PNO-II-99-043, on 991013,Palisades Nuclear Plant Located Near South Haven,Mi Notified NRC That Package Received from Licensee Exceeded External Radiation Limits of 200 Mrem Per H Authorized by Regulations.Shipper & Carrier Notified14 October 1999PNO-II-99-043:on 991013,Palisades Nuclear Plant Located Near South Haven,Mi Notified NRC That Package Received from Licensee Exceeded External Radiation Limits of 200 Mrem Per H Authorized by Regulations.Shipper & Carrier Notified
IR 05000255/199800828 May 1998Partially Withheld Insp Rept 50-255/98-08 on 980504-08 (Ref 10CFR73.71).No Violations Noted.Major Areas Inspected: Effectiveness of Access Control Functions & Testing & Maint Activities Related to Security Equipment
ML20217K5822 April 1998Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971017,shift Supervisor Failed to Ensure That Equipment Could Be Removed from Svc,By Failing to Ensure That TS Requirements Were Met
IR 05000255/19970075 June 1997Partially Deleted Insp Rept 50-255/97-07 on 970428-0513. Violations Noted.Major Areas Inspected:Mgt Support,Plant Support,Detection Equipment & Evaluation of Security Communication Activities
IR 05000255/199600124 January 1997SALP Rept 50-255/96-01 for Period from 950528-961123Boric Acid
Temporary Modification
Systematic Assessment of Licensee Performance
ML20132F88818 October 1996Notice of Violation from Insp on 960727-0906.Violation Noted:On 960820,electrical Maint Technician Operated Supply Ventilation Fan to EDG 1-2 Room W/O Proper Authorization of Shift Supervisor
ML20059C12823 December 1993Notice of Violation from Insp on 931018-1103.Violation noted:930917 Primary Coolant Sys Temp Between 170 Degrees & 250 Degrees F,Average Cooldown Was Approx 48 Degrees F Per Hour
IR 05000255/199303021 December 1993Insp Rept 50-255/93-30 on 931203.Violations Noted.Major Areas Inspected:Previous Violations Were Reviewed
IR 05000255/19930011 December 1993SALP 12 Rept 50-255/93-01 for 920401-931030Systematic Assessment of Licensee Performance
Fuel cladding
IR 05000255/199302819 November 1993Insp Rept 50-255/93-28 on 931018-1103.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Excessive Cooldown Following Identification of Nonisolable thru-wall Leak on Primary Coolant Sys
IR 05000255/199302716 November 1993Insp Rept 50-255/93-27 on 931025-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Exercise
ML20059G20725 October 1993Notice of Violation from Insp on 930819-0929.Violation Noted:Licensee Cycle 10 Radiochemistry Testing Did Not Positively Identify Failed I-series Fuel
IR 05000255/199302025 October 1993Insp Rept 50-255/93-20 on 930819-0929.Violations Noted.Major Areas Inspected:Licensee Activities Re Summer 1993 Refueling Outage Problems & Plant Restart PreparationsShutdown Margin
Fuel cladding
Flow Induced Vibration
IR 05000255/199302521 October 1993Insp Rept 50-255/93-25 on 931005 & 06.No Violations of NRC fitness-for-duty Noted.Major Areas Inspected:Review of fitness-for-duty Concern Relating to Implementation of Testing for-cause & follow-up of Random Testing ProgramFitness for Duty
PNO-III-93-055, on 930917,indications of Leak Found in Pipe Connecting Top of Pressurizer to Two PORVs During Insp of Reactor Sys Piping.Issues Related to Cracked Pipe Being Reviewed by Region III & NRR & Repairs Underway24 September 1993PNO-III-93-055:on 930917,indications of Leak Found in Pipe Connecting Top of Pressurizer to Two PORVs During Insp of Reactor Sys Piping.Issues Related to Cracked Pipe Being Reviewed by Region III & NRR & Repairs Underway
ML20057B85816 September 1993Exam Rept 50-255/OL-93-02 on 930914.Exam Results: Requalification Written Retake Exam Was Administered to One RO
ML20149D36014 September 1993Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Shift Supervisor Failed to Explain Plans,Procedures & Safety Precautions to Auxiliary Operators Assigned to Perform CRDM mock-up
ML20057A1737 September 1993Insp Rept 50-255/93-05 on 930614-17 & 29,0701 & 20-21 & 0803-04.No Violations or Deviations Noted.Major Areas Inspected:Isi Activities Including Review of Program, Procedures & Observation of Work Activities
PNO-III-93-049A, provides Update on Degraded Neutron Absorbing Plates in Spent Fuel Pool at Plant.Licensee Determined That Sufficient Subcritical Margin Maintained in Spent Fuel Pool.State of Mi Informed31 August 1993PNO-III-93-049A:provides Update on Degraded Neutron Absorbing Plates in Spent Fuel Pool at Plant.Licensee Determined That Sufficient Subcritical Margin Maintained in Spent Fuel Pool.State of Mi Informed
IR 05000255/199301831 August 1993Augmented Insp Team Rept 50-255/93-18 on 930708-20.No Violations Noted.Major Areas Inspected:Review of Validation of Sequence of Events & Licensee Corrective Actions
