Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1
ML20199G559
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/31/1997
From: Todd F
Public Service Enterprise Group
To:
Shared Package
ML20199G546 List:
References
NUDOCS 9711250209
Download: ML20199G559 (5)


Text

..,-

~..

DOCKET NO.: 50-354L

-UNIT: Hope Creek DATE: 11/06/97

-COMPLETED BY: F.-Todd

~ TELEPHONE:

(609) 339-1316-OPERATING DATA REPORT-OPERATING STATUS 1

Reporting-Period October 1997:

Hours in_ Report 745 Period 2:

Currently _ Authorized 'ower Level _ (MWt) 3293 Max l Dependable Capacity (MWe-Net) 1031 Design Electrical-Rating (MWe-Net) 1067 3

Power' level to which restricted (if any) _.(MWe Net)

None

,4 Reason For Restriction (if any)

This Month Yr To Cumulative Date 5

No..of hours reactor was critical 0

6058 79781 6

Reactor reserve shutdown hours 0.0 0.0 0.0 7

l Hours generator-on line 0

6058 78618 8

Unit reserve shutdown hours 0.0 0.0 0.0 9

Gross thermal-energy generated (MWH)

C 18833746 250701993 10 Gross _ electrical energy generated (MWH) 0 6285370 83179583 11 Net electrical energy generated (MWH) 0 6008693 79488089 12 Reactor Service f actor 0.0%

83.0%

83.7%

13 Reactor availability factor 0.0%

83.0%

83.7%

14 Unit Service Factor 0.0%

83.0%

82.5%

15 Unit Availability Factor 0.0%

83.0%

82.5%

'16 : Unit Capacity Factor (MDC) 0.0%

79.9%

80.9%

17 Unit Capacity _ Factor (DER) 0.0%

77.2%

78.2%

18 - Unit: Forced Outage Rate 0.0%

1.0%

4.1%

'19 Shutdowns scheduled over next 6 months (type,-date, du ra ti".1)::

_20 [If shutdown atl end of report-period, estimated date of Startup:

-11/25/97-9711250209 971117 PDR ADOCK 05000354 -

R-PDR c-1

DOCKET NO.,

50_-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:

F.

Todd TELEPHCNE:

(609) 339-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH OCTOBER 1997 METHOD OF SHUTTIN G

DOWN THE TYPE REACTOR OR F= FORCED DURATIO REASON REDUCIN CORRECTIVE N

G NO.

DATE S= SCHEDULE (HOURS)

(1)

POWER ACTION / COMMENT s

D (2) 1 10/1 S

745 Hrs C

2 Refuel Outage 10/31 A: F,quipment 11 Manual Eatlure 2: Mariu a l B: Maint or Test Scram C: Refueltr.g 3:

D: Regulatory Automatic Restrict!cn Scram L: Operator 4: Other Traintrig and Licensee Exam F: Administrative G: Operational Error H: Other in f.' ;

b

DOCKET NO.

50-354 UNIT: Hope Creek DATE: 11/06797 COMPLETED BY:

F.

Todd TELEPilONE:

(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0_

17 0,

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 f,

22 0

7 0

23 0

0 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 9

28 0

13 0

29 0

.4 0

30 0

15 0

31 0

16 0

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 11/06/97 COMPLETED BY:

R.

Ritzman TELEPHONE:

(609) 339-1445 REFUELING INFORMATION MONTH OCTOBER 1997 1.

Refueling information has changed from last month:

Yes X

No 2.

Scheduled date for next refueling (RF07): currently in refueling outage 3.

Scheduled date for restart following refueling:

11/25/97 4A Will Technical Specification changes or other license amendments be required?

Yes No X

B.

Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORCi ?

Yes No X

If no, when is it scheduled?

10/22/97 5.

Scheduled date(s) for submitting proposed licensing action:

N/A 6.

Important licensing considerations associated with refueling:

None 7.

Number of Fuel Assemblies:

A.

Incore 764 B.

In Spent Fuel Storage 1708 8.

Present lir ;nsed spent fuel storage capacity: 4006 Future spen'. fuel storage capacity:

4006 9.

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

5/3/2006(EOC13)

(Doea allow for full-core 3ff-load)

(Assumes 244 bundle reload. every 18 months until then)

(Does not allow for smaller reloads due to improved fuel)

DOCKET NO.: 50-354 UNIT: llope Creek DATE: 11/06/97 COMPLETED BY:

F.

Todd TELEPilONE:

(609) 339-1316 MONTHLY OPERATING

SUMMARY

HONTH OCTOBER 1997 For the month of October, the Hope Creek Generating Station continued the seventh refueling outage.