ML20140G245

From kanterella
Jump to navigation Jump to search
First Partial Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR
ML20140G245
Person / Time
Site: 05000231
Issue date: 05/05/1997
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Varady T
ARKANSAS, UNIV. OF, FAYETTEVILLE, AR
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 ACRS-GENERAL, NUDOCS 9705080210
Download: ML20140G245 (8)


Text

.

.---.,....--..-r

~..

N U.S. NUCLEAR RE ULATORY COMMISSION NHC FOIA HEOUEST NUMBE HIS)

FOIA -

97-0034

. gg%

h RESPONSE TO FREEDOM OF l FINAL d PARTIAL jq j

RESPONSE TYPE g

(

W ORMATION ACT (FOIA) REQUEST DATE pg DOCKET NUMBER (S)(!/apphcable)

REQUESTER I

T. Scott Varady I

i l

PART 1.-AGENCY RECORDS RELEASED OR NOT LOCATED /See checkedboxes/

k I

No agency records subject to the request have been located.

w:_

1 No additional agency records subject to the request have been located.

l I

Requested records are available through another public distribution program, See Comments section, Agency records subject to the request that are identified in Append;x(es) are already available for public inspection and copying at the I

NRC Public Docun ent Room,2120 L Street, N.W., Washington, DC.

p l

y Agency records subject to the request that are identified in Appendix (es)

A are being made available for public inspection and copying M

at the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOlA number, n

The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a me:% of my staf f is now being made available l<

for public inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in ' Ider under this Fot A number, q

y I

Agency records subject to the request that are identified in Appendix (es) may be inspected and copwd at the NRC Lccal Public Document Room identified in the Comments section.

f Enclosed is mformation on how you rr.ay obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street,

_ f N.W., Wa<hington, DC.

=

]

b Agency records subject to the request are enclosed. Annoneli yA rorords are enclosed.

Records subject to tne request have been referred to another Federal agency (ies) for review and direct response to you.

l j

Fees

}I p y[y You will be billed by the NRC for fees totaling S I

y You will receive a refund from the NRC in the amount of S i

1, In view of NRC's response to this request, no further action is being taken on appeal letter dated

, No.

lla PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated

.[

h j i In Part 11, B, C, and D. Any released porilons of the documents for which only par + of the record is being withheld are being made available for public d

l inspection and copying in the NRC Public Document Room,2120 L Street, N.W., Washington, DC in a folder under this FOl A number,

)

1 COMMENTS I

g JA The review of records subject to your request is continuing.

We will contact you upon v

completion of the review.

l y

k N

=

hbI, (0

l b fl)lIl.lfllfl[

k' s

a i.

y

()?OSOSD 2IQ h

oiRECTO F F RE AMATION AND PUBLICATIONS SERVICES u

I J i

\\ -

An % f R1 9705000210 970505 bk b

PDR FOIA k.

me ' y u

$"NT.*NN -

VARADY97-34 P -m m

MbSN U

PDR

$$@MWWM h$hYkkh$N Y$. -. khY 1

g o

o

F

'#r e

r

~

Re:

FOIA-97-034 e

-APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY i

(If copyrighted identify with *)

c RL, DATE DES.QRIPTION/(PAGE' COUNT) 1.

10/9/64 Letter to USNRC from G. White, GE, Re:

Southwest Atomic Energy Associates

("SAEA") and GE w/ enclosure (24 pages)'

2.

10/13/64 By TWX (fax) to USNRC from G. White, GE, Re: Letter dated 10/10 to GE -

Preliminary Hazards Summary Report "THSR" (1 page)

' 3.

10/16/64 Letter-to USNRC from G. White, GE, w/ enclosure (1 page) 4.

'11/3/64

- Letter to USNRC from G. White, GE, Re: SAEA & GE, submit Amendment 1 to i

joint application for Class 104(b) to construct and permit SEFOR w/ enclosure (6 pages) 5.

11/23/64-Letter to USNRC from G. White, GE, Re: Ref. made to your request dated 10/16/64, that info. contained in Part II of the PHSR for the SEFOR be withheld from inspection (1 page) 6.

11/23/64 Letter to GE from R. L. Doan Re:

Ref.

dated 10/16/64, Part II of Preliminary Hazards Summary Report for SEFOR be withheld from inspection (1 page) 7.

