a small fire, which seems logical for a bird nest.
From: Melfi, Jim <Jim.Melfi@nrc.gov>
Sent: Wednesday, June 9, 2021 8:27 AM To: O'Keefe, Neil <Neil.O'Keefe@ nrc.gov>
Subject:
RE: Comanche Peak Unit 2 Transformer Update Has the licensee ruled out some biological induced short? That is, a critter getting into/around the transformer?
From: O'Keefe, Neil <Neil.O'Keefe@nrc.gov>
Sent: Wednesday, June 09, 2021 8:25 AM To: Galvin, Dennis <Dennis Galvin@nrc gov>; Moreno, Angel <Angel Moreno@nrc gov>; Dricks, Victor <Victor.Dricks@nrc.gov>; Maier, Bill <Bill.Maier@nrc.gov>; Ellegood, John
<John Ellegood@nrc gov>; Day, Neil <Neil Day@nrc gov>; Drake, James <James Drake@nrc gov>
Cc: Taylor, Nick <Nick Taylor@nrc gov>; Graves, Sam <Samuel Graves@nrc gov>; Melfi, Jim
<Jim Melfi@nrc gov>; Strittmatter, Henry <Henry Strjttmatter@nrc gov>
Subject:
Comanche Peak Unit 2 Transformer Update
- All, The licensee is still in an investigation effort to figure out what happened to cause the fire and the trip. Oil samples show normal conditions, so the transformer is probably not damaged internally. The licensee has ABB onsite to do 24-36 hours of testing with a goal of understanding whether the transformer can be repaired.
In parallel, the licensee is planning what would need to be done to replace both of the current transformers (it takes two matching transformers to carry the full generator output load). The spares on site were previously installed in Unit 2 but were replaced with the current ones to support the greater capacity when the unit was approved for a power uprate. This means that if the old transformers are installed, Unit 2 will not be able to run at full capacity (though the difference if not huge).
It is also possible to disconnect that problem transformer and run at 50-60% power while repairing or replacing the damaged transformer.
We should learn more tomorrow.
N oil! o* Koo/a Chief, DRP Branch B NRC Region IV
(817) 200-1141 (o) l(b)(6)
!( c )
From:
~
To:
Ellegood. John; Proulx, David; Strittmatter. Henry: O"Keefe. Neil;.t:1e!fi,_Jjm; Reyna. Lenora; Galvin. Dennis:
Subject:
Date:
6/10/ 2021 Baca. Bernadette RE: CP Plant Status Thursday, June 10, 2021 8:00:00 AM
~
!.!niL1 J.!.ni1...2 Power Level:
(b)(3) 16 U.S.C.§ 8240-l Mode:
Risk:
Green Green TTB:
NIA NA Sboct C!u[atio IS Sbutdow ai;;tio stateme t:r
!.!nil IS AQI Qesi;;rii;2tion (b)(3)16 U.S C § 8240-l, (b)(4)
~otable E11eots aod 8i;;ti11ities Issues of interest.
Unitl(b)(3)16 U_S C § 8240-l (b)(4)
I yesterday afternoon. See attached email for response!
I (b)(3) 16 U.S C.§ 8240-l, (b)(4)
\\by the end of today. ICb)(3) 16 us c.§ 8240-1. (b)(4)
I. As of now there are 3 options:
- 1. (b)(3):16 U.S C.§ 8240-l, (b)(4)
- 2.
- 3.
ObviouslyICb)(3) 16 u_s c _§ 8240 1 (b)(4)
I and schedules will follow. As of now Ops is holding in Mod~
l* """"'"""*~------........
UPDATE 6/10 (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I performed by the vendor1Cb)(3)16 u.s.c.§ 8240-1. (b)(4)
I (b)(3)16 USC_§ 8240-l (b)(4)
I. They changed their path due to input from the vendor. So today thev will be I (b)(3) 16 U.S C.§ 8240-I, (b)(4)
IThey expect the (b)(3):16 U_S.C.§ 8240-I, (b)(4)
I to be complete ICb)(3) 16 u_s_c_§ 8240-1, (b)(4)
Ito be completeICb)(3)16 u.s c.§ 8240-1, (b)(4)
~hen the vendor will (b)(3) 16 US c.§ 824o**l*;-(b)(4)
(b)(3)16 U.S.C.§ 8240-I, (b)(4)
I that will be complet
- andwi11 *---
have the results for decisions on the 3 options. G If th d
'd t 1~;))(3):16 U.S.C.§ 8240-I, ey ec1 e o
- 4) lthat options looks... (b_)(3)16 U.S.C.§ I Q~jn_ 1 (h)/.!)
(b)(3)16 U.S.C.§ 8240-I, (b)(4)
If thev needl(b)(3)16 u.sc.§ 8240-1, (b)(4) lthat schedule goes (b)(3)16 U.S.C.§ I
no (b)(3)16 U.S.C.§ 8240-I, (b)(4)
Nei l is onsite this afternoon John is in area butl(b)(6)
~ his week.
