MONTHYEARML20236E9491998-06-30030 June 1998 Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 ML20217K3261997-09-0808 September 1997 Rev 3 to NFS-0145, Hope Creek Generating Station COLR Cycle 7/Reload 6 ML20210Q6291997-06-20020 June 1997 Rev 2 to NFS-0145, Hope Creek Generating Station COLR Cycle 7/Reload 6 ML20210Q6081997-06-0505 June 1997 Rev 1 to NFS-0145, Hope Creek Generating Station COLR Cycle 7/Reload 6 ML20101E5921996-01-25025 January 1996 COLR Cycle 7/Reload 6 ML20094F8551995-09-25025 September 1995 Rev 1 to Core Operating Limits Rept for Hope Creek Generating Station,Cycle 6/Reload 5 ML20029D3781994-02-24024 February 1994 Nonproprietary Rev 0 to NFS-0090, Core Operating Limits Rept Hope Creek Generating Station Cycle 6/Reload 5. ML20072N8411994-02-24024 February 1994 Resubmitted COLR Hope Creek Generating Station Cycle 6/ Reload 5 ML20064F7181994-01-31031 January 1994 Rev 1 to Core Operating Limits Rept for Hope Creek Generating Station Cycle 5/Reload 4 ML20077C5131993-11-30030 November 1993 Supplemental Reload Licensing Rept for Hope Creek Generating Station Unit 1 Reload 5,Cycle 6 ML20115H2971992-09-10010 September 1992 Rev 0 to COLR Hope Creek Generating Station,Cycle 5/Reload 4 ML20028H7311990-12-14014 December 1990 Core Operating Limits Rept,Hope Creek Generating Station, Cycle 4/Reload 3. ML19332C7731989-09-0101 September 1989 Core Operating Limits Rept,Hope Creek Generating Station, Cycle 3/Reload 2. ML20237C2381987-11-30030 November 1987 Nonproprietary Rev 1 to Supplemental Reload Licensing Submittal for Hope Creek Generating Station Unit 1,Reload 1 (Cycle 2) 1998-06-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F1501999-10-12012 October 1999 Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20217M0211999-09-20020 September 1999 Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG ML20211N5531999-09-0808 September 1999 Safety Evaluation Supporting Amend 121 to License NPF-57 ML20211B3781999-08-13013 August 1999 Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8331999-07-26026 July 1999 Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History ML20216D8721999-07-26026 July 1999 Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 ML20210F3331999-07-22022 July 1999 Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8901999-06-30030 June 1999 IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206Q4731999-05-14014 May 1999 SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8451999-04-30030 April 1999 Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 ML20206C8481999-04-22022 April 1999 SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) LR-N990157, Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced1999-04-12012 April 1999 Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20205G6051999-03-19019 March 1999 SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 ML20205F8911999-03-18018 March 1999 Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20202F6861999-01-26026 January 1999 Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers ML18107A1871998-12-31031 December 1998 PSEG Annual Rept for 1998. ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With ML18107A1881998-12-31031 December 1998 PECO 1998 Annual Rept. LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With ML20198N4161998-11-12012 November 1998 MSIV Alternate Leakage Treatment Pathway Seismic Evaluation LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with ML20155J9861998-10-31031 October 1998 Non-proprietary TR NEDO-32511, Safety Review for HCGS SRVs Tolerance Analyses LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 ML20236E9491998-06-30030 June 1998 Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 ML18106A6821998-06-24024 June 1998 Revised Charting Our Future. ML18106A6681998-06-17017 June 1998 Charting the Future. LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 ML20248C7381998-05-22022 May 1998 Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML18106A5851998-03-0303 March 1998 Emergency Response Graded Exercise,S98-03. Nuclear Business Unit Salem,Hope Creek Emergency Preparedness, 980303 1999-09-08
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
GENuclearEnergy 24A5392AB Revision 0 Class I June 1998 I
Lattice Dependent MAPLHGR Report for HOPE CREEK GENERATING STATION Reload 7 Cycle 8 78871888R8!88883.
P PDR !'
. GE Nuclear Energy 24A5392AB Revision 0 Class I June 1998 24A5392AB, Revision 0 Lattice Dependent MAPLHGR Report for Hope Creek Generating Station l Reload 7 Cycle 8 l
l l
i Af Approved
. A. ford Nuclear Fuel Engineering l
[
1
HOPE CREEK 24A5392AB Reload 7 Rev.O Important Notice Regarding Contents of This Report l
l Please Read Carefully This report was prepared by General Electric Company (GE) solely for Public Service Electric and Gas Company (PSE&G) and the U.S. Nuclear Regulatory Commission (USNRC). The information contained in this report is believed by GE to be an accurate and true representation of the facts known, obtained or provided to GE at the time this report was prepared.
