ML20211C324

From kanterella
Revision as of 22:07, 1 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1986 Re Unit Shutdowns & Power Reductions
ML20211C324
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/31/1986
From: Phillips M
Public Service Enterprise Group
To:
Shared Package
ML20211C309 List:
References
NUDOCS 8610210327
Download: ML20211C324 (1)


Text

OPERATING DATA REPORT ONIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-354 UNIT NAME Hope Creek Gen. Station DATE 09/ll/86 COMPLETED BYM. Phillips REPORT MONTH August '86 TELEPHONE (609) 339-3738

'~~

METHOD OF SHUTTING DOWN THE TYPE REACTOR OR

.F FORCED DURATION, REASON REDUCING CORRECTIVE ACTION /

NO. DATE S SCHEDULED (HOURS) (1) POWER (2) COMMENTS 10 8/1 S 149.75 B 1 Planned outage for drywell work.

11 8/8 F 84 A 1 Inoperable torus Vacuum breakers.

Reactor shutdown required by Tech Specs.

12 8/22 S 204.25 B 2 Shutdown from Outside the Control Room (Power Ascen-sion Test).

Nine day out-age to inspect Bailey Logic Cards.

13 8/31 F 18.5 A 3 Automatic Scram on Reactor low water level.

8610210327 861013 PDR ADOCK 05000354 R PDR

SUMMARY

Revised shutdown identification numbers.