ML22116A115
| ML22116A115 | |
| Person / Time | |
|---|---|
| Issue date: | 04/25/2022 |
| From: | NRC/OCIO |
| To: | |
| Shared Package | |
| ML22116A113 | List: |
| References | |
| NRC-2021-000113 | |
| Download: ML22116A115 (7) | |
Text
Note to requester: The text for SECY-18-0007 is redacted under FOIA Exemption B5, Deliberative Process Privile e. The text for SECY-18-001 2 is redacted under FOIA B5 Attorne -Client Privile e.
Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title SECY-17-0118 11/21/2017 Affirmation Florida Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7). Appeal of LBP-1 7-6 SECY-17-0121 12/07/2017 Notation Vote Proposed License to Authorize the Export of Radioactive Sources to the Republic of Cuba - XB 1335 SECY-18-0006 01/16/2018 Affirmation Unitech Services Group, Inc Export of Low-Level Waste)(Petition Seeking Leave to Intervene and Request for Hearinq)
SECY-18-0007 01/11/2018 Information (b)(5)
I Exemption Request for AP1000 Renewal SECY-18-0012 01/26/2018 Information (b )(5)1 Proposed License For The Export Of Depleted Uranium Metal Rods To The Republic SECY-18-0014 01/29/2018 Notation Vote Of Korea For Research And Development Of Fuel For Sodium-Cooled Fast Reactor -
XSOU8843 SECY-18-0018 02/08/2018 Affirmation Florida Power & Light Co. (Turkey Point Nuclear Generating Units 6 and 7), Docket Nos. 52-040-COL & 52-041-COL, Mandatory Hearinq Decision SECY-18-0019 02/12/2018 Affirmation Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Requests for Hearing in License Transfer Proceeding Powertech (USA) Inc. (Dewey-Burdock lnSitu Uranium Recovery Fae.), Petition for SECY-18-0021 02/14/2018 Affirmation Review of LBP-17-9, Memorandum & Order (Granting Summary Disposition as to Contention 1 B, Denying Summary Disposition as to Contention 1A, and Establishing Further Procedures)
SECY-18-0023 02/15/2018 Affirmation NextERA Energy Seabrook, LLC (Seabrook Station, Unit 1 ), Appeal of LBP-17-7 SECY-18-0024 02/14/2018 Notation Vote Nuclear Materials and Waste Safety Proqram and Fee Evaluation SECY-18-0027 02/27/2018 Affirmation Tennessee Valley Authority(Clinch River Early Site Permit Application), Docket No. 52-047-ESP, Aoolicant's Aooeal of LBP-17-8.
SECY-18-0029 02/28/2018 Information (U) 2017 Annual Threat Review Implementation of the Office of the Director of National Intelligence, Security Executive SECY-18-0030 03/01/2018 Notation Vote Agent Directive 3 and National Industrial Security Program Operating Manual Change 2, Insider Threat Proqram.
Delegation of Authority to the Executive Director for Operations to Revise the SECY-18-0032 03/05/2018 Notation Vote Enforcement Policy Table of Base Civil Penalties Due to Annual Civil Monetary Penalty Adjustments SECY-18-0034 03/08/2018 Affirmation Northwest Medical Isotopes, LLC (Medical Radioisotope Production Facility), Docket No. 50-609-CP, Mandatory Hearinq Decision
Note to requester: The text for SECY-18-0050 is redacted under FOIA Exemption B5, Deliberative Process Privilege.
The text for SECY-19-0013 is redacted under FOIA B5, Attorney-Client Privilege.
Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title SECY-18-0039 03/16/2018 Affirmation Entergy Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) - License Transfer Proposed Agreement Between the Government of the United States of America and the SECY-18-0044 04/05/2018 Notation Vote Government of the United Kingdom of Great Britain and Northern Ireland for Cooperation in Peaceful Uses of Nuclear Enerqy SECY-18-0050 04/19/2018 Notation Vote (b)(5)
SECY-18-0051 04/24/2018 Information Status of Space Utilization at The White Flint Campus in Light of Staffing Levels Response to Staff requirements Memorandum (SRM)-COMSECY-17-0008 on Physical SECY-18-0063 06/04/2018 Notation Vote Protection for Non-Power Production and Utilization Facilities Intending to Produce Molybdenum-99 SECY-18-0066 06/11/2018 Non-Possessing Facility Clearances and Personnel Security Clearances for U.S.