IR 05000255/199300530 July 1993Insp Rept 50-255/93-05 on Stated Date.No Violations Noted. Major Areas Inspected:Independent NDE of Components & Welds in Order to Ascertain Accuracy of NDE Performed by LicenseeNondestructive Examination
Liquid penetrant
Exclusive Use
PNO-III-93-038, on 930701,licensee Discovered Highly Radioactive Object on Floor of upender-tilt Pit in Refueling Area of Containment.There Have Been No Radiation Overexposures as Result of Event1 July 1993PNO-III-93-038:on 930701,licensee Discovered Highly Radioactive Object on Floor of upender-tilt Pit in Refueling Area of Containment.There Have Been No Radiation Overexposures as Result of Event
PNO-III-93-027, on 930504,listed Individuals Filed Suit Against NRC on Dry Cask Storage Sys at Plant.Util Planning to Begin Movement of Sf Into Storage Casks on 9305074 May 1993PNO-III-93-027:on 930504,listed Individuals Filed Suit Against NRC on Dry Cask Storage Sys at Plant.Util Planning to Begin Movement of Sf Into Storage Casks on 930507
IR 05000255/199300217 February 1993Insp Rept 50-255/93-02 on 921229-930208.No Violations Noted. Major Areas Inspected:Previously Identified Items, Operational Safety Verification,Maint,Surveillance & Design ChangesBoric Acid
ML20127M78221 January 1993Notice of Violation from Insp on 921207-18.Violation Noted: Inservice Test Procedure QO-8B Contained Inadequate Acceptance Criteria to Verify That Listed Check Valves Exercised Full Open Position
IR 05000255/199202821 January 1993Insp Rept 50-255/92-28 on 921207-18.Violations Noted.Major Areas Inspected:Licensee Program on Check Valves,Self Assessment & Incorporation of GL 89-04, Guidance on Developing Acceptable Inservice Test ProgramsStroke time
Operability Determination
IR 05000255/199202713 January 1993Insp Rept 50-255/92-27 on 921117-1228.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Engineering & Technical Support,Maintenance,Surveillance & Quality Control ActivitiesGrace period
IR 05000255/199202325 November 1992Insp Rept 50-255/92-23 on 921006-1116.Noncited Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Reactor Trip,Maint Surveillance,Quarterly Mgt Meeting & Dry Cask Storage Project InspsSafe Shutdown
Boric Acid
Stroke time
Control of Heavy Loads
IR 05000155/19900207 November 1990Insp Repts 50-155/90-20 & 50-255/90-27 on 900925-28 & 1015-19.Violations Noted.Major Areas inspected:fitness-for- Duty & Corrective Actions for Audit Findings
IR 05000255/19900166 July 1990Insp Rept 50-255/90-16 on 900618-22 & 25.No Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Areas,Detection & Assessment Aids,Package & Vehicle Access, Compensatory Measures & Training & QualificationFitness for Duty
IR 05000255/19890111 May 1989Partially Withheld Physical Security Insp Rept 50-255/89-11 on 890410-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers & Access Control,Including Personnel,Packages & Vehicles
PNO-III-89-007, on 890130 Unit Taken off-line to Repair Primary to Secondary Tube Leak in B Sg.Caused by Leakage Increase Since 890124 & Reaching Licensee Administrative Limit of 0.1 Gpm.Plans Include Preventive Plugging of Tubes1 February 1989PNO-III-89-007:on 890130 Unit Taken off-line to Repair Primary to Secondary Tube Leak in B Sg.Caused by Leakage Increase Since 890124 & Reaching Licensee Administrative Limit of 0.1 Gpm.Plans Include Preventive Plugging of Tubes
IR 05000255/198801324 May 1988Partially Withheld Insp Rept 50-255/88-13 on 880502-05 (Ref 10CFR73.21).Major Areas Inspected:Security Plan/ Implementing Procedures,Mgt Effectiveness,Security Organization,Testing & Maint & Security Sys Power SupplySafeguards Contingency Plan
IR 05000255/198800927 April 1988Insp Rept 50-255/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Activation of Emergency Plan,Licensee Action on Previously Identified Items & Changes to Emergency Preparedness ProgramSiren
PNO-III-87-140, on 871111,oiler on Feedwater Block Valve Exploded in Turbine Bldg,Injuring Two Workers.One Individual Taken to Local Hosp & Later Transferred to Kalamazoo,Mi Hosp for Surgery & Second Worker Treated at Plant12 November 1987PNO-III-87-140:on 871111,oiler on Feedwater Block Valve Exploded in Turbine Bldg,Injuring Two Workers.One Individual Taken to Local Hosp & Later Transferred to Kalamazoo,Mi Hosp for Surgery & Second Worker Treated at Plant
PNO-III-87-134, on 871015,w/unit Cold Shutdown for Maint, Operators Tripped Operating Shutdown Coolant Pump in Response to Alarms & Indications of Fluctuation Pressure within Pump16 October 1987PNO-III-87-134:on 871015,w/unit Cold Shutdown for Maint, Operators Tripped Operating Shutdown Coolant Pump in Response to Alarms & Indications of Fluctuation Pressure within Pump