(b)(3) 16 U.S.C.§
* ---------**-*-*-*-*-**** 8240-l, (b)(4)
From:
To:
Subject:
Date:
- Aaron, Q"Keefe Neil Mccraw. Aaron RE: Comanche Peak Unit 2 Path Forward Thursday, June 10, 2021 4:33:00 PM Both Comanche Peak units each have a pair of 3-phase transformers. It takes both to be able to put out the full electrical capacity the plant can generate.
If they do a temporary modification to remove the damaged transformer from service (and confirm the other transformer is undamaged, which is still being tested), they could run on the one remaining transformer and it could handle 50-60% of the full output.
Obviously, the peak power season in Texas is upon us, and they would not want to limit their output like that long-term, so this is not their favorite option. As of this morning, all the testing is not done yet, but none of the initial tests have caused them to rule out repairing the damaged transformer. They should be getting close to knowing if they can repair it Friday or Saturday.
Neil From: Mccraw, Aaron <Aaron.McCraw@nrc.gov>
Sent: Thursday, June 10, 20211:03 PM To: O'Keefe, Neil <Neil.O'Keefe@ nrc.gov>
Subject:
Comanche Peak Unit 2 Path Forward Hi Neil, Forgive me for not being to attend Region IV's morning safety meeting this morning. I was just reviewing the notes and read the last line: "One option will require derating the unit and the other will limit power to 50-60%." The derating option, correct me if I'm wrong, is installing a spare, but older transformer at the site (Scott mentioned this at another meeting yesterday). What would the "limit power to 50-60%" option entail?
- Thanks,
-Aaron Aaron T. Mccraw Executive Technical Assistant - Regions (Rotation)
Office of Executive Director for Operations U.S. Nuclear Regulatory Commission Region Ill Office: (630) 829-9650 Cell: l(b)(6)
I E-mail: Aaron.McCraw@nrc gov
From:
~
To:
Ellegood. John; Proulx, David; Strittmatter. Henry: O"Keefe. Neil;.t:1e!fi,_Jjm; Reyna. Lenora; Galvin. Dennis:
Subject:
Date:
6/11/2021
~
Power Level:
Mode:
Risk:
TTB:
Baca. Bernadette RE: CP Plant Status Friday, June 11, 2021 8:56:00 AM
.!..!ni1..1 (b)(3) 16 U.S.C.§ 8240-l Green NIA Sboct C!u[atio IS Sbutdow ai;;tio statemf t:r
!.!nil IS AOT C!esi;;riQtio
~otable E11fts aod 8i;;ti11ities Issues of interest.
Unitl(b)(3)16 u.s.c.§ 8240-1, (b)(4) afternoon. See attached email for response.
!J.ni1.2 Green NA I
(b)(3) 16 USC.§ 8240-l, (b)(4) today. l(b)(3)J6 u.s.c.§ 8240-1, (b)(4) now there are 3 options:
- 1. (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
- 2.
- 3.
Obviouslyl(b)(3) 16 u.s.c.§ 8240-1, (b)(4) will follow. As of now Ops is holding in Mod~ -+
u PDA TE 6/10 - l(b)(3)16 U.S.C.§ 8240-l, (b)(4) performed by the vendorl(b)(3) 16 us c § 8240-1. (b)(4)
I yesterday py the end of I-As of I and schedules I
I (b)(3)16 U.S.C.§ 8240-l, (b)(4) 1 They changed their path due to input from the vendor. So today they will be /
(b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I They expect the (b)(3) 16 U.S C § 8240-l, (b)(4)
I to be complete l(b)(3)16 U.S.C.§ 8240-l, (b)(4)
Ito be complet~ (b)(3) 16 USC.§ 8240-l, (b)(4)
I (b)(3) 16 U.S C.§
"
- 824o*l*;(b)(4)
(b)(3)J6 U.S.C.§ 8240-l, (b)(4)
I that will be completG andwiH
- have the results for decisions on the 3 options.
(b)(3)J6 U.S.C.§ 8~4o*l;(b)(4)
UPDATE 6/11 - Thinas overall oroaressina as discussed (b)(3)16 U.S.C.§ 8240-l, (b)(4)
(b)(3)!6 U.S.C.§ 8240-l, (b)(4) l(all tests at this point were tine though).
If they decide tol~)(~t16 u.s.c.§ 8240-1* lthat options looks 1~)(3),16 u.~:c.§ (b)(3)16 U.S.C.§ 8240-l, (b)(4)
I If thev need tolCb)(3)J6 u.s.c.§ s2-to-1, Cb)C4)
I that schedule goes (b)(3)16 U.S.C.§ I 8240-l, (b)(4)
(b)(3)16 U.S.C.§ 8240-l, (b)(4)
Neil is WAH this morni ng, John is in area but ~
his week.
