DOCKET NO.: 50-354 UNIT: Hope Creek i
DATE: 01/09/98 COMPLETED BY: _
Todd
' F.
TELEPHONE:
(609) 339-1316-l f
OPERATING DATA REPORT OPERATING' STATUS 1-Reporting Period DECEMBER 1997-Hours in Report 744 Period 2
Currently Authorized Power Level (MWt) 3293-Max Dependable Capacity (MWe-Net) 1031 Design Electrical Rating (MWe-Net) 1067 3
Power level to which restricted (if any) (MWe Net)
None 4
Reason Fcr Restriction (if any)
This Month Yr To Cumulative Date 5
No. of hours reactor was critical 744.0 6817.2 80540.3 6
Reactor reserve shutdown hours 0.0 0.0 0.0 l
7 Hours generator on line 453 6510 79070 8
Unit reserve shutdown hours 0.0 0.0 0.0 9
Gross thermal energy generated (MWH) 1299010 20133265 252001512 10 Gross electrical energy generated (MWH) 428860 6714230 83608443 11 Net electrical energy generated (MWH) 401608 6400982 79880378 12 Reactor Service factor 100.0%
77.8%
83.3%
'13 Reactor availability factor 100.0%
77.8%
83.3%
14 Unit Service Factor 60.8%
74.3%
81.'7%
l15 Unit Availability Factor 60.8%
74.3%
81.7%
16 -Unit Capacity. Factor (MDC) 52.4%-
70.9%
80.1%
17 Unit Capacity Fsetor (DER) 50.6%
68.5%-
77.4%-
18 Unit-Forced Outage Rate 0.0%
0.9%
'4.1%
- 19. Shutdowns scheduled'over next 6 months (type, date,
-iduration) :
20SIf-shutdown at end of report period, estimated date of Startup:;
9901270039 990115 DR ADOCK 05000354' PDRJ l
e q
w g
y g-rr "ey
--y4
-cg,-
p-m
- ~..
DOCKET NO.: ~50-354 UNIT: ' Hope Creek
~
DATE :: : 01/ 09/ 97 COMPLETED BY:
F.
Todd-TELEPHONE: 3 09) 339-1316 OPERATING DATA REPORT
-UNIT SHUTDOWNS AND-POWER REDUCTIONS MONTH DECEMBER 1997 METHOD OF SHUTTING DOWN THE TYPE REACTOR l
OR i
F= FORCED DURATION REASON REDUCING CORRECTIVE NO.
DATE S= SCHEDULED (HOURS).
_ (1)
POWER ACTION / COMMENT (2) 1 12/1 S
291.5 C
2 Refuel Outage 1
Hrs.
Extension
- 12/13-3.-
At Equipment 1: Manual Failure 2: Manual at Maint or Scram Test 31 Automatic C: Refueling Scram D Regulatory 4: Other Restriction El Operator Training and Licensee Exam F1 Mm1Sie t r a t ive._
G Operational Error' H Other-i 5
4
.r-y
.... _. -...._-.. ~..... - -. _.
ll
' DOCKET NO.;-50 354-1
' UNIT: ' Hope Creek:
- i DATE: 01/09/98-
'f COMPLETED-BY:
F.
Todd i
-TELEPHONE: -(609) 339-1316=
t Y
AVERAGE DAILY UNIT POWER LEVEL
-MONTH DECEMBER 1997 DAY.. AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL
.(MWe-Net)
(MWe-Net)'
.l
-1 0
17 880 2
0.
18 1,024 l
r3-0 19 917 T4-
-01 20 1,063 5
0 21 1,058 E6" 0
22 1,039 l
?
0 23 1,'039 8-
'O 24 1,101 9
0 25 1,009 10 0-
_26 1,100 f
11-0 27 1,042 12
.0 28 1,090 13 166 29 1,061 11 4 306 30-
.1,060 15 406 31 1,067.
~
L16 -
-587:
~
t
... ~ -.. -. - -
~
DOCKET NO.: 50-354:
UNIT: Hope Creek:
DATE:.11/06/97 COMPLETED BY.:
R. Ritzman TELEPHONE:. (609) 339-1445
-REFUELING INFORMATION' MONTH DECEMBER 1997 1.: -Refueling information has changed from last' month:.
Yes No -
X 2.
. Scheduled date for next refueling (RF08) : 2/13/ 99
- 13. - Scheduled date for restart following refueling:
-3/19/99 4A. ' W111 Technical ~ Specification changes ' or other license
-amendments be requireu?
Yes
- _X_,
No B.
Has the: Safety Evaluationfcovering the_COLR been reviewed by
[
the Station Operating Review Committee (SORC)7 Yes LNo X
If no, when is it scheduled?
To be determined 5.
Scheduled date(s) for submitting proposed licensing action:
To be determined 6._ - Important licensing considerations. associated with refueling:-
None 7.
Number of-Fuel Assemblies:
-A.
Incore 764
~B..
In Spent: Fuel Storage 1708 8.
Present licensed spent' fuel storage capacity: 4006
- -Future spent fuel storage = capacity:
4006
-- Date of'last. refueling that can be discharged to spent fuel lpooloassuming.the present licensed capacity:
5/3/2006(EOC13)-
-(DoesLallow for full-core off-load)
.(Assumes'244 bundle reloads every.18 months until then)
(DoesLnotaallow for smaller reloads due'to' improved fuel) i p
r;
^
i ::-
--2 l'
, 1 -
j
-- ?
A DOCKETLNO.:: 354-4 UNIT:' Hope - Creek DATE : - ' 01/14 / 97 :
i COMPLETED BY:
F. :Todd :
TELEPHONE:
(609) 339-1316 l
t i
MONTHLY OPERATING SUbe4ARY -
' DECEMBER 1997 MONTH
- ~
.p I
At the beginning.of the month of December,-the Hope Creek Generating-Station: continued its seventh refueling-
[
outage.
_1 t
Hope Creek was synchronized to the grid on December 13,
-j 1997.
- i At-the end of the month, Hope Creek eqmpleted its 18th consecutive day of continuous _ operation.
e i
e s...
s t
i
=
Y i
l T
Ni s
( -
a p
D.
i s
p 4v.-u m ee 9 g y
y p*-.ev 3.g:-
5 eta.y we-aey sd tra e-rg-wM,e-c p
='WW y @
e g
g
- y+W ga$ v den TT+
9*'F