Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With
ML20198D639
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/30/1998
From: Bezilla M, Ritzman R, Todd F
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N980580, NUDOCS 9812230151
Download: ML20198D639 (6)


Text

. - = . - - _ - . .

~

. o psgG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 0236 Nuclear Business Unit DEC 151998 LR-N980580 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 _

DOCKET NO. 50-354 in compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for Novensber 1998 are being forwarded. Also being forwarded to you, pursuant to the requirements of 10CFR50.59(b), is the summary of changes, tests, and experiments that were implemented during November 1998.

I Sincerely, V

Mark B. Bezilla General Maruger -

Hope Creek Operations RAR/mw Attachments e C Distribution 9812230151 981130 PDR ADOCK 05000354 R PDR,;f The}xrwerisinyourhands a m anev m

.- .. .. l INDEX i

. 1 i

NUMBER SECTION OF PAGES O pe ratin g D ata Re p o rt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 l Monthly Operating S um ma ry. . . . .. .. ... ... .. . . . ... .. . . .... . . . .. . . . . . . . .... .. .. . .. . . .. . . . . . . . . . . 1 Summary of Changes, Tests, and Experiments...... ... ... ... ... .. . ... ... ... ... .. 2 I

i l

t i

l l

l t

l i

I 4'

4

'i y a- v ~ . - - - - - - - - - , _ -, -,-.,-e.- , , -

...x..

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/14/98 COMPLETED BY: F.Todd TELEPHONE: (609) 339-1316 Reporting Period November 1998 l

OPERATING DATA REPORT

~

Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net) 1031 i

Month Year-to-date Cumulative No. of hours reactor was critical 549 l7845 l 88385 l l No. of hours generator was en line (service 499 7795 l 86865 hours) l Unit reserve shutdown hours 0 l0 l0 l l Net Electrical Energy (MWH) 481496 l 7923602 l 87820754 l UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION /

F= FORCED (HOURS) (1) SHUTTING COMMENT S= SCHEDULED DOWN THE REACTOR (2) 1 11/15 F 221 hrs A 3 Moisture Separator Drain Tank Dump Valve Failure See LER 354/98-008-00 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual

, B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram l

D - Regulatory Restriction 4 - Continuation

E - Operator Training / License Examination o - Other (Explain)
F - Administrative G - Operational Error (Explain) l H - Other i

, ..y

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 12/14/98 COMPLETED BY: R. Ritzman TELEPHONE: (609) 339-1445 Summary Of Monthly Operating Experience

. Hope Creek entered the month of November at approximately 100% reactor power.

. On November 15, at 0922, the main turbine tripped due to "A" moisture separator high level and the reactor scrammed automatically in response to the closure of the turbine control valves.

. The reactor was returned to criticality on November 22, at 1624, and the unit was synchronized to the grid on November 24, at 1410. Reactor power was restored to 100% on November 27, at 1310.

. At the end of the month, Hope Creek had completed its 6* day of continuous power operation.

, g

, DOCKET NO.:50-354 UNIT: Hope Creek DATE:12/14/98 COMPLETED BY:R. Ritzman TELEPHONE: (609) 339-1445 l

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS l FOR THE HOPE CREEK GENERATING STATION MONTH NOVEMBER 1998 The following items completed during November 1998 have been evaluated to determine:

1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
3. If the margin of safety as defined in the basis for any technical specification is reduced.

The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant nor did they affect the safe shutdown of the reactor. These itemt did not change the plant effluent releases and did not alter the existing environmentalimpact. The 10CFR50.59 Safety Evaluations determined that no unreviewed safety or environmental questions are involved.

Design Changes Summary of Safety Evaluations There were no reportable changes in this category implemented during November 1998.

Temporary Modifications Summary of Safety Evaluations There were no reportable changes in this category implemented during November 1998.

g-Procedures Summary of Safety Evaluations H'C.SA-AP.ZZ-0039(Q), Revision 7, Receipt of New Fuel. This procedure revision changes the new fuel receipt process by adding a new process to transport metal shipping containers, increasing the number of shipping containers that may be stored in the reactor building receiving bay and the refueling floor, changing departmental responsibilities, and making editorial changes.

Neither the probability nor the consequences of dropping a shipping crate or inner shipping container on spent fuel, fuel storage areas, reactor vessel, or spent fuel pool are changed by this procedure revision. No safety-related, safe shutdown, or decay heat removal equipment is located on the floor of the reactor building, or below the height at which the containers will be carried. The new process is bounded by the current load drop analysis. This proposal does not increase the possibility or consequences of any accident or malfunction, does not reduce the margin of safety, and therefore, does not involve an Unreviewed Safety Question.

UFSAR Change .4otices Summary of Safety Evaluations There were no reportable changes in this category implemented during November 1998.

Deficiency Reports Summary of Safety Evaluations There were no reportable changes in this category implemented during November 1998.

Other Summary of Safety Evaluation There were no reportable changes in this category implemented during November 1998.