From:
~
To:
Ellegood. John; Proulx, David; Strittmatter. Henry: O"Keefe. Neil;.t:1e!fi,_Jjm; Reyna. Lenora; Galvin. Dennis:
Subject:
Baca. Bernadette RE: CP Plant Status Date:
Monday, June 14, 2021 8:42:00 AM 6/14/ 2021
~
Unii.1 Uni1..2 Power Level:
(b)(3) 16 U.S C.§ 8240-I, (b)(4)
Mode:
Risk:
ADMIN Yellow Green TTB:
NIA NA Short Duration TS Shutdown action statements:
!..!ni1 IS Description Notable Events and Activities Issues of interest.
Hands off declared vesterday. lCbl<3P 5 u.s.c.§ 8240-1* Cbl<4l
~~3) 16 U.S C.§ 8240-I (b) I Planned ad min yellow risk fo~~~\\:t16 u.s.c.§ 8240*1* I Ad min yellow.
(b)(3) 16 USC.§ 8240-I, (bX4)
UnitlCb)(3)16 u.s c.§ 8240-1, (b)(4) afternoon. See attached email for response.I (b)(3) 16 USC.§ 8240-l, (b)(4) lyesterday I by the end or today. The only real activity done so far was to get an oi l sample. As of now there are 3 options:
- 1. (b)(3)16 U.S.C.§ 8240-I, (b)(4)
- 2.
- 3.
Obvious1JCbX3) 16 u.s C.§ 8240 1* (b)(4)
I and schedules will follow. As of now Ops is holding in ModtJ (b)(3) 16 U.S C.§
+--------- 824o*l;(b)(4)
(b)(3)16 U.S.C.§ 8240-I (b)(4)*
UPDATE 6/10 (b)(3) 16 U S C § 8240-I, (b)(4) performed by the vendorlCbX3) 16 u.s.c.§ 8240-1, (b)(4)
(b)(3)16 U.S C.§ 8240-I, (b)(4)
- 1. They chanaed their oath due to input from the vendor. So today they will bd (b)(3)16 USC§ 8240-I, (b)(4)
I They expect the (b)(3):16 U.S.C.§ 8240-I, (b)(4)
I to be completelCb)(3)16 us c § 8240-1, (b)(4)
I to be complete (b)(3)16 USC.§ 8240 I (b)(4)
I
.............. -, ~:16_u.sg§~~49J,C\\>ll thatwiHbecornplet and will have the results tor dec1s1ons on the 3 options.
UPDATE 6/11 - Thinqs overall proqressinq as discussed (b)(3) 16 U.S.C.§ 8240-I, (b)(4)
(b)(3) 16 U.S.C.§ 8240-I, (b)(4) l(all tests at this point were fine though).
UPDATE 6/14 ~
(b)(3)16 U.S.C.§ 8240-I, (b)(4)
If they decide tq ~;;!; 16 us C § 8240-l,
!that options look:sj~)<3P 6 u.s.c.§ 1.dn_ 1
/1..."\\/1"\\
from start of decision and starting mod implementation.
If they need to (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
!that schedule goes I
(b)(3)16 USC§ 8240
-1, (b)(4)
(b)(3) 16 U.S C § 8240-I, (b)(4)
On Saturday ~Cb)(3)16 u.s.C§ 8240-1, Cb)(4)
(b)(3) 16 U.S.C.§ 8240-I, (b)(4)
I Welcome back John. John will be in the office today and Neil Day will be WAH. Expecting Hedger this week for EP Pis and Neil 0'Keefe tomorrow and Scott Morris on Thursday.
From:
Ellegood John To:
~
- Proulx. David; Strittmatter. Henry
- Q"Keefe. Neil; ~
- Reyna. Lenora; Galvin. Pennis; ~
Bernadette Cc:
Hedger. Sean
Subject:
CP Plant Status Date:
Wednesday, June 16, 2021 2:05:29 PM 6/ 15/2021
.s.tat.u..s..;
.!.!niU
!J.ni1.2 Power Level:
(b)(3) 16 U.S C.§ 8240-l, (bX4)
Mode:
Risk:
Green Green TTB:
N/A NA SbQct l:!ucatiQ IS SbutdQW aQtiQ stat~cmrnts*
.I.J..oi.t IS AQI l:!~SQ[il21iQD I
I i'::lQtable E~etl2 ad 8Qti~itiel2 Issues of interest.
Hands off declared; article in news on the CP fire.
UnitlCb)(3)16 us c § 8240-1 (b)(4)
I yesterday afternoon. See attached email for response\\
I (b)(3)16 U.S c.§ 8240-I, (b)(4)
I by the end of today. 1Cb)(3)16 u.s c.§ 8240-1. (b)(4)
I As of now there are 3 options:
- 1. (b)(3) 16 U.S.C.§ 8240-I. (b)(4)
- 2.