Nuclear Regulatory Commission-Licensed Facilities and other Entities SECY-18-0085 08/29/2018 Notation Vote Fiscal Year 2019 Proposed Fee Rule SECY-18-0089 09/11/2018 Affirmation Motion to Quash Office of lnvestiqations Subpoena Filed By Reed Colleqe SECY-18-0110 11/02/2018 Notation Vote Proposed Revision to Regulatory Guide 5.69, 'Guidance for the Application of the Radiological Sabotage Design-Basis Threat for Nuclear Power Reactors' SECY-18-0115 11/15/2018 Information Biennial Paper - Implementation Of The Five-Year International Strateqy SECY-18-0116 11/19/2018 Affirmation Powertech (USA), Inc. (Dewey-Burdock IN SITU Uranium Recovery Facility), Response to Remand from D.C. Circuit in OGLALA SIOUX Tribe V. NRC SECY-18-0122 12/11/2018 Affirmation Diversified Scientific Services, Inc. (Export of Low-Level Waste) (Petition Seeking Leave to Intervene and Request for Hearing)
SECY-18-0124 12/28/2018 Notation Vote Request To Issue License Authorizing The Export Of AP1000 Reactor Coolant Pumps and Associated Equipment To China XR177 SECY-19-0002 01/04/2019 Notation Vote Implementation of Chanqes to the Resident Inspector ProQram SECY-19-0010 01/22/2019 Affirmation Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), LBP-18-6 (referred rulinq denyinq motion to disqualify Board)
SECY-19-0013 01/30/2019 Notation Vote (b )(5)1 SECY-19-0015 01/31/2019 Notation Vote Proposed License to Export Radioactive Sources to Iraq for Use in Oil and Gas Exploration Well Loaainq Related Activities - PXB217.00 2
I Note to requester: The text for SECY-19-0063 is redacted under FOIA Exemption B5, Deliberative Process Privilege.
Non-Public SECY Papers 3
SECY Number Paper Date Paper Type Paper Title Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont SECY-19-0019 02/15/2019 Affirmation Nuclear Power Station) - License Transfer, Withdrawls of Requests for Hearing and Petitions for Leave to Intervene SECY-19-0022 02/25/2019 Affirmation Exelon Generation Co., LLC (Oyster Creek Nuclear Generating Station) Requests for Hearinq in License Transfer Proceedinq SECY-19-0025 03/05/2019 Information (U) 2018 Annual Threat Review Powertech (Dewey-Burdock, In Situ Uranium Recovery Facility), Petition for SECY-19-0029 03/22/2019 Affirmation Interlocutory Review of LBP-18-5, Memorandum and Order (Denying Motions for Summary Disposition as to Contention 1A).
SECY-19-0041 04/22/2019 Notation Vote Proposed License To Export Radioactive Sources To Sudan For Use In Oil And Gas Exploration Well Loaainq And Gauoinq Activities - PXB220.00 SECY-19-0042 04/24/2019 Notation Vote Request To Issue License Authorizing The Export Of Low Enriched Uranium To The Republic Of Korea - XSNM3789 SECY-19-0045 05/03/2019 Affirmation NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1) - License Amendment, EmerQency Petition SECY-19-0049 05/09/2019 Affirmation Crow Butte Resources, Inc. (Marsland Expansion Area), Petition for Review of LBP 2, LBP-18-3, and Memorandum and Order Granting Summary Disposition SECY-19-0052 05/15/2019 Notation Vote United States of America National Report for the Eighth Convention on Nuclear Safety SECY-19-0054 05/23/2019 Notation Vote Update to the U.S. Nuclear Regulatory Commission's Priority Intelligence Requirements SECY-19-0057 05/28/2019 Information Reorqanization of the Office of Nuclear Material Safety and Safequards SECY-19-0063 06/21/2019 Information I
(b )(5)1 Entergy Nuclear Ops, Inc., Entergy Nuclear Gen Co., Holtec Intl, and Holtec Decommi SECY-19-0076 08/08/2019 Affirmation Intl, LLC (Pilgrim Nuclear Power Station) License Transfer Commonwealth of Mass Motion to Stay Proceeding Pending Settlement Neg SECY-19-0081 08/26/2019 Notation Vote Fiscal Year 2020 Proposed Fee Rule SECY-19-0093 09/27/2019 Affirmation Tennessee Valley Authority (Clinch River Nuclear Site Early Site Permit Application),
Docket No. 52-047-ESP, Mandatory HearinQ Decision SECY-19-0098 10/04/2019 Affirmation Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4) - Referred RulinQ in LBP-19-3 and FPL's Aooeal of LBP-19-3
Note to requester: The text for SECY-19-0106 and for SECY-19-0124 are redacted under FOIA Exem tion B5 Deliberative Process Privile e.