The only undertakings of GE respecting information in this document are contained in the contract between PSE&G and GE for nuclear fuel and related services for the nuclear system for Hope Creek Generating Station Unit 1 and nothing contained in this document shall be construed as changing said contract. The use of this information except as de-fined by said contract, or for any purpose other than that for which it is intended, is not authorized; and with respect to any such unauthorized use, neither GE nor any of the contributors to this document makes any representation or warranty (express or implied) as to the completeness, accuracy or usefulness of privately owned rights; nor do they assume any responsibility for liability or damage of any kind which may result from such use of such information.
Page 2
HOPE CREEK 1 24A5392AB Reload 7 Rev.0 This document is a non-proprietary version of document 24A5392AA Revision 1.
l l
l l
. l l
Page 3 l
l
HOPE CREEK 1 24A5392AB Reload 7 Rev.0
- 1. Introduction and Summary This repon, which supplements the Supplemental Reloadlicensing Report, contains maximum average pla-nar linear heat generation rate (MAPLHGR) values for the GE Nuclear Energy fuel designs to be loaded into Hope Creek Generating Station for Cycle 8. These MAPLHGR values are a composite of results obtained from both thermal-mechanical and emergency core cooling system (ECCS) considerations. Approved GE Nuclear Energy calculation models documented in Reference 1 were used in performing this analysis.
MAPLHGR values as a function of exposure for each lattice of the fuel design are given in Appendix A. Peti clad temperatures (PCT) and oxidation fractions are also documented.
Appendix B contains descriptions of the fuel bundles. Table B-1 contains a summary of bundle-specific in-formation, and the figures provide the enrichment distribution and gadolinium distribution for the fuel bundles included in this appendix. These fuel bundles are included in Reference 2 (latest revision).
4 3
Page 4
HOPE CREEK 1 24A5392AB
- Rsioid 7 Rev.0
- 2. References
- 1. GeneralElectric Standard Applicationfor Reactor Fuel, NEDE-24011-P-A-13, August 1196; and the \
U.S. Supplement, NEDE-24011-P-A-13-US, August 1996.
- 2. GE Fuel Bundle Designs, NEDE-31152P, December 1988 (as revised).
l 4
4 i
l I
Page 5
HOPE CREEK 1 24A5392AB Reload 7 Rev.O Appendix A MAPI.HGR Versus Average Planar Exposure Bundle Type: GE9B-P8CWB327-8GZl-80U-150-T (GE8x8NB)
Bundle Number: 2246 hiAPLHGR Linnits (kW/ft)
Average Planar Exposure' Lattice Lattice Lattice Lattice Lattice GWd/MT(GWd/ST) 2124 2401 2402 2403 2404 Page 6
HOPE CREEK 1 24A5392AB Reload 7 Rev.0 Appendix A MAPLHGR Versus Average Planar Exposure Bundle Type: GE9B-P8CWB298-8GZ-80U-150-T (GE8x8NB)
Bundle Number: 2247 MAPLHGR Limits (kW/ft)
Average Planar Exposure,
. Lattice Lattice Lattice Lattice Lattice GWd/MT(GWd/ST) 2124 2405 2406 2407 2408 1
i l
i a
Page 7
HOPE CREEK 1 24A5392AB Reload 7 Rev.O Appendix A Peak Clad Temperature (PCT) and Oxidation Fraction Bundle Type: GE9B-P8CWB327-8GZl-80U-150-T (GE8x8NB)
Bundle Number: 2246 Average Planar Exposure PCT Oxidation (GWd/MT) (*F) Fraction Page 8
HOPE CREEK 1 24A5392AB Reload 7 Rev.O Appendix A Peak Clad Temperature (PCT) and Oxidation Fraction Bundle Type: GE9B-P8CWB298-8GZ-80U-150-T (GE8x8NB) '
Bundle Number: 2247 *.. .
~N Average Planar Exposure PCT Oxidation '
(GWd/MT) ( F) Fraction O
Page 9
HOPE CREEK 1 24A5392AB Reload 7 Rev.O Appendix B Fuel Bundle Information Table B-1 Bundle Specific Information EDB Weight Weight Exposure Fuel Bundle Enrichment of UO2 of U Max at Max kg, Bundle Number (wt% U-235) (kg) (kg) kw GWd/MT (GWd/ST)
GE9B-P8CWB327- 2246 8GZl-80U-150-T (GE8x8NB)
GE9B-P8CWB298- 2247 8GZ-80U-150-T (GE8x8NB)
Page 10
HOPE CREEK 1 24A5392AB Reload 7 Rev.0 Figure B-1 Enrichment and Gadolinium Distribution for EDB No. 2246 Fuel Bundle GE9B-P8CWB327-8GZ1-80U-150-T Page 11
~
HOPE CREEK 1 24A5392AB Reload 7 Rev.0
=a Figure B-2 Enrichment and Gadolinium Distribution for EDB No. 2247 Fuel Bundle GE9B-P8CWB298-8G7 -80U-150-T Page 12
- ___-_