ML21124A123

From kanterella
Revision as of 14:39, 19 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030
ML21124A123
Person / Time
Site: Hatch, Farley  Southern Nuclear icon.png
Issue date: 05/04/2021
From: Necota Staples
Division Reactor Projects II
To: Alan Blamey
Division Reactor Projects II
References
Download: ML21124A123 (3)


Text

May 04, 2021 MEMORANDUM TO: Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM: Necota L. Staples, Senior Project Engineer /RA/

Reactor Projects Branch 2 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2, EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, DOCKET NO. 50-348, 50-364, 50-321, 50-366, MEETING NUMBER ML21117A030 On April 27, 2021, the Nuclear Regulatory Commission (NRC) conducted an online virtual meeting concerning Joseph M. Farley Nuclear Plant Units 1 and 2, and Edwin I. Hatch Nuclear Plant Units 1 and 2. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2020 - December 31, 2020.

In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing, the meeting was held remotely through the Microsoft Teams application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML21117A030),

Joseph M. Farley Nuclear Plant Annual Assessment Letter (ML21062A001) and Edwin I. Hatch Nuclear Plant Annual Assessment Letter (ML21062A011), Assessment Meeting Presentation (ML21117A025).

The meeting was conducted from 4:00 PM to 5:00 PM eastern time. There were 30 attendees. In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, U.S.

Environmental Protection Agency, State of Georgia, and members of the public. Enclosed are a list of attendees. NRC staff were available for questions for half an hour.

There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System under Meeting Code (20210429) and upon submittal of this memo there were no public responses to the meeting.

Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8 CONTACT: Necota Staples, RII/DRP (404) 997-4644

ML21124A123 OFFICE RII/DRP NAME N. Staples DATE 05/04/2021 U.S. Nuclear Regulatory Commission - Annual Public Meeting Farley Nuclear Plant and Hatch Nuclear Plant April 27, 2021 ATTENDEE NAME AFFLIATE Melanie H Brown Member of Public Biko B. Freeman Farley Lloyd Generette EPA Region 4, GA Jeff Quinn Member of Public Patricia Long SNC James Eduardo Love Hatch Mark Crompton Member of Public David Matos EPA Region 4, State of GA Adrienne R. Tickle GPC Cornell Titus Member of Public Greg Lloyd Member of Public Jeffery A. Wilson GPC Dave Gasperson U.S. NRC John Hickman U.S. NRC John Lamb U.S. NRC John Pelchat U.S. NRC Rich Smith U.S. NRC Necota Staples U.S. NRC Stephanie Devlin-Gill U.S. NRC Roger Hannah U.S. NRC Lynnea Williams U.S. NRC Alan Blamey U.S. NRC Peter Meier U.S. NRC Sarah Temple U.S. NRC Coleman Curran U.S. NRC Enclosure