Non-Public SECY Papers SECY Number Paper Date Paper Type Paper Title SECY-19-0098A 11/07/2019 Affirmation Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4) - Certified RulinQ in LBP-19-3 and FPL's Aooeal of LBP-19-3 SECY-19-0100 10/09/2019 Notation Vote Discontinuation of Rulemaking -Independent Spent Fuel Storage Installation Security Requirements SECY-19-0101 10/10/2019 Affirmation Exelon Generating Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3)
- Bevond Nuclear's Appeal of LBP-19-5 SECY-19-0102 10/15/2019 Information Technical Analysis of Unmanned Aerial Vehicles for Nuclear Power Plants and Category 1 Fuel Cycle Facilities (U)
Entergy Nuclear Operations, Inc., Entergy Nuclear Generation Co., Holtec International, SECY-19-0105 10/28/2019 Affirmation and Holtec Decommissioning International, LLC. (Pilgrim Nuclear Power Station) -
License Transfer Proposed Licenses to Export Radioactive Materials to Iraq for Various End Uses SECY-19-0106 10/28/2019 Notation Vote XB1337, XB1339, XB1340, and PXB227.00J(b)(5)
I (b)(5)
I SECY-19-0116 11/22/2019 Affirmation Holtec International (HI-STORE Consolidated Interim Storage Facility), Appeals of LBP-19-4; Motion for New Contention FirstEnergy Nuclear Operating Co. and FirstEnergy Nuclear Generation, LLC. (Beaver SECY-19-0122 12/17/2019 Affirmation Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit 1; Perry Nuclear Power Plant, Unit 1 ), Request for Hearing in License Transfer Proceeding SECY-19-0124 12/18/2019 Notation Vote (b)(5)
I SECY-20-0011 02/04/2020 Affirmation El Paso Electric Co. (Palo Verde Nuclear Generating Station) Request for Hearing in License Transfer Proceeding SECY-20-0012 02/04/2020 Affirmation Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of LBP-19-7 (denial of hearing); Motion to Reopen Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of SECY-20-0012A 04/02/2020 Affirmation LBP-19-7 Fasken appeal of denial of access to SUNSI information; update for footnote reQardinQ Amended Contention 4 Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeals of SECY-20-0012B 08/04/2020 Affirmation LBP-19-7: Fasken Proposed New Contention Based on Draft Environmental Impact Statement SECY-20-0017 02/24/2020 Affirmation Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Appeal LBP-19-11 ( denial of motion to file late contention) 4
The text for SECY-20-0058 is redacted under FOIA B5, Attorney-Client Privilege.
Non-Public SECY Papers 5
SECY Number Paper Date Paper Type Paper Title Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility), Sierra Club SECY-20-0019 02/28/2020 Affirmation Appeal of LBP-19-9 (denying motion to amend and granting motion to dismiss}, LBP 7 (Denial of Contention)
Update Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility),
SECY-20-0019A 09/30/2020 Affirmation Sierra Club Appeal of LBP-19-9 (denying motion to amend and granting motion to dismiss), LBP-1 9-7 (Denial of Contentions)
SECY-20-0022 03/02/2020 Information (U) 2019 Annual Threat Review SECY-20-0023 03/18/2020 Affirmation Entergy Nuc. Ops. Inc., Entergy Nuc. Generation Co., Holtec Intern'!, and HDI, LLC (Pilgrim Nuclear Pwr Station) - Petitions for Intervention Entergy Nuclear Operations, Inc., Entergy Nuclear Generation Co., Holtec International, SECY-20-0023A 07/09/2020 Affirmation and Holtec Decommissioning International, LLC (Pilgrim Nuclear Power Station) -
Pilgrim Watch Petition for Intervention SECY-20-0027 03/25/2020 Affirmation Powertech (USA), Inc. (Dewey-Burdock In Situ Leach Facility); Petitions for Review UNITED STATES DEPARTMENT OF ENERGY (EXPORT OF 93.35% ENRICHED SECY-20-0028 03/26/2020 Affirmation URANIUM) (PETITIONS SEEKING LEAVE TO INTERVENE AND REQUEST FOR HEARING)
Exelon Generation Company, LLC (Three Mile Island Nuclear Station, Units 1 and 2),
SECY-20-0038 04/30/2020 Affirmation Referred Motion Relating to LBP-20-2 (Denial of Hearing Request Relating To Emergency Planning License Amendment Plan of Action for Potential Escalated Enforcement Prior to the Expiration of the Statue SECY-20-0046 05/26/2020 Information of Limitations for Tennessee Valley Authority Watts Bar Unit 1 (Office of Investigations Report No. 2-2016-042)
