Informs That GE Requested Authority to Insert No More than Six Std or Depleted Fuel Rod Elements Into SEFOR Reactor for Testing Purposes on 680517
ML20140G604
Person / Time
Site: 05000231
Issue date: 10/01/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Cohen K
GENERAL ELECTRIC CO.
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 NUDOCS 9705120044
Download: ML20140G604 (3)


Text

_

. .. . _ _ _. =. _ _ _ _ . . _ _ _ _ _ . _ _ . . _ _ . _ . . _ _ . _ _ . . _ . _ _ .

O, ,

~

~

^ Suppl, 9

l::g fo - t - d Docket,No. 50-231' k

General Electric Company Advanced Products Operation l'

310 DeGuigne Drive Suanyvale, California 94806 r -

Attention: Mr. Karl P. Cohea

, General Maanger i

Gentlemen In a letter dated May 17, 1968, the General Electric Company requested authority to insert no more than six standard or ,

depleted fuel rod elements into the SEFOR reactor for testing '

purposes. The possession of this fuel is now licensed by the Commission under Special Nuclear Material Licensa No. SMN-1018 We have reviewed the procedures and safety considerations relative to the requested use of the six standard or depleted fuel red elements, including: (1) transfer of fuel from the new fuel storage area to the refueling cell; (2) insertion of fuel rods into the reactor; (3) transfer of fuel from the refueling call to the fuel storage area; (4) ariticality and radiation controls maintained; and (5) the fuel accountability method that will be used during the test program. Based on the material reviewed, we conclude thats (1) adequate pre-cautions will be taken to assure a suberitical fuel mass and maintenance of radiation and contamination control; and (2) i even in the event of an accident the potential for the release of any significant amount of radioactive material appears to be negligible.

l Your proposal to place up to a maximum of six standard or l depleted fuel rod elements in the core of the facility for the purpose of testing dimensional conpatibility under the pro-cedures described is considered to be pre-operational testing J

l l-

' b 9705120044 970505 il3 PDR FOIA VARADY97-34 PDR

__ _ _ __ . . . . . . . _ _ _ _ - . _ _ . . _ . . _ _ _ . . ~ _ _ _ . ._

- (-

General Electric Company , ,

.rather than fuel loading (which may not be done prior to the issuance of an operating license). The proposed tests may be performed so long as they are . limited solely to dimensional testing, and not

performed for the purpose of increasing the neutron population to aseestplish suberitical physics, instrumentation, or other tests.

1 l Three copies of h t No. 1 to Indemnity Agreement No. B-35 are

enclosed for your review and acceptance. Please sign and return one 1

copy of the assedmont to this office at your earliest convenianos.

! Sincerely, i

i f

Peter A. Morris, Director Division of Reactor Licensing j

! cc: Mr. J. Robert Welsh Distribution:

Frasident PDR j

i Southwest Atomic Energy Associates Formal

! 306 Pyramid Building Suppl.

Little Rock, Arkansas 72203 REG Reading RPB-4 Reading j

Mr. B. D. Wilson DEL Reading l

Administrator - Licensing PA Morris l i

F Schroeder Nuclear Energy Division General Electric Company RS Boyd 175 Curtner Avenue S Levine j

San Jose, California 95125 RE Ireland

' ND Mason i

LN Rib R Engelken i

N Dube JR Buchanan, ORNL j l Ftan Robinson l

i i

For other concurrences see attached yellow. S & LR J Saltzman E Price 10// /68 omcr > .. . . .0GQ- 3RL.. $ . .. . .. .. .. DEL...... . . . . ..DRL ggg,,,

t RE Ire and HL Price F Schroeder PA Morris sunsAuc > LN. Rib. . . . . R Boyd ,,

. 8/22/68_ 8//J/68 8/4768 , , , , 8/ /68 8/ /68 carr > . 8/.12/.68 _, , ,_

IMfin AEC-818 (Rev.943) u.s.sovramutnTenswfincomet ssee-o-tia en m.

w , .  % W yy. m >q .

b General Electric Company -

    • rather than fuel leeM == (which may not be done prior to the issuance.of an operating license). The proposed tests may be performed so long as they are limited solely to dimensional  ;

testias, and not performed for the purpose of increasing the i mestros populaties to assemplish soberittaal physics, instru-mentaties, or other tests.

Sincerely, 3 .

Peter A. Morris, Director Division of Eeactor Licensing l

l cc Mr. J. Robert Welsh l President i Southwest Atomic Energy Associates )

306 Pyramid Building l

, Little Beck, Arkansas 72203 Mr. 3. D. Wilson Maimistrator - Licensing 7

maalear Emergy Divisten General Electric Campany 175 Curtaer' Avenue San Jose, California 95125 l

l l

MM MW

&LR ,7

-)

I M i k kts, JS zk y E rice

& L cR '

o. l91 / / 68 D j ddC
,,e , , ..

. . . . . DRL. h....... . . . . RL . . -D. - - - . BEG-sunnAur > . . . . . . . . .. --  ?--- - -

om> 8/12/68 , , , , , 8/_lf,/48 8/2y.1h3.. ..B41.3..jA8_.. - -/ - /_ /68 .

8/ /.68, Form AEC-818 (R 9-63) U.s sownnurnimannsoma me-&2u42s

- -