PNO-III-87-131, on 871007,util & Bechtel Power Corp Issued Joint Press Release Announcing Tentative Agreement to Form New Joint Venture Which Would Own & Operate Facility.Util Would Continue to Operate Facility Under Contract for 3 Yrs7 October 1987PNO-III-87-131:on 871007,util & Bechtel Power Corp Issued Joint Press Release Announcing Tentative Agreement to Form New Joint Venture Which Would Own & Operate Facility.Util Would Continue to Operate Facility Under Contract for 3 Yrs
PNO-III-87-097A, on 870714,preliminary Review of Incident Determined That Startup Transformer 1-2 Faulted.Cause of Initial Fault Still Under Investigation15 July 1987PNO-III-87-097A:on 870714,preliminary Review of Incident Determined That Startup Transformer 1-2 Faulted.Cause of Initial Fault Still Under Investigation
PNO-III-87-097, on 870714,plant Lost Offsite Power Causing Reactor Trip.Caused by Ground Fault in One of Three Startup Transformers.Main Generator Will Be Disconnected from Main Transformer Which Will Feed Power to Plant14 July 1987PNO-III-87-097:on 870714,plant Lost Offsite Power Causing Reactor Trip.Caused by Ground Fault in One of Three Startup Transformers.Main Generator Will Be Disconnected from Main Transformer Which Will Feed Power to Plant
PNO-III-87-095, on 870709,reduction in Power Occurred Due to Handswitch Failure on Cooling Tower Pump B Discharge Valve. on 870710,decreasing Oil Pressure in Primary Coolant Pump Noted.Possibly Caused by Pump Vibration Creating Oil Leak10 July 1987PNO-III-87-095:on 870709,reduction in Power Occurred Due to Handswitch Failure on Cooling Tower Pump B Discharge Valve. on 870710,decreasing Oil Pressure in Primary Coolant Pump Noted.Possibly Caused by Pump Vibration Creating Oil Leak
IR 05000255/19870168 July 1987Insp Rept 50-255/87-16 on 870608-12.No Violations Noted. Major Areas Inspected:Confirmatory Measurements Program Including Comparison of Licensee Analyses W/Region III Mobile Lab,Radiological Environ Program & Open Item
PNO-III-87-085, on 870620,while Reducing Power for Governor Valve Test on Main Turbine,Turbine Was Taken Off Line After Discovery of electro-hydraulic Control Fluid Leak on 4 Governor Valve22 June 1987PNO-III-87-085:on 870620,while Reducing Power for Governor Valve Test on Main Turbine,Turbine Was Taken Off Line After Discovery of electro-hydraulic Control Fluid Leak on 4 Governor Valve
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
ML20214T9124 June 1987Exam Rept 50-255/OL-87-01 on 870504-08.Exam Results:Both Senior Operator Candidates Passed.Exam & Answer Key Encl
ML20214U3264 June 1987Requalification Exam Rept 50-255/OL-87-02 of Exam Admininstered on 870505-08.Exam Results:Five Senior Operators & Four Operators Passed Exams
IR 05000255/198603528 May 1987Insp Rept 50-255/86-35 on 861216-870216.Violations Noted: Inadequate Review of Mod Package,Inadequate Procedures for Conduct of 10CFR50.59 Evaluations & Failure to Identify Modified Breakers as Class 1EBoric Acid
Packing leak
Stroke time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Unidentified leak
IR 05000255/198700720 April 1987Partially Withheld Insp Rept 50-255/87-07 on 870320-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Actions Re Opening of Physical Barrier,Security Plan & Implementing Procedures & IE Info Notice 86-083
PNO-III-87-053, on 870412,reactor Manually Tripped as Result of Leak in Electrohydraulic Control (EHC) Sys for Main Turbine.Caused by Fatigue Failure of Impeller of Pump in EHC Sys.Pump Repaired13 April 1987PNO-III-87-053:on 870412,reactor Manually Tripped as Result of Leak in Electrohydraulic Control (EHC) Sys for Main Turbine.Caused by Fatigue Failure of Impeller of Pump in EHC Sys.Pump Repaired
PNO-III-87-044C, on 870405,unit Completed Testing Activities at 30% Level & Increased Power at 45% for Further Testing & Review.Power Held at 45% for Repair of Valve in Cooling Tower Sys & Oil Flow in Main Feedwater Pump Bearing10 April 1987PNO-III-87-044C:on 870405,unit Completed Testing Activities at 30% Level & Increased Power at 45% for Further Testing & Review.Power Held at 45% for Repair of Valve in Cooling Tower Sys & Oil Flow in Main Feedwater Pump Bearing
PNO-III-87-044B, on 870403,unit Tied to Util Electrical Grid for First Time Since 860519 Reactor Trip.Licensee Began Plant Startup on 870327 But Returned to Cold Shutdown to Replace Failed Nuclear Instrument3 April 1987PNO-III-87-044B:on 870403,unit Tied to Util Electrical Grid for First Time Since 860519 Reactor Trip.Licensee Began Plant Startup on 870327 But Returned to Cold Shutdown to Replace Failed Nuclear Instrument