. . - . . - . . _ . - , _ _ . . _ _. .

+

DOCKET NO.: 50-354 UNIT: Hope Creek i DATE: 01/09/98 ,

COMPLETED BY: _' F. Todd TELEPHONE: (609) 339-1316-l OPERATING DATA REPORT f OPERATING' STATUS 1- Reporting Period DECEMBER 1997- Hours in Report 744 Period ,

2 Currently Authorized Power Level (MWt) 3293-  :

Max Dependable Capacity (MWe-Net) 1031 .

Design Electrical Rating (MWe-Net) 1067

  • 3 Power level to which restricted (if any) (MWe Net) None
  • 4 Reason Fcr Restriction (if any)

This Month Yr To Cumulative Date 5 No. of hours reactor was critical 744.0 6817.2 80540.3 6 Reactor reserve shutdown hours 0.0 0.0 0.0 l 7 Hours generator on line 453 6510 79070 8 Unit reserve shutdown hours 0.0 0.0 0.0 9 Gross thermal energy generated (MWH) 1299010 20133265 252001512 10 Gross electrical energy generated (MWH) 428860 6714230 83608443 11 Net electrical energy generated (MWH) 401608 6400982 79880378 .

12 Reactor Service factor 100.0% 77.8% 83.3% ,

'13 Reactor availability factor 100.0% 77.8% 83.3%

14 Unit Service Factor 60.8% 74.3% 81.'7%

l15 Unit Availability Factor 60.8% 74.3% 81.7%

16 -Unit Capacity. Factor (MDC) 52.4%- 70.9% 80.1%

17 Unit Capacity Fsetor (DER) 50.6% 68.5%- 77.4%-

18 Unit-Forced Outage Rate 0.0% 0.9% '4.1%

19. Shutdowns scheduled'over next 6 months (type, date,

-iduration) :

20SIf- shutdown at end of report period, estimated date of Startup:;

9901270039 DR 990115 ADOCK 05000354' PDRJ l

y g-rr "ey -cg,- p- m e q w g < --y4 -.-

- ~.. . . . . . . - . . . - - - . - -- . . - - . . --, ._. ...- .. . , . .

DOCKET NO.: ~50-354 UNIT: ' Hope Creek ~

DATE :: : 01/ 09/ 97 COMPLETED BY: F. Todd-TELEPHONE: 3 09) 339-1316 OPERATING DATA REPORT .

-UNIT SHUTDOWNS AND-POWER REDUCTIONS MONTH DECEMBER 1997  ;

METHOD OF SHUTTING >

DOWN THE TYPE REACTOR l OR i F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) . _ (1) POWER ACTION / COMMENT (2) 1 12/1 S 291.5 C 2 Refuel Outage 1 Hrs. Extension

12/13-3 .-

At Equipment 1: Manual Failure 2: Manual at Maint or Scram Test 31 Automatic C: Refueling Scram D Regulatory 4: Other Restriction El Operator Training and Licensee Exam F1 Mm1Sie t r a t ive ._

G Operational Error' H Other-i 5

- .r- y

. - . - - . . - . - . _ , . - - . - .. - .. .. . .. .. _ . - . ..._- .. ~ . .... - - . _. - -

ll  ;

' DOCKET NO.;-50 1354- .!

' UNIT: ' Hope Creek: - i DATE: 01/09/98- 'f COMPLETED-BY: F. Todd i

-TELEPHONE: -(609) 339-1316=

t Y

AVERAGE DAILY UNIT POWER LEVEL

-MONTH DECEMBER 1997 DAY. . AVERAGE DAILY POWER LEVEL- DAY AVERAGE DAILY POWER LEVEL

.(MWe-Net)

(MWe-Net)' .l >

-1 0 17 880  ;!

2 0. 18 1,024 l r3- 0 19 917 T4- -01 20 1,063 5 0 21 1,058 E6" 0 22 1,039 l  ? 0 23 1,'039 .

8- 'O 24 1,101 9 0 25 1,009 10 0- _26 1,100 f

, 11- 0 27 1,042 12 .0 28 1,090 13 166 29 1,061 11 4 306 30- .1,060 15 406

~

31 1,067.

L16 - -587:

~

t

. . - -. - . - - - . . . . ~ - . . - . - - ~_ - . . . . . .

DOCKET NO.: 50-354:

UNIT: Hope Creek:

DATE:.11/06/97 COMPLETED BY.: R. Ritzman TELEPHONE:. (609) 339-1445

-REFUELING INFORMATION' MONTH DECEMBER 1997 1.: -Refueling information has changed from last' month:.

Yes - No - X

2. . Scheduled date for next refueling (RF08) : 2/13/ 99
13. - Scheduled date for restart following refueling:

-3/19/99 4A. ' W111 Technical ~ Specification changes ' or other license

-amendments be requireu?

Yes - _X_, No B. Has the: Safety Evaluationfcovering the_COLR been reviewed by

[ the Station Operating Review Committee (SORC)7 Yes LNo X If no, when is it scheduled? To be determined

5. Scheduled date(s) for submitting proposed licensing action:

To be determined 6._ - Important licensing considerations. associated with refueling:-

. None

7. Number of-Fuel Assemblies:  ;

-A.

Incore 764

~B.. In Spent: Fuel Storage 1708

8. Present licensed spent' fuel storage capacity: 4006

- -Future spent fuel storage = capacity:

-- 4006 Date of'last. refueling that can be discharged to spent fuel lpooloassuming.the present licensed capacity: 5/3/2006(EOC13)-

-(DoesLallow for full-core off-load)

.(Assumes'244 bundle reloads every.18 months until then)

(DoesLnotaallow for smaller reloads due'to' improved fuel) i
:-

p

^

r; i ::- .

l' --2

.. .- . ,.1 - . j

. -- ?

A DOCKETLNO.:: 354-4 UNIT:' Hope - Creek DATE : - ' 01/14 / 97 : i COMPLETED BY: F. :Todd :

TELEPHONE: (609) 339-1316 l t

i MONTHLY OPERATING SUbe4ARY -  !

MONTH - ' ~DECEMBER 1997

.p

  • At the beginning.of the month of December,-the Hope Creek I Generating-Station: continued its seventh refueling- [

outage. _1 t

  • Hope Creek was synchronized to the grid on December 13, -j 1997. -i

-* At-the end of the month, Hope Creek eqmpleted its 18th ,

consecutive day of continuous _ operation.