Amend 26 to License Application for SEFOR
ML20140G629
Person / Time
Site: 05000231
Issue date: 01/14/1969
From: Cohen K
GENERAL ELECTRIC CO.
To:
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 NUDOCS 9705120065
Download: ML20140G629 (4)


Text

- . - . .-

l

,. ~ , .

l t

- s

) -

i l*

AMENDMENT NO. 26 i ,

TO

  • 4 LICENSE APPLICATION FOR SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR (SEFOR)

/,( di~ o>

/< Q l

g 3+-4j ,-

4 /

Re: Docket 50-231 s' /

9 c t

4} , )] .

1

~1

0) [: b i- c

% y \, &

General Electric Company Breeder Reactor Development Operation 310 DeGuigne Drive Sunnyvale, California i . .

4 N 9705120065 970505 3 ,, j PDR FOIA VARADY97-34 PDR

-- - . - .. - . - . - , . . - - - - - , ~ . - . . ~ .~ . . . .- ..-.- .- .

.t A) ENDMENT NO. 26 TO LICENSE APPLICATION

, FOR

. . SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR (SEFOR) J 1

1 l As authorized by Construction Permit CPPR-17, Docket 50-231, construction of the Southwest Experimental Fast Oxide Reactor (SEFOR) facility and pre-l operational testing has been substantially completed. A notice of intent of the Atomic Energy Commission to issue a provisional operating license l

l- for power levels up to 1 MWt was published in the Federal Register on November 15, 1968. Issuance of the license is being delayed until certain ,

pre-operational tests are completed. Since the notice of intent to issue a i provisional operaf ng license has been published in the Federal Register, it may not be neccser.y to extend the construction completion dates. However, l if' an extension of the completion dates is required, General Electric hereby requests that such extension be made.

General Electric now amends its application to extend the estimated comple-tion dates for the facility. The revision of the estimate for completion of construction is necessary because of delays that have been experienced in

-performing the pre-operational tests on the primary coolant system. These delays are the result of unsatisfactory performance of temporary filter-screens l

that were installed in the primary coolant loops as part of these pre-operational tests. Efforts to procure a satisfactory filter-screen so that these tests cac 4

be repeated are currently in progress. It may be possible that a satisfactory I-

' 101

. - _ _ - .- - . . . - ..-~ .. - .

? . . .

t . .

I >

/

l fiiter-screen car $ be obtained and the testing required for issuance of a provisional operating license can be completed by January 31, 1969. However, l

additional time is requested because of possible delays in procurement of the l t

filter-screen and to cover any additional unexpected delays that may be encountered

'during the conduct of the remaining pre-operational tests. This amendment is effected by the substitution of revised page 11 dated January 14,1969 for the same numbered page of the application dated November 1,1968.

GENERAL ELECTRIC COMPANY BREEDER REACTOR DEVELOPMENT OPERATION l

By Karl Cohen, General Manager l

Subscribed and sworn to before me this /+'ra(_ day of bm/ . ,

1969. .9 /

M 1rsM @, IuwaAY Notadt Publ){/in and f(f the County of Santa Clara, State of California My Commission Expires: M //' /9 7 A

- - +

4

~ w# -m e Lin.iALdEAL

, 9( l MAFNE; J. SHERGAUS

- 4 NOTARY FUBLIC CALIFORNIA j

,[ SANI A CLARA COUNTY

, My Commission Dpires Nov.18,1972 u

j _

20526 Lynde Court. Saratoga, Cahf. 95070

,, 4

- -- . . ~ ~ .

g,,. -

s I

3 Electric. - Accordingly, SAEA hereby authorizes General Electric, to act for SAEA as well as itself, and General Electric assumes responsibility for acting for SAEA as well as itself, in submitting future amendments to this applica-l tion and correspondence relating to the application or to l

the licenses which have been requested herein other than l

such information which the Commission may wish to obtain directly through SAEA alone.

( B. Completion Date i

The earliest completion date for SEFOR is estimated to be l

  • January 31, 1969,* and the latest completion date is estimated to be
  • April 30, 1969.*

l 9. Security Agreement SAEA and General Electric agree that they will not permit any 1

individuals to have access to restricted data until the Civil Service l

Commission shall have made an investigation and report to the Atomic Energy Comrr.!ssion on the character, associations, and loyalty of such individual and the Atomic Energy Commission shall l

have determined that permitting such person to have access to restricted data will not endanger the common defense and security.

10. Future Amendment Procedure '

This application has been prepared in a manner designed to permit future application amendments to be consolidated into a single inte-9 1

. grated document for more efficient use and ready reference. Sub-l l

i sequent application amendments will identify the amendment by 1

4 License No. Docket No. 50-231 Sect. No. 10 Page Amend. No. 26 Date January 14, 1969 Amends Sect. (s) 8 11 l %JE