ML20203K375

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Hcgs,Unit 1
ML20203K375
Person / Time
Site: Hope Creek 
Issue date: 11/30/1997
From: Todd F
Public Service Enterprise Group
To:
Shared Package
ML20203K366 List:
References
NUDOCS 9712220343
Download: ML20203K375 (6)


Text

,.,

,e e

? *h

c.

- s m,y t,,

-INDEX'-

?

.J.

_,--a' I

f NUMBER

'OF PAGES.

-SECTIONL 4

v Op e ra t in g Da ts : Repo r t _...'.. _....=......................'. 2_

L 1AverageiDailyc. Unit-Power Level

......................-...1 ERe f u e l i qq (I n f o rma t i on.. _.... :.......................... 1 nerating Summary._............................1c

.Mont' a

Summary of Changes,,. Tests, and Experiments'........... 41 I

Y

+

?

..t

~ _.

fokY!

o 1

!__2 m

1

4 i

DOCKET NO.: 354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:

F.

Todd TELEPHONF,:

(609) 339-1316 OPERATING DATA REPORT OPERATING STATUS 1

Reporting Period NOVEMBER 1997 Hours in Report 720 Period 2 _ Currently Authorized Power Level (MWt) 3293 Max Dependable Capacity (MWe-Net) 1031 Design Electrical Rating (MWe-Net) 1067 3

Power level to which restricted (if any) (MWe Net)

None 4

Reason For Restriction (if any)

This Month Yr To Cumulative Date 5

No. of hours reactor war critical 15.5 6073.2 79796.3 6

Reactor reserve shutdown hours 0.0 0.0 0.0 7

Hours generator on line 0

6058

/8618 8

Unit reserve shutdown hours 0.0 0.0 0.0 9

Gross thermal energy generated (MWH) 509 18834255 250702502 10 Gross electrical energy generated (MWH) 0 6285370 8317958.-

11 Net electrical energy generated (MWH) 0 6008693 79495544 4

12 Reactor Service factor 2.1%

75.8%

33.1%

13 Reactor availability factor 2.1%

75.8%

83.1%

14 Unit Service Factor 0.0%

75.6%

81.9%

15 Unit Availability Factor 0.0%

75.6%

81.9%

16 Unit Capacity Factor (MDC) 0.0%

72.6%

80.3%

17 Unit Capacity Factor (DER) 0.0%

70.2%

77.6%

78 Unit Forced Outage Rate 0.0%

1.0%

4.1%

19 Shutdowns scheduled over next 6 months (type, date, duration):

None

20 If shutdown at end of report-period, estimated date of

-Startup: 12/12/97

~,. _. -.

i DOCKET NO. : [50-354 UNIT: ' Hope Creek '

DATE: :12/10/97-

~*

COMPLETED BY:

F.

Todd TELEPHONE:- (609) 339-131'6 ~

OPERATING DATA ' DEPORT-UNIT SHUTDOWNS AND POWER REDUCTIONS i

-MONTH -NOVEMBER 1997-METHOD

+

OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED-DURATION' REASON.

REDUCING CORRECTIVE NO.

DATE S= SCHEDULED (HOURS)

-(1)

POWER ACTION / COMMENT (2) 1 11/1 S

720 Hrs C

-2 Refuel Outage

- 11/30 4

A Equipinent 1: Manual Failure 2 Manual B: Maint or Scram Test 3: Automatic C: Refueling Scram D: Regulatory 4: Other Restr10 tion E Oper tut Training.and Licensee Exam F:

Administ rative -

G1 Operational Error H: Other

-l

-1 1'

I DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:

F.

Todd

-TELEPHONE:

(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER 1997 DAY

. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO"ER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

k 2

0 18 O_

3 O_

19 0

4 0

20 0_

5 0

21 0

6 0

22 0

7 0

23 0

8 0_

24 0_

9 0

25 0

10 0_

26 O_

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0_

15 0

31 0

16 0

k

_~

DOCKET NO. :. : 50-354

~'

c. : t UNIT: Hope Creek DATE:'11/06/97 COMPLETED BY: R.-Ritzman-g TELEPHONE:1 (609) 339-14g'-

^

~

REFUELINGtINFORMATION

MONTH ' > NOVEMBER'1997 1

~

fl.

Refueling information has; changed from last. month:

Yes' X. -

No 2.

Scheduled. date for next-refueling -(RF08) : 2/13/99 3.

Scheduled date for restart following refueling:

3/19/99

'4A. Will Technical-Specification changes or other license

' amendments-be required?

Yes

_X_

No E

B.

Has'the Safety Evaluation. covering the COLR been reviewed by l

the' Station._ Operating Review Committee (SORC)7

-Yes No

_X

~If no, when is it scheduled?

To be determined 5 '. - Scheduled date (s) for_ submitting proposed licensing action:

To be determined

- 6.

_ Important licensing considerati~ons associated with refueling:

None-7.

Number of-Fuel Assemblies:

.A.

Incore 764 B.

In Spent Fuel. Storage-1708 8.

Present' licensed ~ spent' fuel storage capacity: ~4006 i

Future spent fuel storage capacity:

4006

~9.

Dat.e of%last_ refueling that can be discharged to spent fuel

~

poolJassumfng the present: licensed capacity:

5/3/2006(EOC13)

-(Does allow for ' full-core of f-load)

-(. Assumes 244-bundle reloads every 18 months until then)

[

..(Does not allow for smaller reloads due to improved-fuel) r-'

u:

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:

F.

Todd TELEPHONE:

(609) 339-1316 MONTHLY OPERATING

SUMMARY

MONTH NOVEMBER 1997 For the month of November, _he Hope Creek Generating Station continued the seventh refueling outage.