- 3.
Obviousl~(bX3)16 u.s.c.§ 8240-1, CbX4)
I, and schedules will follow. As of now Ops is holding in Modef
+ * '** ""'"""'"'""'""".....................
UPDATE 6/10 - 1Cb)(3)16 U.S.C.§ 8240-I, (b)(4)
I performed by the vendor 1Cb)(3) 16 u.s.c.§ 8240-1, Cb)C4)
I (b)(3) 16 USC.§ 8240-l, (bX4)
~ They changed their path due to input from the vendor. So today they will be\\
(bX3) 16 USC§ 8240-l, (b)(4)
I I ney expect the (b)(3) 16 U.S C.§
- ******1l:24o*l;(b)(4)
(b)(3) 16 U.S.C.§ 8240-l (b)(4}" *
- 0 be completelCb><J) 16 u.s.c.§ 8240-1, CbX4)
I to be completelCbXJ) 16 us c § 8240-1, Cb)C4J rto be completelCbJ<JP6 u.s c § s240-1 CbJ(4)
(bJ(3)16 u.s.c.§ s240-1. CbX4J I that will be completef.__:J andwHL have the results for decIsIons on the 3 options.
UPDATE 6/11 - Thinas overall oroaressina as discussed (b)(3) 16 U S.C.§ 8240-l. (b)(4)
(b)(3):16 U.S.C.§ 8240-l, (b)(4) l(all tests at this point were fine though).
UPDATE 6/14 -1 (b)(3) 16 U.S.C.§ 8240-l, (bX4)
UPDATE 6/15 - Only real update to report isl (b)(3)16 U.S C.§ 8240-l, (b)(4)
Update 6/16- /
(b)(3) 16 U.S C§ 8240-l, (b)(4)
\\with help from corporate.
If they decide tq CbXJJ 16 u.s.c.§ s2-10-1.
Ith t
- t.
1 k:s~)(3) 16 u.s.C.§ a op ions 00 1Jn.1 ILV.1\\
(b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I If they need tolCbXJJ 16 u.s.c.§ 8240-1. CbX4J
!that schedule goes (b)(.J) H, U.:S C.~ I 8240-l 11,v41 Neil will be in the office today. Expecting Hedger this week for EP Pis and Neil 0'Keefe today and Scott Morris on Thursday.
(b)(3)16 U.S.C.§
- * **.................. 8'No*l (b )( 4)
I
From:
To:
Subject:
Date:
~
~
[ExternaLSender] FW: 2FO19 0400 6.16.21 Update Wednesday, lune 16, 2021 8:49:02 AM From: Daniels, Rob Sent: Wednesday, June 16, 2021 4:01 AM To: CPNPP Director Update Cc: Ellegood, John; Day, Neil
Subject:
2FO19 0400 6.16.21 Update Safm; A security officer reported left knee pain following participation in the force on force exercise conducted this morning. The employee report she had experienced pain in the same knee after twisting at home Saturday but believed it had sufficiently healed to participate in the drills. The site nurse examined the left knee, wrapped it for support, provided over the counter ibuprofen for the discomfort and to prevent inflammation, and released the employee to return to work with instruction to follow up.
o.u.aJl.1¥,;
X3) 16 U.S.C § 8240-l CPNPP Engineering, Work Management, Vistra transformers SM Es, and ABB personnel will align on a final _!Cb_l(_4_) __
! plan on days. Heather Winn has the lead.
Schedule:
~i~~~J16 u 5 C.§... The.draft.sc:heo1,1le.re. reseMs*a............
ush to the critical aths for all 3 o tions due t~ (b)(4)
(b )( 4)
T~he-sc.,.h-e""'d""ul,...e-w""'i""
II ""be....,.fu-rt""'h_e_r-re""f""in-e""d,...o_n__.
(b)(3)16 USC§ - d""a_y_s_""hi,.._t"'. -----..-----------------------
8240-l Option 1,.,!Cb,...,)""'(4"") _______
.,! scheduled activities are shown below. This option currently indicates sync to grid at (b)(3)16 U.S.C.§ J_,.....
8240 1 Option ~(bX4)
I have been issued and this option indicates sync to grid a Cb)(J) 16 U.S.C.§ 824°-1
- =====~
Option ~
Cb_)_C4_) ______
___.!This option currently indicates sync to grid a (b)(3)16 U S.C.§ 8240*1 Activity Estimated Actual Completion Comments Completion Complete filling 2MT1 (b)(3)16 l(b)(3) 16 I
r X3):16 U.S.C.§ 8240-l, (b)(4)
I U.S.C.§ 8240-l
- l!S !:: § S':lg-l (b)(i) 16 U.~ C.§ 8240-l, (b)
(4)
(b)(4)
(b)(4)
- Data from each test should be review after each test to avoid late discovery.
