. _ . - - - .. -

l t

INDEX i

i NUMBER i SECTION OF PAGES Average Daily Unit Power Level .. . . . . . . . . . .1 Operating Data Report.. . . . . . . . . . .2 Refueling Information.. ... . .. . . . . . ..... . .1 Monthly Operating Summary.. . . . ... .. . . . ... .1 Summary of Changes, Tests, and Experiments.. .. .. . . .6 l l

I i

l l

l l

I i

l

, l

< 9609250226 960912 PDR ADOCK 05000354 i 4

. R PDR l i

DOCKET NO.: 50-354 UNIT: Hooc Creek DATE: 9/05/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1777 AVERAGE DAILY UNIT POWER LEVEL MONTH AUGUST 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1126 17 1035 2 1034 18 1028 ,

3 990 19 1034 4 1037 20 1035 5 1032 21 1040 >

6 1030 22 1027 7 1032 23 1027 8 1036 24 1031 9 1047 25 1033 [

10 1014 26 1033 11 1042 27 1032 12 1039 28 1031 13 1036 29 1036 14 1043 30 1037 15 1034 31 1036 16 1038 I

l 4

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/05/96 COMPLETED BY: R. Harris 1 TELEPHONE: (609) 339-1777 OPERATING DATA REPORT OPERATING STATUS

1. Reporting Period August 1996 Gross Hours in Report Period 744
2. Currently Authorized Power Level (MWt) 3293 l

Max. Depend. Capacity (MWe-Net) 1031 l Design Electrical Rating (MWe-Net) 1067

3. Power Level to which restricted (if any) (MWe-Net) Egnen
4. Reasons for restriction (if any)  !

l i

This Month Yr To Date Cumulative

5. No. of hours reactor was critical 744.0 3993.2 70917.1
6. Reactor reserve shutdown hours M M (LO
7. Hours generator on line 744 3835.4 69777.0
8. Unit reserve shutdown hours 0.0 0.0 0.0 *
9. Gross thermal energy generated (MWH) 2419238 12099870 222874119
10. Gross electrical energy generated (MWH) 803660 4035111 73860733
11. Net electrical energy generated (MWH) 770453 3844537 70561772
12. Reactor service factor 100.0 68.2 83.4 .
13. Reactor availability factor 100.0 68.2 83.4
14. Unit service factor 100.0 65.5 82.1
15. Unit availability factor 100.0 M5 82.1
16. Unit capacity factor (using MDC) 100.4 63.7 80.5 17, Unit capacity factor (using Design Mwe) 97.1 61.5 77.8
18. Unit forced outage rate 0.0 0.0 4.8
19. Shutdowns scheduled over next 6 months (type, date, & duration):
20. If shutdown at end of report period, estimated date of start-up:

i

~

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/05/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1777 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER RFDUCTIONS  ;

MONTII AUGUST 1996 l

METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS n/a l

j

4 1

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/05/96 COMPLETED BY: L. Keplev TELEPHONE: (609) 339-1106  !

, REFUELING INFORMATION MONTH AUGUST 1996

l. Refueling information has changed from last month:

Yes _ No X

2. Scheduled date for next refueling (RF07): 9/6/97
3. Scheduled date for restart following refueling: 11/5/97 4A. Will Technical Specification changes or other license amendments be required?

Yes No X B. Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORC)?

i Yes No X If no, when is it scheduled? To Be Determined for Cycle 8 COLR

5. Scheduled date(s) for submitting proposed licensing action:

Not required.

I 6. Important licensing considerations associated with refueling:

N/A

7. Number of Fuel Assemblies:

A. Incore 764 ,

B. In Spent Fuel Storage 1472

8. Present licensed spent fuel storage capacity: 4006 ,

Future spent fuel storage capacity: 4006 i

9. Date oflast refueling that can be discharged 5/3/2006 ,

to spent fuel pool assuming the present licensed capacity: (EOCl3) l (Does allow for full-core off-load)

(Assumes 244 bundle reloads every 18 months until then)

(Does Eqt allow for smaller reloads due to improved fuel) 1

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/05/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1777 MONTHLY OPERATING

SUMMARY

MONTH AUGUST 1996 e The Hope Creek Generating Station remained on-line for the entire month and operated at essentially 100% power for the month of August 1996 except one load ,

reduction identified below.

  • Power was reduced to 87% on August 3,1996 starting at 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> to perform monthly turbine valve testing. The unit was returned to 100% power on August 3, 1996 at 0900.

. At the end of the month the unit had been on-line for 160 days.

'I i