12/17/64 Letter to GE, from R. L. Doan Re: Ref.

made to file jointly by GE and SAEA for licenses to construct / operate the SEFOR w/ enclosure (7 pages) 8.

12/24/64 Letter to GE, from R. L. Doan w/ attachment 2/24/64 notice to USNRC (3 pages) 9.

12/24/64 Letter to Surgeon General, U.S.

Public

[

Health Services, fron'E. Case Re:

Understanding reached 8/1/61, between AEC and Dept. of Health, Education and Welfare (1 page) i 1

(

l i

L.

[

I e

, Re:

FOIA-97-034 i

[

i 10.

12/24/64 Letter to Dr.

J.

Herron,-Arkansas State.

(

Board of Health, from E.

Casa Re:

Licenses to construct and operate SEFOR in Washington County, Arkansas (1 page) 11.

1/14/65 Letter to USNRC from Juler Pearlman, GE Re:

Docket No. 50-231 (1 page)

L l

.12, 4/19/65 Letter to M.

S.

Levine, USNRC from l

B. D. Wilson, GE Re:

financial qualifications of SAEA and Gesellschaft reply to Dr. Doan's letter of 12/24/64 l

w/ enclosure (5 pages)

L 13.

5/28/65 Order of Notice of Prehearing Conference p

to USNRC (4 pages) 14.

6/3/65 Letter to GE from R.

L. Doan Re:

Ref.

dated 3/9/65 Part II of Supplement No. 2 l

to License Application for SEFOR be withheld (1 page) l 15. -

6/11/65 Order and Notice of Change of Place of l

~ Hearing to USNRC (2 pages) l 16.

6/17/65 AIR MAIL to Jules Pearlman, GE, l

Mr. J. Welsh, SAEA and T.' Conner, USNRC (3 pages) 17.

8/5/65 Order Supplementing and closing Hearing Record to USNRC (4 pages) 18.

9/13/65 Initial Decision to USNRC (41 pages) 19.

9/21/65 Letter to GE from R. L. Doan Re:

l Provisional Construction Permit No.

CPPR-17 pursuant to Initial Decision L

dated 9/10/65 (4 pages) l i

20.

9/23/65 Motion for Order extending time to L

submit additional evidence and order l

extending time to USNRC (3 pages) l L

21.

9/28/65 Brratum to USNRC (2 pages) fi l

22.

10/7/65 Order Extending time to USNRC (2 pages) 23.

11/19/65 Order to USNRC (4 pages)

.,r-w.

r- - - -4

4 i

~,

j Re:

FOIA-97-034 1

i i

24.

1/7/66 Supplemental Initial Decision to USNRC (16 pages)

)

25.

1/10/66 Staff's Consent to Applicants' Motion for Stay to USNRC (1 page) 26.

1/11/66 Memorandum and Order to USNR (3 page) j-27.

2/16/66 Memorandum and Order to USNRC (4 page)

I

]

28.

3/7/66 Decision to USNRC (10 pages)

~i 29.

3/18/66 Letter to GE from R.

L.

Doan Re:

Amendment No. 1 to Provisional

}

Construction Permit No. CPPR-17 to the decision of USNRC dated 3/7/66 (4 pages) t 1

30.

12/12/67 Letter to Southwest Atomic Energy i

Associates from Dr.

P. Morris Re:

Order

]

extending to 12/1/68 for Construction j

5 Permit Nc. CPPR-17 w/ enclosures

]

(3 Pages)

)

31.

10/1/68 Letter to GE from Dr.P. Morris Re:

3 Insert fuel rod elements into the SEFOR 5

(3 pages) 32.

10/21/68 Letter to GE from Dr.

P. Morris Re:

Telephone inquiry from Mr. Henry Bose

{

(1 page)

~

j' 33.

11/23/68 Letter to GE from Dr. P. Morris Re:

Order extending to 1/31/69 w/ enclosures (2 pages) l i

34.

1/14/69 Letter to Dr. P. Morris, USNRC from i

B.

D. Wilson, GE w/ enclosure Re:

3 Extension request of the construction completion dates for SEFOR (5 pages) 35.

1/24/69 Letter to Dr. P. Morris, from B. D. Wilson, Re:

Amendment transmits Supplement 22 and Errata 5 to the SEFOR FDSAR, Supplement 18 (4 pages)

E 36.