Piscoyery Items (bX.l) lo U.S.C.§ 8L4o
-I 2FO19-01 ~(b)(4)
! Recovery In Progress 2FO19 (Option 3) Assess spar~ (b)(4) current condition and actions to prepare for use. TR-2021-003872 Leader-Craig Montgomery. Activities have been identified and review is underway,~*
to inspection/testing, maintenance activities, and installation considerations. WO are being planne
- as...... --~l~!~-r~.. U.S.C.§ planner resources become available. DZ has commenced preparation activities and identified ini Ia main enance items. EPS testing in progress.
(b)(4) was enerated to document the issues, and is on the Engineering whiteboard for resolution.
(b)(3) 16 U.S.C.§ (b)(3)16 USC.§ 8240-l
___,**** * ********** *r,~40,J 2FO19-Q4 -Ibis djscoyery jtem will track any identified damage t~ (b)(4)
! IR-2021-003939.!(b)(4>
! is in progress.
2F019 86 Ti'lis diseovel"v itern ~,ill lraek repair of!(h)(4) l An inspeelion o!(b)(4) J
""l(b,..,.>c""'4)=-==-------------------------------_,
CLOSED 2FO19 This discovery item will track external tol(b)(4)
! component damage assessment, repa~
ad evaluations for use. Discove Mana er Ben She ard Da s/ Thomas Hu hes on ni hts. TR-2021-003957~
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(3) 16 USC§ 8240,!
diseo,ef) manager is Ti'lom Follow up items being tracked by the Outage Director:
- 1.
CWP 2-02 trip-M&R troubleshooting has not identified the issue. Westinghouse TECO or other support r~~Q will be requested to support further troubleshooting components on!(b)(4)
! Repairs completedj ~)~321 86 8210
l(b)(3):16 U.S.C.§ 8240-l
- 2. (b)(4) 1 entI IcatIon Is In progress.
Rob Daniels Comanche Peak Nuclear Power Plant rob.daniels@luminant.com 254.897.5712 IR-2021-004005. WO planning and parts
- This email message, including any attachments, contains or may contain confidential inD intended only for the addressee.
d recipient of this mess y rea mg, dissemination, forwarding, printing, copyin or nts is strictly prohibited. If you have received t ease notify the sender immediately by reply message an m
age an any attachments from your system.
(b)(3)16 U.S C.§ 8240-I (b)(3)16 U.S.C.§ 8240-I From:
To:
Subject:
Date:
~
~
[ExternaLSender] FW: 2FO19 1000 6.16.21 Update Wednesday, lune 16, 2021 11:31:00 AM From: Marzloff, Al Sent: Wednesday, June 16, 2021 9:55 AM To: CPNPP Director Update Cc: Ellegood, John; Day, Neil
Subject:
2F019 1000 6.16.21 Update Safm;
- None Safm;
- None
~
(b)(3):16 U.S.C.§ 8240-l CPNPP Engineering, Work Management, Vistra transformers SMEs, and ABB personnel will align on a final recirculation plan on days. Heather Winn has the lead.
Schedule:
The draft scheq~_lerepr.esents push to the critical paths for all 3 options due to,.!Cba.,l.._(4..
l ___________ _.
WI.~~---------------------------' The schedule will be further refined on da __.shif....
. 0815 Stakeholder meetin was conducted to determine actions oin forward.
4 (b)(4)
Option 1 (b)(4) scheduled activit ies are shown below. This option currently indicates sync to grid at
..,(b..,.:)(""3 )'"':!"'6""u:"'is~c!!'_ §!!"8!!'!2"!'40--'!"'
1 ---.r---'
Option 2!(b)(4)
! have been issued and this option indicates sync to grid aj (b)(3) 16 U.S C.§ 8240-1
'====~
Option 3l(b)(4)
!This option currently indicat es sync to grid al(b)(3):16 U.S C § 8240-I Activity Estimated Actual Completion Comments Completion (b)(4)
{b)(j):10 (b)(j) 10 u S.C.§ 2MT1 oil recirculation and processing U.S.C.§ 8240-I 8240-I commenced at 0310. Sample obtained.
(b)(3):16 U.S.C.§ 8240-l j<h)(3) 16 USC.§ 8240-I I
(b}(4)
- Data from each test should be review after each test to avoid late discovery.
Discovery Items (b}(3)16 U.S C.§ 8240-l 2FO19-01 -!(b>C4)
!. Recovery In Progress 2FO19 (Option 3) Assess spard (b)(4)
~ current condition and actions to prepare for use. TR-2021-003872 Leader-Craig Montgomery. Activities have been identified and review is underway~f; r 1
binnini] to inspection/testing, maintenance activities, and installation consideirations. WO are being planne
- .. as...
planner resources become available. DZ has commenced re aration activities and identified ini 1a main n n items. EPS testin in ro ress.
was generate to ocument the issues, and is on the Engineering whiteboard for resolution.
