PNO-III-87-044, on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation

From kanterella
Revision as of 19:06, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-III-87-044:on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation
ML20205P564
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/27/1987
From: Burgess B, Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
CAL, PNO-III-87-044, PNO-III-87-44, NUDOCS 8704030313
Download: ML20205P564 (1)


_ . . . _ . _

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-87-44 Dath March 27, 1987 b O ~

' .' q' h This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or.public interest significance. The information is as . initially received without

. verification or evaluation, and is basically all that is known by the Region III l staff on this date.

Facility
Consumers Power Company Licensee Emergency Classification:

i Palisades Nuclear Power Plant Notification of an Unusual Event Covert, MI 49043. Alert Site Area Emergency Docket No. 50-255 General Emergency i

X Not Applicable i i

Subject:

CAL ISSUED ALLOWING RESTART OF PALISADES On March 26, 1987, the licensee formally requested Region III to allow restart of the unit,

' which has been shutdown since May 19, 1986 (See PN0-III-86-49).

,.On March 27, 1987, the' Acting Regional Administrator issued a Confirmatory Action Letter to the licensee permitting restart of the plant and the power ascension program. Region III i

(Chicago) plans to continue its augmented inspection coverage during restart activities.

l The licensee has agreed to notify Region III prior to leaving power ascension levels of 30, 60, and 80 percent reactor power.

i Following Region III's approval, the licensee was preparing for restart when a reactor instrument channel malfunctioned. The licensee is making repairs. Restart is expected

! to occur on March 28 or 29.

The State of Michigan will be notified.

)Thisinformationiscurrentasof4:30p.m(CST), March 27,197.

/ i l CONTACT: B. Burgess . demond i

FTS 388-5689 FTS'388-5574 i

i i DISTRIBUTION:

H. St. ED0 NRR Willste E/W Mail
ADM:DMB J Chairman Zech PA IE NMSS DOT:Trans only i

Comm. Roberts ELD OIA RES

, Comm. Asselstine AE00 NRC Ops Ctr 5:08 4 Comm. Bernthal Com. Carr SP SlOS Regional Offices l ACRS SECY INP0 5'03 NSAC S!CO

" CA RIII Resident Office 1

' PDR Licensee: S.'05 (Corp. Office-ReactorLic.Only) 8704030313 870327 Region III

' PDR 18'E o), Rev. November 1986 .

PNO-III-87-044 PDR _