Forwards LER 97-023-01 Re Both Radwaste Bldg Trucklock Doors Closed Resulting in Configuration Inconsistent W/Tornado Depressurization Analysis Assumptions
ML20248B828
Person / Time
Site: Pilgrim
Issue date: 05/21/1998
From: Olivier L
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20248B833 List:
References
LTR.2.98.036, NUDOCS 9806010393
Download: ML20248B828 (2)


LER-2097-023, Forwards LER 97-023-01 Re Both Radwaste Bldg Trucklock Doors Closed Resulting in Configuration Inconsistent W/Tornado Depressurization Analysis Assumptions
Event date:
Report date:
2932097023R00 - NRC Website

text

, _

't ,

. 10 CFR 50.73 G

Boston Edison Pilgrirn Nuclear Power Station 600 Rocky Hill Road l

Plymouth, Massachusetts 02360 May 21,1998  !

BECo Ltr. 2.98.036 )

LJ. Oliwer l Senior Vice President Nuclear

)

I i

U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 The enclosed supplemental Licensee Event Report (LER) 97-023-01, "Both Radwaste Building Trucklock Doors Closed Resulting in a Configuration inconsistent with Tornado Depressurization Analysis Assumptions,"is submitted in accordance with 10 CFR Part 50.73.

This letter contains the following commitments:

  • Develop a formal program to control compartment barriers.
  • Develop and conduct training for Engineering, Operations, Maintenance, instrumentation and Controls and others deemed appropriate to improve their understanding of /

subcompartment analyses and the need to maintain control of subcompartment barriers.

l In LER 97-023-00, we committed to implement a program to control compartment barriers by March 30,1998. Development of that program is complete and full implementation, including training, will be completed by July 17,1998. p Note that we elected to remove the wooden Radwaste Building trucklock doors rather than confirm their acceptability. Also, note that the second commitment broadens the scope of our upcoming barrier control program to include additional plant personnel.

Please do not hesitate to contact me if there are any questions regarding this report.

N ,

9806010393 980521

  • DR ADOCK 0500 3 g J. Olivier

Enclosure:

LER 97-023-01 KRD/dcg 9702301

Boston Edison Company cc: Mr. Hubert J. Miller Regional Administrator, Region i U.S; Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 l . Sr. NRC Resident inspector - Pilgrim Station i-l lNPO Records 700 Galleria Parkway Atlanta, GA 30339-5957 Stanuard BECo LER Distribution