Work continues on dayshift and plans are being developed fo1(b)(4)
~;;:::======::::;----
2FO19 This discover item will track an identified dama et (b)(4)
IR-2021-003939 (b)(4)
(b)(3)16 U.S C.§ 824o-86 (b)(3)16 USC§
- g240*,t-**
2FO19 This discovery item will track external to !(b)(4)
~ component damage assessment, repair, ad evaluations for use. Discovery Manager Ben Shepard Days/ Thomas Hughes on nights. TR-2021-003957 -~
(b)(4)
Follow up items being tracked by the Outage Director:
I. CWP 2-02 trip-M&R troubleshooting has not identified the issue. Westinghouse TECO or other support group will be re uested to su 01t further troubleshootin components o1(b)(4)
! Repairs completed. (b)(3) 16 us C.§ 8240-l 2,._!(b_)(_4) ________________ __,! IR-2021-004005. WO planning and parts identification is in progress.
ion
g or other use of this message or its attachments OU haver stem.
From:
To:
Subject:
Date:
~
~
[ExternaL Sender] FW: 2FO19 1600 6.16.21 Update Wednesday, lune 16, 2021 4:24:29 PM From: Marzloff, Al Sent: Wednesday, June 16, 2021 4:01 PM To: CPNPP Director Update Cc: Ellegood, John; Day, Neil; Skinner, Larry
Subject:
2F019 1600 6.16.21 Update Safm;
- None Safm;
- None
~
IR-2021-004006 documents a delay to the forced outage (b)(4) commenced a (b)(3):16 u S.C.§ 8240-l (b)(3) 16 U.S.C.§ 8240-l (b)(4)
CPNPP Engineering, Work Management, Vistra transformers SMEs, and ABB personnel will align on a final recirculation plan on days. Heather Winn has the lead.
Schedule:
(b)(3P 6 U.S.C.§..... The~raftschedule.. r.epresentsa push to the critical paths for all 3 options due to the..,i(b,..)._(4.._) _________ _,
8 240 1
~._4~~----r.:-:-:-':"":'."""":'-:-~---:-:------:--:'."""":'--:-:---:-:----:--' The schedule will be further refined on (b)(3):16 U.S.C.§ (Ja.yshif 0815 Stakeholder meeting was conducted to determine actions going forward. (b)(4) 8240-l r,;(b-,)(,:.
4
- ,.) ;;,_,_J ______________,;;_ ___________
_.... _______ --1
. Updated durations are contained in the r::O~p':':t':"'io':":n~l~a1,(b.,)..,(4,..,>.,.......,._..,.... __ __.I scheduled activities are shown below. This option currently indicates sync to grid at
!Cb)(3)16 u.s c.§ 8240-I Option 2..
!Cb_)_C4_) ______
_.!have been issued and this option indicate~ sync to grid a~(b)(J):!6 U.S.C.§ 8240*1 Option 3 q(b)(4)
!This option currently indicates sync to grid at!Cb)(3) 16 U.S.C.§ 8240-l Activity Estimated Actual Completion Comments Completion (b)(3)16 U.S c.§ (b)(3)16 U.S.C.§ 8240-l (b)(4)
Complete filling 2MT1 8240-l T+O (0318) and T+4 (0710) samples I (b)(3)16 U.S.C.§ 8240-l l
~~d -~~nd off '°~i~~aa~~::
taken to the whse for Hot shot and left (b)(3)16 U.S.C.§ 8240 I
. J.,***
!sample and send off for analysis (b)(4) at 0730 Samples left CPNPP at 1258 based on access due to overhead buss work Sample arrived 6/16/21 1240 Sample takes approx.. 4hrs Sample expected at Doble at 1830
(b)(4)
Commence Data Review Complete Data Review
- Data from each test should be review after each test to avoid late discovery.
Discovery Items (b)(3) 16 U.S C § 8240-l 2FO19-01 -!CbX4)
~ Recovery In Progress 8.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> per process cycle 2FO19 (Option 3) Assess spare!CbX4)
!current condition and actions to prepare for use. TR-2021-003872 Leader-Craig Montgomery. Activities have been identified and review is underway for binning to inspection/testing, maintenance activities, and installation consideirations. WO are being planned overnight as planner resources become availa I. DZ h c mmenced re aration activities and identified initial maintenance as genera Work contin Pressure w estin in ro ress.
2FO19 This discovery item will track external to!CbX4)
!component damage assessment, repair, ad evaluations for use. Discove Mana er Ben She ard b a s/ I homas Hu hes on ni hts. TR-2021-00395~M......
bl(4"")---.
