MONTHYEARIR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, Plants Units 1&2, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 Plants Units 1&2, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML24061A1692024-03-22022 March 2024 PM Reassignment Letter Farley March 2024 NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 IR 05000348/20230062024-02-28028 February 2024 Annual Assessment Letter for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2023006 and 05000364/2023006 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers IR 05000348/20230042024-02-0909 February 2024 Integrated Inspection Report 05000348/2023004 and 05000364/2023004 and Exercise of Enforcement Discretion NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers ML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection 2024-08-07
[Table view] Category:Memoranda
MONTHYEARML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter ML24138A0092024-05-17017 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50-348, and 50-364 -Meeting Number 20240474 ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23146A1672023-05-31031 May 2023 Public Meeting Summary2022 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50?348, and 50?364 Meeting Number 20230610 ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML18337A0422018-12-0303 December 2018 Reissue- Farley 2019 Exam Corporate Notification Letter ML17104A1382017-04-14014 April 2017 Summary of Meeting to Discuss the Annual Assessment of Farley Nuclear Plant, Units 1 and 2 ML16138A6512016-06-0202 June 2016 Audit of Supporting Design, Licensing & Other Documents Related to License Amendment Requests to Support the Adoption of Technical Specification Task Force Traveler 312 ML16126A0812016-05-0505 May 2016 Summary of Public Meeting with Joseph M. Farley, Units 1 and 2 ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML16097A6022016-04-0808 April 2016 Audit of Supporting Design, Licensing and Other Documents Related to License Amendment Requests to Support Adoption of Technical Specification Task Force Traveler 312 ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15120A5942015-04-30030 April 2015 Summary of Public Meeting to Discuss 2014 Annual Performance Assessment of the Joseph M. Farley Nuclear Plant ML15055A5622015-02-26026 February 2015 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML14197A5932014-08-0606 August 2014 June 26, 2014, Summary of Category 1 Public Meeting with Southern Nuclear Operating Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14133A0392014-06-0303 June 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, and Southern Nuclear Company to Discuss Dam Failure for the Joseph Farley Nuclear Plant ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14066A0472014-03-0707 March 2014 Electronic Transmission, Draft Request for Additional Information Regarding License Amendment Request to Adopt Nation Fire Protection Association Standard 805 (TAC ME9741 and ME9742 ML14017A3712014-01-17017 January 2014 Special Inspection Charter to Evaluate the Failure of B Train Solid State Protection System Operability Surveillance Test at Farley Unit 2 ML13067A2692013-03-11011 March 2013 03/21/2013 Forthcoming Meeting with Southern Nuclear Company Regarding Voluntary Fire Protection Risk Initiative Amendment Request for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML13050A2862013-02-22022 February 2013 3/7/2013 - Forthcoming Meeting Notice with Southern Nuclear Company to Discuss Responses to Requests for Additional Information Related to Amendment Requests to Transition to the National Fire Protection Association NFPA-805 Methodology ML11208B3162011-07-28028 July 2011 Notice of Closed Meeting with the Southern Nuclear Operating Company, Inc. to Discuss Plant Security Projects and Actions for Upcoming Inspection Activities at the Joseph M. Farley Nuclear Plant ML1108105442011-03-22022 March 2011 Notice of Cancelled Forthcoming Meeting with Southern Nuclear Operating Company, Inc. (Snc), to Discuss NFPA 805 License Amendment for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML1104804052011-03-0707 March 2011 Notice of Forthcoming Meeting with Southern Nuclear Operating Company to Discuss NFPA 805 License Amendment for Farley ML1016704282010-06-17017 June 2010 Meeting Summary Notice ML0929906142009-10-29029 October 2009 Michael Lesar Memo FRN Order (Effective Immediately) Prohibiting Involvement in NRC-Licensed Activities (NRC Office of Investigations Report No. 2-2008-055) ML0917301322009-06-25025 June 2009 06/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CA ML0908607892009-01-16016 January 2009 3. FEMA Response to NRC Regarding Farley TARs Seven Question, FEMA Memo from Burnside, January 16, 2009 ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0730404832007-10-31031 October 2007 Supplemental Augmented Inspection Team Charter to Evaluate a Farley 1B Residual Heat Removal (RHR) Pump 4.16-kV Breaker Failure ML0703002272007-02-0606 February 2007 Facsimile Transmission of Draft Request for Additional Information on Emergency Action Level Revision ML0626902022006-09-20020 