ML20211C316

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1986
ML20211C316
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/30/1986
From: Phillips M
Public Service Enterprise Group
To:
Shared Package
ML20211C309 List:
References
NUDOCS 8610210323
Download: ML20211C316 (5)


Text

_ ._

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-353 _

UNIT _]LQps_CIggh_Ggn. Statios DATE _lH/lH/B6-COMPLETED BY _Mikg_Phillips TELEPHONE _.(6H91_339:3738 September 1986 MONTH - -

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 0 1 _ _ _ _ _ _ _ _ _ _ _ ______ 17 _ _ _ _ __

8 0 2 - - 18 0 0 3 19 -

0 0 4 =_

20 _ - _

52 0 5 -_

21 _ _ _ _ _ _ _

40 0 6 _ _ _ _

_ _ 22 160 0 7 23 -

294 0 8 __

24 - - - -

264 0 9 _______

_ _ _ _ 25 _

10 -- 26 _ _ - -

144 0 11 - _ ___

27

O O i 12 _

28 0 0 13 _ _ _ _ _ _ __ _ - . __ ______ 29 0 0 14 __

_ _ _ 30 - - - _ _ _

~0 0 15 __

31 0

16 - - - - - - -

e610210323 861013 4 Daily BW PDR ADOCK 0500 24 R

OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-354 UNIT NAMEHope Creek Gen. Station DATE 10/10/86 COMPLETED BYM. Phillips REPORT MONTH Sept '86 TELEPHONE (609) 339-3738

~

METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION, REASON REDUCING CORRECTIVE ACTION /

NO. DATE S SCHEDULED (HOURS) (1) POWER (2) COMMENTS 13 9/1 F 16.3 A 3 Continued from Previous Month.

Reactor Scram Due to Low Water Level.

14 9/6 F 12.5 A 3 Reactor Lo Level Scram. Problems with Feedwater Control

~

15 9/11 S/F 460 B 2 Loss of Power Test --

Continued Outage for Problem Resolution

SUMMARY

l t

OPERATING DATA REPORT DOCKET NO.90-194 UNIT Hona crook can- Statio5 DATE 10/10/R6 COMPLETED BY M. Shi114na (609L 110'371R TELEPHONE -

OPERATING STATUS

1. REPORTING PERIOD _E_gp.t_'jf GROSS HOURS IN REPORTING PERIOD J.2.0__ _
2. CURRENTLY AUTHORIZED POWER LEVEL-(MWt) 3233___

MAX. DEPEND. CAPACITY (MWe-Net)________ljj]__

DESIGN ELECTRICAL RATING (MWe-Net) ljf]_

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) Nnna'
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL _232_ lllf_ _.117E____
6. REACTOR RESERVE SHUTDOWN HOURS __j__ __2__ ____E_____
7. HOURS GENERATOR ON LINE _151_ _334_ 334____.
8. UNIT RESERVE SHUTDOWN HOURS G G H l
9. GROSS THERMAL ENERGY GENERATED (MWH) 151.392 283+232__283,232_

.10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 31.430 58,020 __58,220__

11. NET ELECTRICAL ENERGY GENERATED (MWH) 21.215 26,Ha2 96,882__
12. REACTOR SERVICE FACTOR -
13. REACTOR AVAILABILITY FACTOR =
14. UNIT SERVICE FACTOR -

=-

15. UNIT AVAILABILITY FACTOR _
16. UNIT CAPACITY FACTOR (Using Design MDC) --- ___ - -
17. UNIT CAPACITY FACTOR (Using Design MWe) -
18. UNIT FORCED OUTAGE DATE -
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY s/99/ns INITIAL ELECTRICITY n'/1 /n c ~

COMMERCIAL OPERATION 1 ? /19 / A 6

r SCHEDULED SHUTDOWNS-(ITEM 19) g DATE DUBATIDE

1. LOP Test - Scram 10/11/86 3 days
2. MSIV Isolation - Scram 12/01/86 2 days
3. Load Rejection - Scram 12/04/86 4.5 days a

4 I

e i

)

i

.- _, , _ . . _ _, _ _ . . . . , . _ _ , . _ _ , _ _ _ , _ . . _ _ , , _ , . , . _ - - . . . , , , . _ _ - . . _ _ . _ . . . , - _ - . _ _ _ _ _ , _ _ _ _ . - . _ . . _ _ _ . . - - -., _ . . ~ . -

HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

SEPTEMBER 1986 The unit entered Test Conditi~on 2 (20% power plateau) on August 31, 1986 and conducted various startup tests during the month of September. One unplanned unit scram occurred on September 6 due to feed pump problems. The feed pumps were undergoing tuning and pump control problems resulted in a feed pump trip and subsequent scram on low level. The loss of offsite power test was attempted on September 11, 1986 however various anomolies resulted in the test being aborted. The test revealed a number of design, equipment, and procedural problems which were addressed by plant management.

A cold loss of power test was run on September to review again the plant response. The second test revealed some additional problems and clarified other previous ~ observations. Due to the nature of the test and observed anomolies, an NRC Augmented Inspection Team arrived on site on September 25 to review the test and subsequent findings. In addition, NRC Region 1 issued a Confirmatory Action Letter to the station restricting plant startup testing until a review of the test was completed by the NRC. The plant remained in COLD SHUTDOWN condition for the remainder of the month.

WJM:tlb