CbX4) 2FO19 CWP 2-02 tripped on post work startup. Days Lead-Ben Shepard/ Nights-Jake Freeselr)(J) 16 u S.C § 8240- I Issue report to be written.
Follow up items being tracked by the Outage Director:
(b)(3)16 U.S.C.§ 8240-l I. CWP 2-02 trip-M&R troubleshooting has not identified the issue. Wesrrebause IECQ ar other support group will ested to support further troubleshooting components o ~ )(4) l Repairs completed (b)(4) tripped upon startup. Troubleshooting is in progress. This item will be declared discovery and upcl<1t1:<i ~ _.....
email.
- 2. (b)(4)
IR-2021-004005. WO plannin9 and parts identification is in progress. ca o 1s eing u1 tun er t e east (b)(4) based on accessibility. ThelCb)(4) scaffold will be built as soon as area is accessible. te(b"")"'(4"') ___ _._ ___ _, will be inspected via JLG to determine if needs replacement.
Notice: This email message, including any attachments, contains or may contain confidential infonn'
- intended only fort 1e a tan intended recipient of this messa e a mg, dissemination, forwarding, printing, copying or ot er r I s attachments is strictly prohibited. If you have received this m.
o I the sender immediately by rep y m
- s email any attachments from your system.
From:
To:
Subject:
Date:
Attachments:
~
~
[External_Sender] FW: 6-16-21 2FO19-1 Schedule Wednesday, June 16, 2021 4:24:26 PM UNIT 2 XFRMR FORCED OUTAGE 061621 OPTION 1.od(
6-16-21 2FO19-1 Startuo on both Data.xJsx, From: Marzloff, Al Sent: Wednesday, June 16, 2021 3:37 PM To: CPNPP Director Update Cc: Ellegood, John; Day, Neil
Subject:
FW: 6-16-21 2FO19-1 Schedule
- Everyone, Please see today's updated frag.
- Thanks, Al From: Harrigan, Bruce <Bruce.Harrigan@luminant.com>
Sent: Wednesday, June 16, 2021 3:29 PM The two attachments, totalling 13 pages, are withheld in their entirety on the basis ofFOIA exemption 3 in conjunction with 16 U.S.C.
8240-l and FOIA exemption 4.
To: Marzloff, Al <AI.Marzloff@luminant.com>; Tirsun, Daniel <Daniel.Tirsun@luminant.com>;
McCool, Tom <Tom.Mccool@luminant.com>
Cc: Guerra, Rick <Rick.Guerra@luminant.com>
Subject:
6-16-21 2FO19-1 Schedule attached.
Schedule for startup on bot (b)(4)
~--"'."""""I'!!"!!!!!"'!~,.,,..,,,.,..,,,,.,....-,------,
Please note on page 4, item 79 contains (b)(3) 16 u.s.c.§ 824°-1 Also note this version only includes repairs to th This SVP contingency.
Excel download of the schedule provided to facilitate copy and paste into the director update.
Thank you, Bruce Harrigan Outage Scheduling Supervisor Comanche Peak Nuclear Power Plant Office: 254-897-5348 Mobile...
!(b_l<5_l ___
Bruce.harrigan@luminant.com
<3 tiality Notice: This email message, including any attachments, contains or m contain con 1 rntion intended only for the addressee. If n rntended recipient of this message, be a v readi nation, forwarding, printing, copying or other use of this mess*
ac
- ct! prohibited. If you have received this m
- or, please notify the sender immediate 1essage and s email message and any attachments from your system.
From:
Ellegood John To:
~
- Proulx. David; Strittmatter. Henry
- Q"Keefe. Neil; ~
- Reyna. Lenora; Galvin. Pennis; ~
Bernadette Cc:
Hedger. Sean
Subject:
CP Plant Status Date:
Thursday, June 17, 2021 8:40:50 AM 6/17/ 2021 S1a1lJ..s.;.
!.!ni1..1
!.!ni1.2 Power Level:
(b)(3):16 U.S.C.§ 8240-l, (b)(4)
Mode:
Risk:
Green Green TTB:
NIA NA Sboct Ducatio IS Sbutdow actio staterne t:r
.I.J.ni.t IS AQI DescciQtio I
~otable E11ets aod 8cti11ities Issues of interest.
Hands off declared; Clearance issue this morning-lCbX3) 16 u.s C.§ s240-1. (b)(4)
I (b)(3) 16 U.S C.§ 8240-l, (b)(4)
~
Unit 1Cb)(3)16 USC§ 8240-l (b)(4) lyesterdav afternoon. See attached email for response.
(b)(3):16 U.S.C.§ 8240-l, (b)(4) l)y the ena or today. The only real activity done so far was to get an oil sample. As of now there are 3 options:
- 1. (b)(3) 16 U.S C.§ 8240-l, (b)(4)
- 2.