September 2006 Facsimile Transmission of Draft Request for Additional Information ML0614505922006-05-26026 May 2006 Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report ML0611602422006-04-26026 April 2006 Special Inspection Charter to Evaluate Farley Unit 1 Main Steam Isolation Valve Failures ML0534901782005-12-0909 December 2005 Safety Evaluation for Proposed Change of Technical Specification to Eliminate the Reactor Coolant Pump Breaker Position Reactor Trip Function. ML0520701182005-08-0303 August 2005 Unit 2 - Closeout Letter for NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0508705022005-03-29029 March 2005 Memo to John a Harris, Correction of License Authority Files (Tac No. MC3231, MC3232) ML0504901422005-02-17017 February 2005 Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents ML0425402692004-09-15015 September 2004 Memo Issuing Audit and Review Report for Plant Aging Management Reviews and Programs for the Joseph M. Farley Nuclear Plant, Units 1 and 2 ML0415302092004-06-0101 June 2004 Docketing of Questions and Responses Transmitted Electronically or by Facsimile ML0414701282004-05-26026 May 2004 Notice of Meeting with Southern Nuclear Operating Company Re Forthcoming Meeting to Discuss the Staff'S RAIs on LRA for Farley Nuclear Plant, Units 1 & 2 ML0414005382004-05-0707 May 2004 Input to SER for Section 2.4, Scoping and Screening Results: Containments, Structures, and Component Supports, Joseph M. Farley Nuclear Plant LRA ML0335000882003-12-15015 December 2003 Commissioner-District 4 - Acknowledgment of Receipt of Your Letter Supporting the Application for Renewal of the Operating Licenses for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Jason Rudd ML0331604772003-11-12012 November 2003 Email on EOF Relocation ML0323902222003-08-25025 August 2003 Results of the Joseph M. Farley Nuclear Plant Units 1 and 2 SDP Phase 2 Notebook Benchmarking Visit ML0828803132002-02-0101 February 2002 Observations Noted from Examination of the Farley-PWR 4.6% Power Uprate: Staff Template for Review of PWR Uprates 2024-07-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 3, 2018 Dennis Madison Site Vice President Southern Nuclear Operating Co., Inc.
Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
REISSUE - JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000348/2019301 AND 05000364/2019301
Dear Mr. Madison:
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued the Notification of Licensed Operator Initial Examination for the Joseph M. Farley Nuclear Plant, which was memorialized as Agencywide Documents Access and Management System (ADAMS)
Accession Number ML18312A090. In reviewing this report, an administrative error was identified regarding the listed due dates of the preparatory examination material. Moreover, the appropriate branch chief/licensing authority for this examination required updating. Therefore, for the sake of clarity we are re-issuing the entire letter. We request that you disregard the previous information, and replace the previous letter with this letter in its entirety:
During a telephone conversation on October 10, 2018, between Mr. G. Ohmstede, Southern Nuclear Fleet Training Support Manager, other members of your staff, and Mr. M. Meeks, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Farley Nuclear Plant. The on-site preparatory week is scheduled for the week of May 6, 2019. The operating test is scheduled to be administered during the weeks of June 10 and June 17, 2019. The written examination is scheduled to be administered the week of June 24, 2019.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by January 11, 2019. The NRC provided the written examination outline to your staff in May, 2018. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by March 27, 2019. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
D. Madison 2 representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver and/or excusal requests (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Meeks to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. Meeks when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
D. Madison 3 information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information, unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html.
Thank you for your cooperation in this matter. Mr. Ohmstede has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail: Michael.Meeks@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.:50-348, 50-364 License Nos.:NPF-2, NPF-8 cc: Distribution via Listserv
D. Madison 4
SUBJECT:
REISSUE - JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000348/2019301 AND 05000364/2019301 dated December 3, 2018
- See previous page for concurrence PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML18337A042 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS/ OB1 RII/DRS/OB2 SIGNATURE MKM3 GXG NAME M.MEEKS E. Guthrie DATE 11/ 29 /2018 12/3 /2018 E-MAIL COPY? YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLExams\Farley Examinations\Initial Exam 2019-301\Correspondence\Reissued and Corrected Farley 2019 Exam Corporate Notification Letter.docx .