1/29/69 Letter to GE from Dr. P. Morris Re:

i; Order extending to 4/30/69 w/ enclosure (3 pages) i

f Re:

FOIA-97-034 37.

2/20/69 Letter to Dr.

P. Morris, from B.

D. Wilson, Re:

Amendment No. 28 to the License Application for SEFOR w/ enclosure (7 pages) 38.

3/4/69 Letter to GE from Dr.

P. Morris Re:

Provisional Operating License No. DR-15 to possess, use, and operate SEFOR w/ enclosures (76 pages) 39.

3/27/69 Letter to Dr. P. Morris, from B.

D. Wilson, Re:

Amendment No. 29 to License Application for SEFOR w/ enclosure (3 pages) 40.

4/11/69 Letter to Dr. P. Morris, from K.

Cohen, GE Tech Specs for SEFOR (1 page) 41.

5/16/69 Letter to Dr.

P. Morris, from B.

D. Wilson Re:

Amendment No. 30 License Application for SEFOR (4 pages) 42.

8/21/69 Letter to GE from Dr.

P. Morris Re:

Office of Federal Register forwarded a notd.ce relating to the proposed issuance of an amendment to Provisional Operating License No. DR-15 w/ enclosures (25 pages) 43.

1/2/70 Letter to GE from Dr.

P. Morris Re:

USNRC issued Amendment No. 1 Provisional Operating License No. DR-15 w/ enclosures (150 pages) 44.

4/17/70 Letter to Dr. P. Morris, from K. Cohen, Re:

Proposed change No. 1 to License DR-15 for SEFOR (21 pages) 45.

6/5/70 Letter to GE from Dr.

P. Morris Re:

Letter dated 4/17/70 proposed change No. 1 to Tech Specs appended to License No. DR-15 for SEFOR w/ attachment A j,

(12 pages) l l

46.

6/12/70 Letter to Dr. P. Morris from K. Cohen Re:

Proposed Change No. 2 to License DR-15 for SEFOR (21 pages) l

-., -.. -...... -. - -.-.-~...

.. _ ~..-~

j

~

. Re:

FOIA-97-034 47.

7/8/70 Letter to Dr. P. Morris from K. Cohen Re:

Proposed Change No. 3 to License DRP-15 for SEFOR (16 pages)

]

l 7/30/70 Letter to Dr.

P. Morris from K.

Cohen 48.

Re:

Proposed Change No. 2 t SEFOR Tech Specs was submitted on 6/12/70 (3 pages) j i

49.

8/28/70 Letter to GE from Dr. P. Morris Re Extending expiration date of Provisional Operating License No. DR-15 from 9/4/70 to 3/4/72 w/ enclosure (3 pages) 50.

9/3/70 Letter to Dr. P. Morris from K. Cohen Re:

Proposed Change No. 4 to License DR-15 for SEFOR w/snclosure (17 pages) 1 l

51.

9/4/70 TWX (fax) to Dr. P. Morris from K. Cohen l

Re:

Proposed Change No. 4 to License l

DR-15 for SEFOR (24 pages) l l

52.

9/8/70 Letter to Dr. P. Morris from K.

Cohen Re:

Proposed Change No. 3 to the SEFOR Tech Specs submitted 7/8/70 (16 pages) 53.

12/11/70 Letter to Dr. P. Morris from K. Cohen Re:

Revision 1 of Proposed Change No. 4 i

License DR-15 for SEFOR w/ enclosure j

l (2 pages)

(

54.

12/22/70 Letter to Dr. P. Morris from K. Cohen Re:

Rev. 2 of Proposed Change No. 4 to License DR-15 for SEFOR w/ enclosure l-(22 pages) 55.

12/31/70 Letter Dr. P. Morris from K. Cohen Re:

l Rev. 2 of Proposed Change No. 4 to License DR-15 for SEFOR was submitted t

12/22/70 (1 page) 56.

1/22/71 Outgoing Telecommunication Message to GE from Dr. P. Morris Re:

Proceed to 20NWt Testing Phase for SEFOR-(2 pages) 57.