- 3.
Obvious! (b)(3) 16 U.S C § 8240-l (b)(4) land schedules will follow. As of now Ops is holding in Mod~ I
- ** ***** ** ** * *---~--n,.~n--n.,..,
UPDATE 6/10 (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I (b)(3):16 USC.§
Jl~4o**l*;*(b)(4)
(b)(3) 16 U.S.C.§ 8240-l, (b)(4) * ** *
- performed by the vendo~Cb)<3P 6 u.s.c.§ 8240-1* CbX4)
I (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I They chanqed their path due to input from the vendor. I (b)(3)16 U.S C.§ 8240-I, (b)(4)
I Thev expect the'"'--
(b)(3)16 U.S.C.§ 8240-l, (b)(4)
I complet~Cb)(3)t6 u.s.c.§ 8240-1. Cb)(4)
I completdCbX3>16 u.s c.§ 8240-1. Cb)(4>
Cb)(3) 16 u.s c § 8240-1 (b)(4)
I that will be completu andwilL have the results for decisions on the 3 options.
UPDATE 6/11 - ThinQs overall oroaressina as discussi:>rl (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
\\ (all tests at this point were fine though).
UPDATE 6/14 --\\
(b)(3)16 U.S C.§ 8240-I, (b)(4)
UPDATE 6/15 ~
I (b)(3)16 U.S C.§ 8240-I, (b)(4)
Update 6/16-I (b)(3) 16 U.S.C.§ 8240-l, (b)(4) lwith help from corporate.
If they decide td0')(3) 16 u.s.c.§ 8240-1.
lthat options look~~j<3),16,,_~;~;c.§ (b)(3) 16 U.S.C.§ 8240-l, (b)(4)
I (b)(3) 16 USC.§ 8240-I, (b)(4)
I There is no impact on the site while inlCb)(3)16 u.s.c.§ 8240-1. (b)(4)
I If they need tol(b)(3)16 us c.§ 8240-1. Cb)(4)
. througLJ
~hat schedule goes Neil and John will be in the office today. Scott Morris onsite today Thursday.
(b)(3)16 U.S.C.§
- 8~4a*l;(b)(4)
From:
Ellegood John To:
~
- Proulx. David; Strittmatter. Henry
- Q"Keefe. Neil; ~
- Reyna. Lenora; Galvin. Pennis; ~
Bernadette Cc:
Hedger. Sean
Subject:
CP Plant Status Date:
Monday, June 21, 2021 8:26:59 AM 6/21/ 2021
~
!J.ni1..1 l.!ni1.2 Power Level:
(bX3):16 U.S.C.§ 82-lo-l, (bX4)
Mode:
Risk:
Green Green TTB:
N/A NA SbQl'.I QucatiQ IS SbutdQW a!:.tiQ staterneots;
.!J.ni.1 IS AQI I Qes!:.[i'21iQ I
NQtable Events and AQtivities Issues of interest.
U2 start up over the weekend ;!CbX3) 16 us c.§ 8240-1 CbX-1)
I (b)(3):16 U.S.C.§ 8240-l, (b)(4)
No issues reported by the site.
(b)(3) 16 USC.§ 8240-l, (b)(4)
I room is cool.
(b)(3)16 U.S.C.§ 8240-l, CbX4)
I There is no impact on the site while in1Cb)(3)16 us c.§ 8240 1, (b)(4) 1-Site is troubleshooting; currently it is an efficiency issue.
Neil is Temp SPE; John is WAH but may go in.
From:
To:
Cc:
Subject:
Date:
Attachments:
Mr. Morris, Struble Garry Morris. Scott Galvin, Dennjs: Ellegood. John: ~
- Hicks Jack
- Merka. Gary: Gilliam. Debra
[External_Sender] Reactor Trip Due to Fault on Main Transformer 2MT1 LER 446/ 21-001 *00 Wednesday, August 4* 2021 2:53:14 PM The attached Licensee Event Report is publicly imaqe002.onq JXX-21097 cp-202100478 NRC EIE pdf available in ADAMS as ML21216A386.
I have electronically submitted the referenced LER via EIE.
The submittal was made on Wednesday August 4, 2021 at 1546 EDT under submission ID# 34999 and Accession No. ML21216A386.
If there are questions regarding this submittal please contact Gary Merka at 254.897.6613 or at Gary.Merka@luminant.com.
Garry W Struble Comanche Peak Nuclear Power Plant Consulting Licensing Engineer Office: (254) 897-6628 Fax: 254 897-6573 Cell: (b)(6)
Garry.Struble@luroioant.com ice: This email message, including any attac con a *
~..,U~l'l!"':!T'en*
d recipient of this message, be
, printing, copying or ot u have
- fill:~lo@e..,,,.ffi sage and ge and any attachments from your system.