-INDEX'-
?
.J.
_,--a' I
f NUMBER
'OF PAGES.
-SECTIONL 4
v Op e ra t in g Da ts : Repo r t _...'.. _....=......................'. 2_
L 1AverageiDailyc. Unit-Power Level
......................-...1 ERe f u e l i qq (I n f o rma t i on.. _.... :.......................... 1 nerating Summary._............................1c
.Mont' a
Summary of Changes,,. Tests, and Experiments'........... 41 I
Y
+
?
..t
- ~ _.
fokY!
o 1
!__2 m
1
4 i
DOCKET NO.: 354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:
F.
Todd TELEPHONF,:
(609) 339-1316 OPERATING DATA REPORT OPERATING STATUS 1
Reporting Period NOVEMBER 1997 Hours in Report 720 Period 2 _ Currently Authorized Power Level (MWt) 3293 Max Dependable Capacity (MWe-Net) 1031 Design Electrical Rating (MWe-Net) 1067 3
Power level to which restricted (if any) (MWe Net)
None 4
Reason For Restriction (if any)
This Month Yr To Cumulative Date 5
No. of hours reactor war critical 15.5 6073.2 79796.3 6
Reactor reserve shutdown hours 0.0 0.0 0.0 7
Hours generator on line 0
6058
/8618 8
Unit reserve shutdown hours 0.0 0.0 0.0 9
Gross thermal energy generated (MWH) 509 18834255 250702502 10 Gross electrical energy generated (MWH) 0 6285370 8317958.-
11 Net electrical energy generated (MWH) 0 6008693 79495544 4
12 Reactor Service factor 2.1%
75.8%
33.1%
13 Reactor availability factor 2.1%
75.8%
83.1%
14 Unit Service Factor 0.0%
75.6%
81.9%
15 Unit Availability Factor 0.0%
75.6%
81.9%
16 Unit Capacity Factor (MDC) 0.0%
72.6%
80.3%
17 Unit Capacity Factor (DER) 0.0%
70.2%
77.6%
78 Unit Forced Outage Rate 0.0%
1.0%
4.1%
19 Shutdowns scheduled over next 6 months (type, date, duration):
None
- 20 If shutdown at end of report-period, estimated date of
-Startup: 12/12/97
~,. _. -.
i DOCKET NO. : [50-354 UNIT: ' Hope Creek '
DATE: :12/10/97-
~*
COMPLETED BY:
F.
Todd TELEPHONE:- (609) 339-131'6 ~
OPERATING DATA ' DEPORT-UNIT SHUTDOWNS AND POWER REDUCTIONS i
-MONTH -NOVEMBER 1997-METHOD
+
OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED-DURATION' REASON.
REDUCING CORRECTIVE NO.
DATE S= SCHEDULED (HOURS)
-(1)
POWER ACTION / COMMENT (2) 1 11/1 S
720 Hrs C
-2 Refuel Outage
- 11/30 4
A Equipinent 1: Manual Failure 2 Manual B: Maint or Scram Test 3: Automatic C: Refueling Scram D: Regulatory 4: Other Restr10 tion E Oper tut Training.and Licensee Exam F:
Administ rative -
G1 Operational Error H: Other
-l
-1 1'
I DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:
F.
Todd
-TELEPHONE:
(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER 1997 DAY
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO"ER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
k 2
0 18 O_
3 O_
19 0
4 0
20 0_
5 0
21 0
6 0
22 0
7 0
23 0
8 0_
24 0_
9 0
25 0
10 0_
26 O_
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0_
15 0
31 0
16 0
k
_~
DOCKET NO. :. : 50-354
~'
- c. : t UNIT: Hope Creek DATE:'11/06/97 COMPLETED BY: R.-Ritzman-g TELEPHONE:1 (609) 339-14g'-
^
~
REFUELINGtINFORMATION
- MONTH ' > NOVEMBER'1997 1
~
fl.
Refueling information has; changed from last. month:
Yes' X. -
No 2.
Scheduled. date for next-refueling -(RF08) : 2/13/99 3.
Scheduled date for restart following refueling:
3/19/99
'4A. Will Technical-Specification changes or other license
' amendments-be required?
Yes
_X_
No E
B.
Has'the Safety Evaluation. covering the COLR been reviewed by l
the' Station._ Operating Review Committee (SORC)7
-Yes No
_X
~If no, when is it scheduled?
To be determined 5 '. - Scheduled date (s) for_ submitting proposed licensing action:
To be determined
- 6.
_ Important licensing considerati~ons associated with refueling:
None-7.
Number of-Fuel Assemblies:
.A.
Incore 764 B.
In Spent Fuel. Storage-1708 8.
Present' licensed ~ spent' fuel storage capacity: ~4006 i
Future spent fuel storage capacity:
4006
~9.
Dat.e of%last_ refueling that can be discharged to spent fuel
~
poolJassumfng the present: licensed capacity:
5/3/2006(EOC13)
-(Does allow for ' full-core of f-load)
-(. Assumes 244-bundle reloads every 18 months until then)
[
..(Does not allow for smaller reloads due to improved-fuel) r-'
u:
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/10/97 COMPLETED BY:
F.
Todd TELEPHONE:
(609) 339-1316 MONTHLY OPERATING
SUMMARY
MONTH NOVEMBER 1997 For the month of November, _he Hope Creek Generating Station continued the seventh refueling outage.