SECY-20-004 7 05/29/2020 Affirmation Southern Nuclear Operating Co., Inc. (Vogtle Electric Generating Plant, Unit 3) Request for Hearing in ITAAC Proceeding, Expedited Consideration Requested DELEGATION OF ONE-TIME SIGNATURE AUTHORITY TO THE EXECUTIVE SECY-20-0054 06/15/2020 Notation Vote DIRECTOR FOR OPERATIONS TO ISSUE A FINAL RULE AMENDING TITLE 10 OF THE CODE OF FEDERAL REGULATIONS, PART 110, "EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL" SECY-20-0057 06/25/2020 Notation Vote Revised International Strateav SECY-20-0058 06/30/2020 Notation Vote (b )(5)1
Non-Public SECY Papers 6
SECY Number Paper Date Paper Type Paper Title Status of the United States of America National Report for Seventh Review Meeting of SECY-20-0062 07/10/2020 Information the Joint Convention on the Safety of Spent Fuel Mgmt and on the Safety of Radioactive Waste Mqmt SECY-20-0067 07/27/2020 Notation Vote Foundations for Evidence Based Policymaking Act of 2018: Interim Learning Agenda Interim Capacity Assessment, and Annual Evaluation Plan SECY-20-0069 07/30/2020 Affirmation Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Station Units 1, 2, &
3 and ISFSI), Memorandum and Order Ruling on Petitions to Intervene SECY-20-0069A 12/03/2020 Affirmation Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Station Units 1, 2, and 3 and ISFI), Memorandum and Order Ruling on Petitions to Intervene SECY-20-0070 07/30/2020 Notation Vote Technical Evaluation of the Security Bounding Time Concept for Operating Nuclear Power Plants SECY-20-0073 08/12/2020 Affirmation Nuclear Development LLC (Bellefonte Nuclear Power Plant, Units 1 and 2), Request for Hearinq in License Transfer Proceedinq SECY-20-0077 08/21/2020 Affirmation FirstEnergy Companies and TMl-2 Solutions, LLC (Three Mile Island Nuclear Station, Units 1 and 2), Petition to Intervene in License Transfer Proceeding SECY-20-0079 09/03/2020 Notation Vote Fiscal Year 2021 Proposed Fee Rule Oklo Power LLC. (Aurora Reactor)-Emergency Petition to Immediately Revoke or SECY-20-0084 09/18/2020 Affirmation Suspend Docketing Notice and Hearing Notice for Combined License Application by Oklo Power, LLC and Request for Clarification that Nuclear Energy Innovation SECY-20-0087 09/24/2020 Affirmation Holtec International (HI-STORE Consolidated Interim Storage Facility), Sierra Club Aooeal of LBP-20-6 Consultation With The Commission On Whether Violations Associated with Inaccurate SECY-20-0097 10/20/2020 Notation Vote and Incomplete Information, As Well As Deliberate Misconduct, Exist Associated with Tennessee Valley Authority SECY-20-0099 10/22/2020 Affirmation DTE Electric Co.-Fermi 2 Appeal of LBP-20-7 Denial of Hearing Request Related to SFP Lie Amendment SECY-20-0103 11/10/2020 Affirmation Southern Nuclear Operating Co., Inc. (Vogtle Electric Generating Plant, Unit 3) Appeal of LBP-20-8 SECY-20-0107 11/19/2020 Notation Vote Recommendations for Addressing Resident Inspector Recruitment and Retention Challenqes.
Non-Public SECY Papers 7
SECY Number Paper Date Paper Type Paper Title SECY-20-0113 12/11/2020 Affirmation Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), lntervenors' Petitions for Review of LBP-19-3, LBP-19-6, and LPB-19-8 SECY-20-0114 12/11/2020 Affirmation In the Matter of Joseph Shea (Order Prohibiting Involvement in NRG-Licensed Activities Immediately Effective), Review of LBP-20-11 SECY-20-0121 12/23/2020 Notation Vote Proposed Licenses to Export ByProduct Materials to Iraq for Use In Oil and Gas Production Well Testing -XB1345, XB1346, XB1347 and XB1348 SECY-20-0122 12/23/2020 Notation Vote Final Draft of the Fiscal Year 2022 Annual Evaluation Plan SECY-21-0014 02/11/2021 Affirmation Southern Nuclear Operating Co., Inc. (Vogtle Electric Generating Plant Unit 3); motion to reooen SECY-21-0016 02/17/2021 Notation Vote Proposed License to Export a Moisture Density Gauge to Iraq for Use In Road Construction Activities XB 1341 SECY-21-0017 02/22/2021 Notation Vote Proposed License to Export Moisture Density Gauges to Iraq for use in Road Construction Activities - XB 1344 SECY-21-0018 02/22/2021 Information Uodate on Agencvwide Transformation Performance Measures SECY-21-0020 02/24/2021 Affirmation Exelon Generating Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3), Beyond Nuclear's Motions to Submit a New Contention and Reopen the Record SECY-21-0022 02/26/2021 Affirmation Holtec International (HI-STORE Consolidated Interim Storage Facility), Fasken Land and Minerals Appeal of LBP-20-10 and Third Motion to Reopen SECY-21-0024 02/26/2021 Information (U) 2020 Annual Threat Review SECY-21-0025 03/02/2021 Information Comorehensive Roadmao for the Aaencv's Lona-Term Soace Needs