1/28/71 Letter to Dr. P. Morris from K. Cohen i

i Re:

Addendum No. 2 to Proposed Change No. 3 for License DR-15 w/ enclosure (24 pages) b li

L' l

. Re:

FOIA-97-034 58.

2/1/71 Letter to Dr.

P. Morris from K. Cohen Re:

Docket No. 50-231 License No. R-15 requiring additional information w/ attachments (11 pages) 59, 2/10/71 Letter to Dr.

P. Morris from K. Cohen Re:

Rev. 1 of Proposed Change No. 4 to SEFOR Tech Specs, correction needs to be made to page 4-9 w/ attachment (3 pages) 60.

2/12/71 Letter to GE from Dr.

P. Morris Re:

Change No. 3 and 4 to Tech Specs appended to Provisional Operating License No. DR-15 for SEFOR w/ enclosures (49 pages) 61.

3/5/71 Letter to Dr.

P. Morris from K. Cohen Re:

Proposed Change No. 2 to SEFOR Tech Specs, submitted on 6/12/70 (1 page) 62.

4/12/71 Letter to GE from Dr.

P. Morris Re:

Proposed Change No. 2 to Tech Specs attached to Provisional Operating License No. DR-15 for SEFOR w/ enclosure

.(11 Pages) 63.

4/28/71 Letter to Dr.

P. Morris from K. Cohen Re:

Proposed Change No. 5 to Tech Specs, submitted in partial response to request for additional information (RAI) in letter dated 4/19/71 (8 pages) 64.

8/4/71 Letter to GE from Dr.

P. Morris Re:

Sub-prompt critical tests for Core I w/ enclosures (7 pages) 65.

8/6/71 Letter to Dr.

P. Morris from D.

S.

Parsley Re:

Proposed Change No. 6 to SEFOR Tech Specs (14 pages) 66.

8/16/71 Letter to GE from Dr.

P. Morris Re:

Proposed Change 6 to Tech Specs for SEFOR w/ enclosure (6 pages) 67.

9/27/71 Letter to GE from Dr.

P. Morris Re:

Proposed Change No. 5 to Tech Specs for i

SEFOR w/ enclosures (10 pages) i I

_m l:

,.ml,.

L..

3 Re:

FOIA-97-034 68.

10/8/71 Letter to Dr. P. Morris from B. Wolfe, GE Re:

Proposed Change No. 7 to SEFOR Tecn Specs w/ enclosure (19.pages) 69.

10/16/71 Letter to'Dr. P. Morris from'B. Wolfe Re:

Proposed Change No. 8 to SEFOR Tech Specs w/ enclosure (31 pages) l I

70.

11/12/71 Letter to GE from Donald Skovholt'Re*

~

Proposed Change No. 7 to Tech Specs for.

SEFOR w/ enclosure (28 pages)-

3 71.

11/12/71

_ Letter to GE.from Donald Skovholt Re:

Proposed Change No. 8 to Tech Specs for SEFOR w/ enclosure (20 pages) 72.

12/29/71 Letter to Dr. P. Morris from B. Wolfe L

Re:

Extend the SEFOR provisional operating license for another 18 months (2 pages)

'73.

12/2/71 Letcer Lo GE from Donald Skovholt Re:

Proposed Change No.f2 dated 6/12/70 w/ enclosure (3 pages) l 74.

1/19/72 Letter to GE from~Dr. P. Morris Re:

Extending the expiration date of Provisional Operating License DR-15 from l

l 3/4/72 to 9/4/73 w/ enclosure (3 pages) 75..

2/28/72 Letter to GE from DorAld Skovholt Re:

Letter' dated 2/11/72 proposed changes to Tech Specs w/ enclosure (13 pages) 76.

7/21/72 Letter to GE from Donald Skovholt Re:

TWX (fax) dated 7/18/72 proposed change to Tech specs (1 page) 77.

10/3/72 Letter to GE from Donald Skovholt Re:

l Letter dated 9/14/72 proposed changes to Tech Specs (2 pages) 78.

2/7/73 Letter to GE from Donald Skovholt Re:-

Letter dated 1/24/73 proposed change in Tech Specs (2 pages)

]

79.

5/14/74 Letter to GE from Karl Goller Re:

An d

I i

order terminating Facility License No.

t i

DR-15 for SEFOR is enclosed w/ enclosures i

(4 Pages) i

?~

i i

4

,